===PAGE 1=== TOWN OF L UNENBURG Office of the Planning Board Tanner Cole, Chair Tel: (978) 582 -4147, ext 5 Matthew Allison, Vice Chair Fax: (978) 582 -4353 Matthew Brenner, Clerk 960 Massachusetts Avenue Erik Torgersen , M ember Lunenburg, MA 01462 Amanda Reid, Member Adam R. Burney Land Use Director Marjorie J. Boggio Administrative Assistant Minutes Public Hearing 260 Falulah Road May 23, 2022 Meeting Posted: Yes Place: Town Hall, 17 Main Street, Lunenburg, MA Time: 7:52 p.m. Present: Tanner Cole, Matthew Allison, Matthew Brenner, Amanda Reid Adam Burney participated remotely under the Act relative to extending certain COVID -19 measures adopted during the state of emergency. Absent: Erik Torgersen The Hearing was to hear and review application s for site plan approval and stormwater management permit under Chapter 250 Section 8.4. and Chapter 204 respectively of the Code of the Town of Lunenburg for construction of a 367,000 sq. ft. warehouse and distribution building on Airport Road/Crawford in Fitchburg, MA, with a portion of the development extending into Lunenburg at 260 Falulah Road. Owner - Fitchburg Redevelopment Authority, Fitchburg, MA. Applicant - Fitchburg Land Property Owner, LLC, Boston, MA. Christopher Anderson, Hannigan Engineering, represented the applicant. The property was currently vacant land. Access to the site would be on the Fitchburg side from Crawford Street/Airport Road. There would not be any tie -ins to Lunenburg roads. There would be two a ccess points with one of them being specifically for trucks and the other for employees and pedestrian vehicles. Stormwater was split between two systems. One in Fitchburg on the westerly side of the building consisting of two infiltration basins designed to accommodate the flow from ¾ of the site. The second system consisted of underground storage systems and infiltration basins directing flow to the southerly entrance (truck entrance). Sewer and water w ould be provided by Fitchburg. It was noted that a review letter from Graves Engineering, Inc. was received this date. The Plan would be revised to address the review comments. This evening’s hearing was for a basic introduction of the proposed project to the Board and members of the public. M. Allison made Motion to continue the Hearing to July 11, 6:05 p.m., M. Brenner Seconded, Motion passed. Hearing recessed 8:06 p.m. Documents used at meeting: Applications for Site Plan Approval & Stormwater Permit dtd April 19, 2022 Review letter dtd May 23, 2022, Graves Engineering Inc.