===OCR macOS Vision=== ===PAGE 1=== 1 2 Name Loxi Jo Calmes Michael Mackin Colleen Shapiro Tom Alonzo Greg Bittner Mark Erickson Mike Barney Brian Frank Greg S. Roy Kerry Lafleur John Londa Brian Spadafino Tim Santry Charles Hay Jen Littlefield Stuart Lesser Jeffery Luxenberg Inga Knox Robert Alger Rob Juusola Michael Kearns Jonathan Hirst Philip Conroy Discussion Lunenburg Superintendent of Schools, LSBC Lunenburg School Committee, Chair Lunenburg School Committee, LSBC Member BOS Representative, LSBC Member Planning Board, LSBC Member Finance Committee, LSBC Vice Chair Citizen, LSBC Member Citizen, LSBC Member Citizen, LSBC Member Town Manager, LSBC (non-voting member) Director of Facilities, LSBC (non-voting member) LHS Principal, LSBC (non-voting member) Lunenburg Public Schools Principal-in-Charge, Tappé Architects Tappe Architects NV5 NV5 NV5 NV5 NV5 Shawmut Design & Construction Shawmut Design & Construction Shawmut Design & Construction Call to Order The meeting was called to order at 6:34 PM by Mr. Mackin, Chairperson of the Lunenburg School Building Committee. Business • Next meeting will be held on May 11, 2016 at 6:30pm at Thomas C. Passios Page 1 of 4 (LSBC) (LSBC) (LSBC) (LSBC) (LSBC) (LSBC) (LSBC) (LSBC) (LSBC) (LSBC) (LSBC) (LSBC) (LSBC) (Tappé) (Tappé) (NV5) (NV5) 9 ===PAGE 2=== 4 5 6 Chair's Report No chair's report this meeting Approval of School Building Committee Minutes The Lunenburg School Building Committee reviewed minutes from the following meetings: • March 23, 2016 LSBC Meeting Motion: There was a comment on public comment section of the meeting minutes. NV5 will amend and resubmit the meeting minutes from March 23, 2016. Lunenburg School Building Committee voted to approve the meeting minutes from March 23, 2016 upon submission of amended content. Monthly Invoices NV5 (NV5) presented monthly progress invoices for work completed through March, 2016 for NV5 (OPM), Tappe Architects (Designer), Shawmut Design & Construction (Payment Requisition No.20) and Service Invoice from Blanchard Piano Service Invoice. Motion: The Lunenburg School Building Committee voted to approve the March, 2016 invoices as presented by NV5 (NV5). The motion was unanimously approved. Page 2 of 4 10 ===PAGE 3=== double sided monochrome LED digital sign, located at the Mass. Ave entrance driveway. The sign is supported on steel channels between two 12"x12" granite pots. Costs include misc. metals, granite, electrical / data work, LED sign, software and training. Motion: The Lunenburg School Building Committee voted to approve Change Order No. 10 as presented by Shawmut and NV5. The motion was approved with (1) one opposing vote. Change Order No.11: Furnish and Install New Maintenance Garage (Add $56,415.00) CR062 New Maintenance Garage. This Change Order is for the provision of a new 30'x40' metal maintenance building on the north side of the Turkey Hill School to house the equipment being displaced when the demolition of the existing maintenance shed occurs in Phase2 of the LMHS project. Cost includes demolition of the portable classroom building currently on the new site, the metal building, full concrete foundations and slab, and electrical work. Motion: The Lunenburg School Building Committee voted to approve Change Order No. 11 as presented by Shawmut and NV5. The motion was unanimously approved. Change Order No.12: Provide Added Cooling to Classroom Wings (Add $528,815.00) CR060 (RFP-023) This Change Order is for the provision of additional cooling for the perimeter classrooms in the A and D-wings of the building. Cost includes mechanical equipment and associated electrical connection misc. metals support on the roof roofing work CT ceiling removals and reinstallation cleaning and CM supervision. Motion: The Lunenburg School Building Committee voted to approve Change Order No. 12 as presented by Shawmut and NV5. The motion was approved with (1) one opposing vote. Page 3 of 4 11 ===PAGE 4=== 9 Motion: The Lunenburg School Building Committee voted to approve Change Order No. 13 provided that the description on the all change order documentation will be changed to say "Stadium Wheelchair Lift Enclosure" in lieu of "Wheelchair Lift Enclosure at Football field". The team will make that change for final signatures. The motion was unanimously approved. Construction Activity Update A construction update image slideshow was presented at the meeting. Note: Weekly Construction Meetings are on Wednesdays at 10:00am in the Shawmut trailer. Everyone is welcome to attend and walk the site. Rob Alger is available to set up time for site visit. 10 11 Public Comment No Public Comment. Adjournment The meeting was adjourned at approximately 6:55 pm. These meeting minutes were prepared by NV5 (NV5). Please notify NV5 within 48 hours of receipt of this document regarding any required corrections or clarifications. Page 4 of 4 12