===OCR macOS Vision=== ===PAGE 1=== Meeting Minutes January 07, 2020 Prestint: Danton Mediaid, Mathew alison, sim LaVeck, John Henshaw, Absent: Caroline Griffis Also Present: Heather Lemieux, Dave Passios 1. Call to Order: 5:02pm 2. Public Comment: Comment from the Committee, Comment from the Public: None 3. Approval of Minutes: None 4. Review of the Vertex Reports for Town Hall, Ritter, Old Primary, TC Passios, Brooks The Committee examined line items listed in the Vertex Report to determine applicability to the capital plan. Mr. McQuaid expressed his desire to have building envelope maintenance projects such as roofing, masonry repair, and replacing of sealants included in the capital plan. The board determined that none of the vertex projects should be added to the FY 21 plan but should be considered in the 5. Discussion of Prioritizing Projects for FY21 Capital Plan, Vote may be taken. All FY21 Requests were considered and ranked both using the Collins Center scoring method and against Committee members opinions. Public safety projects were given added consideration. Attached please find a table listing FY 21 projects with both the Collins Center Scores and CPC Ranking. 6. Other Business/Action Items: None 7. Next Meeting: 21 Jan 8. Public Comment: Comment from the Public, Comment from the Committee: None 9. Adjournment: 6:13pm Motion by M. Allison 2nd by J Henshaw all in favor ===PAGE 2=== FM20-01 FM20-07 FM20-02 FM20-10 DPW DPW DPW DPW Town Hall, ADA Ramp/Sidewalk Ritter, Kitchen Remodel Ritter, ADA Ramp Design Cemetery Parking Lot at North Cemetery TOTAL Facilities PD16-14 PD19-01 PD20-01 PD16-18 Police Police Police Police FD17-05-B Fire FD16-20-A Fire FD20-01 Fire Police Vehicle, 1 Marked Police Vehicle, 1 Marked- New ACO Vehicle Portable Radios SCBA Complement, Replacement (1/2) ALS Equipment Phase 1 Midlife Overhaul of Squad 3 Subtotal Police Facilities Facilities Facilities Facilities Vehicle Vehicle Vehicle Equipment Equipment Equipment LPS16-19-C LPS19-03-A LPS19-02 Schools Schools Schools INFRA20-01 Highway DPW16-10 Highway DPW17-11 Highway Subtotal Fire TOTAL Public Safety THES, Asbestos Abatement/ Ceiling Replacement Design AC for Classrooms at Primary Admin Air Conditioning, THES Facilities Planning Facilities TOTAL Schools Flat Hill Culvert Trackless & Attachments (replaces 2008 Trackless) One Ton Dump with Plow (Ford Dump 350) Vehicles Vehicles TOTAL Public Works Total Capital Plan 22,000 12,000 25,500 20,000 386,500 67,000 67,000 26,000 45,000 205,000 115,000 54,800 65,000 234,800 439,800 123,500 10,000 28,000 161,500 112,500 170,000 58,833 341,333 | 1,329,133 | 100 54 71 57 62 82 71 49 76 55 54 11 tie 6 tie 4 6 tie 13 5 10 11 tie 9 83 40 43 101 52 37 3 17 16 2 12 18 17 12 14 RECEIVED & FILED JAN 2 2 2020 HE DARE RO LADD ГІРКА НАВИ