===OCR macOS Vision=== ===PAGE 1=== GREEN COMMUNITIES TASK FORCE PS -David Blatt, Chair go Joanne McQuaid, Secretary Zachary Cutting, Member MY -Neal Sullivan, Member C Michael Conway, Member John Londa, Advisor James Breault, Advisor Tel: 978-582-4147 ext 5 Fax: 978-582-4353 INCORPORA 960 Massachusetts Avenue Lunenburg, MA 01462 Minutes for 10/15/2014 Present: D. Blatt, M.Conway, J.Londa, McQuaid, N. Sullivan 1. Meeting called to order at 6:33 P.M. The Minutes from 3/25/14 and 7/15/14 were approved. 2. Update of Grant Application projects - Air compressor and VFD drive projects are completed but J. Londa stated no funds have been received by Town Hall from the DOER. The quote that J. Breault received for all the Town buildings was higher than estimated for the Grant but all the school building projects were under budget. The rebates still need to be added in. 3. Feasibility Study for the Public Safety Building oil to gas conversion -The quote to prepare it came in at $2,500.00. It would detail the scope of work, cost and possible savings. N. Sullivan proposed that we approve and submit the quote to the DOER. J.McQuaid seconded. Approved 4. Unitil and National Grid incentives - The companies meet with J.Londa, J. Breault and D.Blatt to discuss the new school complex. There are more incentives to change out the lighting; the more incentives the higher the gain. Currently fluorescent lights are specified. It would be more cost effective to install energy efficient fixtures during construction than to change them later. J.Londa said the electrical portion of the contract is currently out to bid, due by the end of October. LED lighting listed as "Alternative 1". The Contractor can choose from 3 types in each level recommended by the Architect. The School Building Committee can only influence the decision by selecting "Alternative 1" however, the MSBA will most likely reduce their contributions by the percentage of what was saved in incentives. We can send a letter to the School Building Committee with our recommendations. 5. J. Londa suggested we may need to update our planned projects depending on the outcome of the Building Re-Use Committee's report to the Select Board. Some projects may no longer be worthwhile endeavors and others may need addressing. Updated reports on oil usage by the Town are needed. We need to submit Quarterly Reviews and an Annual Report to DOER. 6. Primary School- discussion passed over. 7. Other- The State has approved an increase in net metering. J.Londa looking into a Request For Proposal for a solar installation on the new school complex. J.McQuaid will confer with the DPW about the installation of the Green Community signs. 8. Next meeting date: TBD. Meeting adjourned 7:32 P.M. Respectfully submitted, Granne the Quart Joanne McQuaid, Secretary RECEIVED & FILED DEC 30 2014 LUNENBURG TOWN CLERK OFFICE