===OCR macOS Vision=== ===PAGE 1=== David Blatt, Chair Joanne McQuaid, Secretary Zachary Cutting, Member Neal Sullivan, Member Michael Conway, Member GREEN COMMUNITIES TASK FORCE INCORPORAT 960 Massachusetts Avenue Lunenburg, MA 01462 Tel:978-582-4147 ext 5 Fax: 978-582-4353 dam Burney, Adviso ohn Londa, Adviso James Breault, Advisor Minutes for 5/14/2015 Present: D. Blatt, Z. Cutting, J.Londa, McQuaid, N. Sullivan 1. Meeting called to order at 6:00P.M. The Minutes from 3/18/15 were approved. 2. Project Update-Public Safety exterior lights and Library exterior lights and timers are completed. The Eagle House is mostly complete; still need to locate a few retrofits to replace some CFL's and decorative lights. To date $23,457.82 of the first disbursement check ($39,306.25) has been applied from the Grant total of $157, 225. Projects Approved but not Completed - THMS envelope tightening in progress, Library bollard lights, Town Hall lighting retrofit and envelope tightening, Public Safety Building - Gas Conversion Study. 3. New Projects 1) Teen Center - D. Blatt is generating a list of interior and exterior lights. Need to try one of the LED light bulbs to make sure they work in the existing fixtures. Programmable timers for the lights and thermostat may be applicable. Noted that insulation is lacking in the building. 2) Li- brary interior lights 3) Lunenburg Primary - lighting (resubmit) 4) THMS - LED conversion 5) Part-time person to oversee the program and projects. N. Sullivan suggested a collaboration with the local colleges. Students could collect data to use in projects. He will contact Fitchburg State Uni- versity to set up a meeting with the group. 6) Z. Cutting proposed solar electric hot water for the Public Safety Building. 7) Replace emergency lights at the Primary School. 8) Solar-J.Londa submit ted a RFP for a 300 kw solar roof installation on the new school (Power Purchase Agreement) which is about 40% of the energy cost. J. McQuaid will check with J. Rodriquez for any other potential projects. Z. Cutting suggested combining as many projects as possible into one submission so the ROI will look better for energy savings. N. Sullivan proposed and D.Blatt seconded that the next projects submitted should be the Primary School, THMS and Teen Center. All Approved. 4. Meeting adjourned 8:05 P.M. Next meeting TBD. Respectfully Submitted, panne Me Quaid Joanne McQuaid, Secretary