===PAGE 1=== Town of Lunenburg Park Commission Meeting Minutes April 26, 2025 TC Passios Gymnasium 1)A. Schiepers called the meeting to order at 10am. Present: A. Scheipers, C. Shapiro, K. Menard, C. Sullivan 2) Marshall Park Project Informational Presentation with Landscape Architect and Project Manager - Commission presented attached presentation. 3) C. Sullivan motioned to adjourn at 10:45am. K. Menard seconded. Passed 4-0 Anita Scheipers, Chair Colleen Shapiro, Vice Chair Karin Menard, Clerk Chris Sullivan, Member Tim Lawless, Member 960 Mass Ave. Lunenburg, MA 01462 978.582.4146 Parks@LunenburgMA.gov Scheipers Approved 7/30/25 ===PAGE 2=== Connecting Lunenburg Through A Shared Space Marshall Park Master Plan & Revitalization Project ===PAGE 3=== Project Discussion 1.WhyMarshall Park? 2.What Do We Get from This Project? 3.Proposed Scope Cost & How Do We Pay for It 4.Important Factors 5.Questions? ===PAGE 4=== 1. WhyMarshall Park?OPEN SPACE AND RECREATION PLAN 2019 to 2026|SECTION 8: GOALS AND OBJECTIVES Goal 1: Enhance and promote existing open space and recreation assets Objective 1.B: Master plan restoration and enhancement of key recreation resources Marshall Park: This resource was once the centerpiece of Lunenburg’s recreation and civic activities.Today, it mostly serves as baseball and softball fields for a limited portion of the year and serves a small segment of the town’s population.Thoughtful and coordinated revitalization of this unique resource could meet many identified town needs. A master plan should be developed to guide the revitalization of Marshall Park to maximize its use. ===PAGE 5=== Marshall Park Master Plan VisionGoal: to build a park that meets today’s needs, inspires tomorrow’s possibilities, and honors the rich history of our town. A shared outdoor space, connected with nature, history, and our town identity. Where Lunenburg residents of all ages and abilities come together for fun, fitness, and community. A community space that delivers the most value for the most residents, supports our schools and youth athletics, while fostering friendships, new connections, good health, and good times. ===PAGE 6=== Existing Conditions ===PAGE 7=== Specific Benefits Strengthens Schools: Renovation provides upgraded baseball and softball fields with improved facilities for middle and high school students. Supports Youth Sports: Improved facilities for Youth Ball League, offering a better environment for young athletes to play and grow. A Place for Young Families: An inclusive space featuring a universally accessible playground and picnic area, fostering outdoor fun and community connection. Supports Senior Health: ADA parking, accessible restrooms, and smooth walking paths for low-impact exercise. Maximum Financial Impact: Creates a multigenerational, multi-use space with one investment, benefiting all ages, abilities, and a variety of activities. Community: Space for community activities, pickleball, basketball and off-street walking. ===PAGE 8=== Summer 2019: Town accepted the current Open Space and Recreation Plan. May 2021: Town Meeting of $50,000 for the Marshall Park Master Plan. January - April 2022: Landscape architect firm, through public meetings, surveys, and community feedback, develops a Master Plan. November 2022: Town Meeting approves $184,000 for Master Plan Schematic Design. January 2023: Select Board allocates $1,000,000 ARPA funds for the project. June 2023: Schematic Design package delivered. Spring /Summer 2024: Owner's Project Manager (OPM) and Design Firm Hired. Fall 2024: Updated cost estimate based on schematic design revealed that Master Plan construction costs were prohibitive due to rising construction prices. December 2024 - March 2025: New implementation strategy and funding scope developed to align with financial feasibility, while meeting most of the Master Plan’s goals. May 2025: Town Meeting & Town Election votes to approve funding for the selected scope of the Master Plan. Project Timeline 2019 2019: Town accepted the current Open Space and Recreation Plan. May 2021: Town Meeting of $50,000 for the Marshall Park Master Plan. January - April 2022: Landscape architect firm, through public meetings, surveys, and community feedback, develops a Master Plan. November 2022: Town Meeting approves $184,000 for Master Plan Schematic Design. January 2023: Select Board allocates $1,000,000 ARPA funds for the project. June 2023: Schematic Design package delivered. Spring /Summer 2024: Owner's Project Manager (OPM) and Design Firm Hired. Fall 2024: Updated cost estimate based on schematic design revealed that Master Plan construction costs were prohibitive due to rising construction prices. December 2024 - March 2025: New implementation strategy and funding scope developed to align with financial feasibility, while meeting most of the Master Plan’s goals. May 2025: Town Meeting & Town Election votes to approve funding for the selected scope of the Master Plan. 202120252026 2024 20222023 OSRP approved by townMaster plan funded Master plan developed 25% Design funded in town meeting ARPA funding received 25% Design completed OPM hired LA hired 60% Design and updated estimate Town meetingMay December - March Spring June January December January - April May ===PAGE 9=== Marshall Park Master Plan ===PAGE 10=== Proposed Scope ===PAGE 11=== Costs for Construction DescriptionCost SoftCosts Professional Services Design Fees ‐ RDLA322,187 Owner's Project Manager ‐ Skanska351,320 Total‐ProfessionalServices673,507 Other Soft Costs: Permitting, Insurance, Utilities, Testing, Clerical134,024 Subtotal‐SoftCosts807,531 Contingency on Soft Costs 5%40,377 SoftCostsTotal847,908 DescriptionCost HardCosts DirectTradeCosts10,506,022 GCCosts GeneralConditions 1.5%157,590 InsuranceandBonds 1%106,636 Escalation 3.6%387,729 GCCostsTotal651,955 DesignContingency 10%1,115,798 Construction Cost12,273,775 Contingency on Hard Costs: 5%613,689 HardCostsTotal12,887,464 PROJECTTOTAL13,735,372 ===PAGE 12=== • $13,735,372 •Based on feedback from the Selectboard in Nov 2024 and in consultation with the current and previous Town Managers, the Parks Commission is proposinga debt exclusion borrowing to cover the construction cost of the proposed scope. •We would need a 2/3 votes at town meeting AND •A majority "Yes" vote on the town election ballot question Funding ===PAGE 13=== •Assuming an 18 Year Amortization of the Debt. •Roughly $0.46 per thousand of a home assessed value. •Example: For the Average Single-Family Home in Lunenburg with an estimatedassessed value of $504,937, the annual costwould be $231. •With the proposed scope, the tax impact would begin once principal payments start and remain steady each year until the loan is repaid. Early years may be lower while the project is still under construction. Estimated Tax Impact ===PAGE 14=== Selected for $1m grant in 2024 but couldn't meet the requirements in time and notified the state. Encouraged to reapply when the next round opens in early 2026. Selected for a $500K grant in 2024, but couldn’t meet the requirements in time and notified the state. Encouraged to reapply when the next round opens in late 2025. ParklandAcquisitions& RenovationsforCommunities (PARC)Grant LandandWater Conservation Fund GrantProgram(LWCF) MunicipalAmericanswith DisabilitiesActImprovement Upto$250K Playground, walkingpath,parking lot Upto$500Kforcommunities thatarelargerthan35,000 residentsorprojectswithmore than100parkingspaces.Cannot beappliedtosameproject features as the LWCFGrant. Up to$1 million forprojects thathavesignificantimpacton climateresiliency GRANTS AVAILABLE Applied for in 2024 but did notreceive. Next grant cycle shouldopen late 2025. ===PAGE 15=== Applied for in 2024 but did notreceive. Next grant cycle shouldopen late 2025. T-Mobile Hometown Grants AARP CommunityChallenge Mass Trails GrantMass MVP Grant Open to MVP Communities$25K We would apply for the Pickleball courts. Upto $50k for shovel ready projects that foster local connections. Up to 100k Grant opens again in early 2026. POSSIBLE GRANT OPPORTUNITIES Applications open quarterly. Grant opens again in early 2026 ===PAGE 16=== Maintenance CostsNew Maintenance ExpenseYearly Cost Mowing / String Trimming - year round17,000 Infield Mix Supply2,500 Mulching2,000 Plow Damage Repair2,500 Pavement / Walkway Maint2,000 Irrigation Maint / Repairs800 Net Maint & Yearly Setup500 Trash Collection & Labor3,500 FFE's Replacements2,500 New Maintenance Expense cont'dYearly Cost Fence Maintenance1,000 Stormwater Maint2,000 Bathroom Cleaning5,200 Misc Building Maint5,000 Play Structures & Surface Maint2,500 Electric600 Internet3,000 Sewer700 Total53,300 ===PAGE 17=== ScheduleActivityStartFinish Prep Final Design Package5/15/2509/30/25 Permitting7/15/2509/15/25 Bid Process Prep bid documents10/1/2510/10/25 Bid Period (assumes Ch. 30)10/13/2511/07/25 Bid Review and award11/10/2512/05/25 Construction Notice To Proceed12/8/25 Submittals and purchasing12/8/2503/06/26 Begin sitework3/9/26 Site construction3/9/265/31/27 Post-construction Contract closeout6/1/2707/30/27 Planting warranty6/1/2705/31/28 ===PAGE 18=== Town Elections Majority "Yes" Vote Saturday, May 17th- 7am - 5pm TCP Gymnasium - 1025 Mass Ave Next Step ===PAGE 19=== Thank You !! ===PAGE 20=== ===PAGE 21=== ===PAGE 22=== ===PAGE 23=== Marshall Park Master Plan ===PAGE 24=== Proposed Scope ===PAGE 25=== If a reduced funding scope is preferred, the only option is to complete Phase 1/2B This provides parking off of Mass Ave, the accessible playground, the basketball court and pickleball courts, and the restroom/concession stand pavilion It does not touch the ball fields , nor does it add parking off of Chestnut Street Total Cost: $6,460,691 Tax Impact: $0.22/thousand (Avg $111/yr) Possible Reduced Funding Scope ===PAGE 26=== As part of design development, the proposed funding scope has been divided into three Implementation Areas, each with distinct uses and construction requirements. Implementation Area 1 (Light Blue) Includes new recreational features: pickleball and basketball courts, a universal playground, walking paths, and a picnic area. Also includes infrastructure improvements: parking, stormwater management, and accessibility upgrades. Scope Details ===PAGE 27=== Implementation Area 2A (Light Green) Revitalizes baseball and softball facilities, including new fields, dugouts, announcer’s booth, spectator seating, accessibility upgrades to meet necessary regulations, along with emergency access for player safety. A new parking lot on Chestnut Street will provide easy wheelchair access to the ball fields and walking paths along the north side of the park. It will also address known public safety concerns from Chestnut Street residents and Public Safety. Scope Details ===PAGE 28=== Current Park Maintenance Current Maintenance ExpenseYearly Cost Mowing / String Trimming8,500.00 Weeding / Spray Treatment1,425.00 Turf & Plant Maintenance2,800.00 Spring Cleanup400.00 Fall Cleanup1,300.00 Pruning100.00 De-Thatching500.00 Aeration500.00 Infield Maintenance5,500.00 Water2,400.00 Total23,425.00 Other Maintenance Costs Overseeding: As Needed - Contracted Services Winterize Fields: Tarps & Labor Parks' budget Snow Shoveling (new): +- 500 per storm Snow Plowing Parking (new): Facilities Plow Route Gas / Propane (new): Unknown Cost *Please note that these totals are budget estimates and funds are not necessarily dedicated to Marshall Park or the line item shown, actual spending varies each year based off of current conditions & needs. ===PAGE 29=== Marshall Park Master Plan •Improved parking on Chestnut Street •Improved Mass Ave parking lot Mass Ave designated pedestrian access entrance •Basketball court and three pickleball courts •Pavilion area for concessions and shelter •New Restrooms Facilities •Accessible Playground •New 90' diamond & New Softball Field •Walking paths •Dog Park •Connection of main park area to Marshall Pond via 4' wide path to an overlook on the South-West side of the pond •Marshall Pond parking area, picnic area and pond overlook