# finance-committee — 4 documents, concatenated for reading and search # # This is a CONVENIENCE BUNDLE, not a source. Every document below is # published separately and byte-identically; cite the individual file, # whose path is given in each header, rather than this bundle. # Index of all boards: https://lunenburgbudgetproject.org/minutes/INDEX.txt # The town's own scanned original is linked per document. ======================================================================================== DOCUMENT : 2016-02-25-minutes-2231.txt BOARD : finance-committee DATE : 2016-02-25 KIND : minutes OUR COPY : https://lunenburgbudgetproject.org/docs/minutes/text/finance-committee/2016-02-25-minutes-2231.txt TOWN PDF : https://www.lunenburgma.gov/AgendaCenter/ViewFile/Minutes/_02252016-2231 ======================================================================================== ===OCR macOS Vision=== ===PAGE 1=== Finance Committee: Mark Erickson, Chairman Terri Burchfield, Vice-Chairman John Henshaw, Secretary Karin Menard Jay Simeone Town of Lunenburg Lunenburg Finance Committee Wak Endi Minutes February 25, 2016 17 Main Street, P.O. Box 135 Lunenburg, MA 01462-0135 978.582.4139 FAX 978.582.4148 Location: Present: Also Present: Town Hall Mark Erickson, Terri Burchfield, Jay Simeone, Karin Menard, John Henshaw Karen Brochu, Municipal Finance Director, Jack Rodriquenz, Director of Public Works 1) Mark E. called the Finance Committee meeting to order at 7:00 pm. He announced that this meeting is broadcast on the Lunenburg Public Access Cable Channel. The video recording is posted on YouTube at https://www.youtube.com/user/LunenburgAccessand select Finance Committee 02.25.16. 2) Comments: a. Public: None b. New Communications: i) There will be a planning board meeting on 3/14/16 to amend two protective by-laws of the Town and to hear a re-zoning request. Note: These minutes are an overview of this presentation. For specific details, copies of Jack Rodriquenz, Director of the DPW are attached to these minutes which are on file in the Town Clerk's 3) Department of Public Works, FY2017 Budget. Presented by Jack Rodriquenz, Director of the DPW. Department of Public Works Fiscal 2017 Budget Presentation by Director Jack Rodriquenz. Below is a summary of the presentation. For details you can access the presentation on the Finance Committee Page on the Lunenburg On-line site. Overview: The FY17 recommended budget is $40,191, or 2.7% higher than the FY16 recap. The budget includes one additional staff member in the highway labor account at $35,702. This is to fill an open requisition from a couple of years ago. The increase net of this addition is $4,489, or 0.3%. Effects on Current Service Levels: • The FY17 recommended budget funds the DPW at a level sufficient to provide services at the same level as in the past few years. • However, there is nothing extra in the budget for increases in expenses (e.g. salt and sand or gasoline) that are beyond the department's control. Mn-FY16-160225-Draft.xlsx (local and remote drives) 1 of 3 ===PAGE 2=== Future Challenges and Opportunities: • There is nothing in the budget for maintenance of some Town buildings (e.g. TC Passios) which is a vulnerability. • The vehicle replacement schedule driven by the amount of capital funding is a key factor driving vehicle maintenance costs. • Unfunded mandates including: • Updating signage when older signs require replacement, stormwater management system. • Stormwater system management system upgrade. Land Use Fiscal 2017 Budget Presentation by Land Use Director Adam Birney Overview These line items are requests for funding of some above target items in their FY17 Budget: • $600 in materials to repair and maintain bridges with volunteers providing the labor. • $1,000 in educational materials (e.g. flyers) covering wetlands, information on Town Conservation Lands, and trails in these conservation lands. • Information kiosks to make these materials available to the general public. There is the possibility for grant funding. However, these are very small line items, that may not lend themselves to grants. Because of the nature of conservation lands, it does not readily lend to user fees. 4) Mark relayed the Town Manager's news that that the Monty Tech assessment has come in at $65,641 more than expected due to enrollment of 13 more students from Lunenburg which increases the enrollment from 78 to 91 students from Lunenburg. 5) Minutes: John reported that the minutes are not ready yet. 6) Committee and Department Updates: Committee/Department DPW-John H. Capital Planning-John H. Update Public Access Cable-John H. Library-TerriB. Public Safety-Terri B. Schools-Karin M Monty Tech-Karin M. Council on Aging -Karin M. No report. No report. Working on plan for fy17. Going to negotiate with Comcast to increase their payment to PACC. By statute the range is 2½% to 5%. Lunenburg is at 2 ½%. Survey of other Towns shows in the 4% to 5% range. The PACC sees an opportunity to increase funding from Comcast to a level No report. No report. No report. No report. No report. Mn-FY16-160225-Draft.xlsx (local and remote drives) > of 3 ===PAGE 3=== Sewer Commission-Jay S. Green Task Force-Jay S. The commission approved their FY17 budget. They are doing an RFP for three one-year maintenance contracts, and are starting their manhole inspections. No report. School Bldg. Comm.--Mark E. No report. Building Re-Use-Mark E. No report. 7) Next meeting: March 3 - with FY17 budget presentations from the school department and the library. 8) Mark reminded the Town that this committee remains two members short of the seven members called for in the Town Charter and invited those interested to fill out a talent bank form. 9) Adjournment: Terri made a motion to adjourn and Karin seconded the motion. The committee approved the motion 5-0 at 8:21. Respectfully submitted by John Henshaw March 6, 2016 Attachment: DPW FY17 Presentation Mn-FY16-160225-Draft xIsx (local and remote drives) 3 of 3 ===PAGE 4=== 2/25/2016 Department of Public Works -03 FY 17 Budget Snow Account FY16 Year-to-Date Account Overtime Contract. Serv. Supplies Hired Equip. TOTAL Appropriation IYTD Expended $18,000 $129,500 $120,000 $7,500 $275,000 $14,296 $42,464 $147,187 In the Pipe-Line (Approx.) $10,565 $23,680 $6,656 TOTALS $203,946 $40,901 $24,860 $66,144 $153,843 $0 $244,847 Estimated Remaining YTD 2/18/16 : $30,153 FY16 $275,000 FY17 $275,000 ===PAGE 5=== Snow Storm Information Date Start Time 12/26/2015 10:30:00 PM End Time 2:30:00 AM 12/29/2015 12:30:00 AM 8:00:00 PM 12/30/2015 5:00:00 AM 7:00:00 AM 1/9/2016 6:30:00 AM 10:30:00 AM 1/12/2016 5:00:00 PM 3:00:00 AM 1/13/2016 5:00:00 AM 7:00:00 AM Monday, February 22, 2016 Loads In-House Contractors Snow Depth Ice Comments 14 9 0 • called the men in @ 10:30pm frezzing rain, made a sanding run. Materials sand $367.00 salt $938.00 Total Materials $1,295.00 Labor $1,030.00 total storm cost $2,325.000 56 14 16 32 12 9 11 8 17 1 0 ice 2" • Snow changed to sleet early morning, Made sanding runs sleet changed to frezzing rain had sub contractors plow off the 3' of snow, frezzing rain remained over night, made sanding run before commute! D.P.W labor $5,017.00 $ 8,675.00 Total Labor $13,692.00 Materials Salt $2,280.00 Sand $867.00 Total $3,147.00 $16,839.00 • POLICE CALLED 5:00AM BLACK ICE, HAD THE MEN MAKE A SANDING RUN, EVENT ENDING @9:00 AM. MATERIALS SAND $357.00 SALT $951.00 TOTAL MATERIALS $ 1,295.00 TOTAL LABOR $1,093.00 TOTAL SANDING RUN $2,388.00 • Police called at 6:30am, Made sanding run Icy conditions ! Materials Sand $410.00, Salt $1,072.00 total Materials $1,482.00 Labor $1,803.76 Total sanding run $3,285.76 • LIGHT SNOW STARTED @ 5:00PM MADE 2 SANDING RUNS, MATERIALS SALT $2,144.00 SAND $816.00 TOTAL MATERIALS $2,960.00 LABOR D.P.W $2,572.26 1 SUB CONTRACTOR $922.05 TOTAL LABOR $3,494.65 TOTAL STORM COST $ 6,454.05 ICY SP M POLICE CALLED @5:00AM ICY SPOTS TOWN WIDE, SENT D.P.W MEN OUT ON SANDING RUN, MATERIALS SAND $153.00 SALT $402.00 TOTAL MATERIALS $555.00 D.P.W LABOR $514.52 TOTAL STORM COST $1,069.52 Page 1 of 4 ===PAGE 6=== Date 1/13/2016 Start Time 5:00:00 AM 1/16/2016 6:30:00 AM 1/16/2016 6:30:00 PM 1/17/2016 9:00:00 PM 1/18/2016 12:00:00 AM 2/5/2016 4:00:00 AM Monday, February 22, 2016 End Time 7:00:00 AM 1:00:00 PM 10:30:00 AM 12:00:00 AM 11:00:00 AM 6:30:00 PM Loads In-House Contractors Snow Depth Ice Comments 6 SPOTS • POLICE CALLED ICY SPOTS TOWN WIDE, SENT THE D.P. W MEN SPOT SANDING, MATERIALS SALT $804.00 SAND $306.00 TOTAL MATERIALS $1,110.00 TOTAL LABOR D.P.W $514.52 TOTAL STORM COST $1,624.52 30 16 16 18 36 9 7 8 10 1 1 1 19 19 LIGHT • POLICE CALLED FOR LIGHT SNOW DID A SANDING RUN AND SOME SCRAPEING, 9 TOWN EMPLOYEES 1 SUB CONTRACTOR, MATERIALS $ 2,775.00 LABOR SUB $799.11 L.D.P.W $2,132.26 TOTAL LABOR $2,931.37 3" 3" 8" V POLICE CALLED @ 6;30PM ROADS ICING UP MADE A SANDING RUN ! SALT $1,072.00 SAND $408.00 TOTAL MATERIALS $1,480.00 LABOR 1 SUB 4HRS $491.76 7 D.P.W. 4 HRS $4,917.76 TOTAL LABOR $ 1,520.80 TOTAL STORM $ 3,000.80 • POLICE CALL LIGHT SNOW, MADE SANDING RUN ROADS TURNED BLACK & WET. SNOW GOT HEAVY @ TIMES SNOW ENDING @ 5:30 AM CALLED IN SUB SALT $1,072.00 SAND $459.00 TOTAL MATERIALS $1,531.00 LABOR 1 SUB CONTRACTOR $491.76 D.P.W $771.78 TOTAL LABOR $1,263.54 TOTAL STORM COST $2,794.54 • CALLED IN SUB CONTRACTORS @ 5:30AM TO HELP SCRAPE ROADS, AND SANDED, SALT $1,206.00 SAND $459.00 TOTAL MATERIALS $1,665.00 LABOR SUB CONTRACTORS $6,940.00 D.P.W $3,608.44 TOTAL MATERIALS/ LABOR $11,213.80 • CALLED DPW GUYS IN AT4:AM, CALLED SUB CONTRACTORS IN AT 8:30AM SNOW ENDED AT 2:30PM CLEANED UP AND WENT HOME AT 6:30PM SAND $2,070.00 SALT $1,206.00 TOTAL MATERIALS $ 3,276.00 DPW LABOR$4,592.56 SUB CONTRACTOR LABOR $ 15,615.00 TOTAL LABOR $20,208.56 TOTAL STORM COST $23,504.56 Page 2 of 4 ===PAGE 7=== Date 2/6/2016 Start Time 9:30:00 AM 2/7/2016 2/8/2016 5:30:00 AM 11:30:00 AM 2/10/2016 7:00:00 PM 2/15/2016 7:30:00 PM 2/16/2016 12:00:00 AM Monday, February 22, 2016 End Time 1:30:00 PM 9:30:00 AM 3:00:00 AM 11:00:00 PM 12:00:00 AM 12:00:00 PM Loads In-House Contractors Snow Depth Ice Comments 6 7 1" • DPW GUYS CAME IN TO SCRAPE ROADS, POST STORM, MATERIALS SALT $402.00 SAND $153.00 TOTAL SAND/SALT $555.00 LABOR$1,029.04 TOTOL STORM COST 3 3 27 • 8 21 7 18 7 8 19 0 2 18 V M POLICE CALLED ICE SPOTS TOWN WIDE MATERIALS $277.00 LABOR $432.00 TOTAL COST $709.00 3" • STARTED TO SNOW AT 11:30AM, MADE SANDING RUN WITH DPW AND 1 SUBCONTRACTOR, LIGHT SNOW ALL DAY MOST OF THE NIGHT, SAND $689.00 / SALT $1,809.00 TOTAL MATERIALS $2,498.00 DPW LABOR $3,936.00 SUB CONTRACTOR LABOR $8,675.00 TOTAL LABOR $12,611.00 COATI • POLICE CALLED AT 7:00PM SLICK ROADS, MATERIALS SALT $1,407.00 / SAND $535.50 TOTAL MATERIALS $1,942.50 DPW LABOR $1,029.04 TOTAL SANDING RUN $2,971.54 2-3 INC • POLICE CALLED ROADS GETTING SLICK, 7:30PM MADE A SANDING RUN, MATERIALS SALT $1,206.00 SAND $459.00 TOTAL MATERIALS $1,446.52 LABOR D.P.W $2,315.34 2 SUB CONTRACTORS LABOR $987.52 TOTAL LABOR $3,302.86 2-3 INC • CONTINUED FROM 12/15/16 CALLED SUB CONTRACTORS IN @ 5:AM TO CLEAN UP, MATERIALS SALT $1,206.00 SAND $459.00 TOTAL MATERIALS $1,665.65 LABOR D.P.W $3,087.12 SUB CONTRACTORS $8,675.45 TOTAL LABOR $10,410.54 TOTAL STORM COST COMBINDED 2/15/ 2/16 16 IS $15379.05 Page 3 of 4 ===PAGE 8=== Date 2/17/2016 Start Time 1:30:00 AM End Time 5:30:00 AM Loads In-House Contractors Snow Depth Ice Comments 7 ICY V POLICE CALLED @ 1:30AM ICY CONDITIONS TOWN WIDE, D.P.W GUYS MADE A SANDING RUN , MATERIALS SALT $804.00 SAND $535.00 TOTAL MATERIALS $1,339.00 D.P.W LABOR $1,029.00 TOTAL STORM COST $2,368.00 Monday, February 22, 2016 Page 4 of 4 ===PAGE 9=== 2/25/2016 Balanced Budget 003 o Target Number (level funding) = Level Service ca Level funding = Less than optimal Service or Clearly Defined Expectations 8 Perception: Os Taxes increase us Services decline + oR Reality: os Taxes increase os Level of service remains the same - ===PAGE 10=== 2/25/2016 Approx. Cost of Services to Average Homeowner Average Single Family Home: $256,969 Average Tax Bill FY16: $5,039.16 • Public Works-$340.56 • Education - $2,785.70 a Debt Exclusions - $534.50 • Public Safety - $401.36 • Gen Expense/ Benefits - $362.89 • Debt Service - $313.96 a General Government - $201.54 • Culture Recreation - $55.40 u: Human Services - $43.25 DPW Budget Allocation - $340.56 $51.02 to Paving $44.28 to Snow Facilities. General Highway - 75% Paving Public Buildings. DPW Garage Parks Tree Removal Cemetery. Vehicle Mtc./ Traffic Signs/ LHighway Labor LHighway OT Snow Removal ===PAGE 11=== 2/25/2016 Cemetery 03 ca Superintendent Salary Only or Perpetual care oR Sale of Lots FY16 $48,940 • FY17 $46,775 Parks o8 Town Facilities c3 Wallis Park c3 McNally Field os Fitzgerald Field os Marshall Park (4) or Track & Field Complex FY16 $71,974 • FY17 $71,348 ===PAGE 12=== 2/25/2016 Facilities & Public Buildings 08 DPW Garage o Public Safety Complex 08 Park Building 08 Town Hall o8 Cemetery Building o8 Eagle House • Protect our investment c8 Town Beach o8 Town Common ca Ritter Building o8 Teen Center ca Old Primary School o8 Veterans Park or Outsource VS In-House o8 Building Reuse Facilities: FY16 $359,919 Public Buildings: FY16 $265,451 • FY17 $365,307 FY17 $241,910 Vehicle Maintenance 08 Annual Capital Plan is Crucial • Advanced Technologies @8 Additional Mechanic Assistant FY16 $187,536 FY17 $192,419 ===PAGE 13=== 2/25/2016 Tree Removal ca Current Purchase of Service Allocation - $21,000 or Hazardous Tree Survey 081,181 Trees os Discretionary Service FY16 $30,500 FY17 $24,641 Traffic Signs & Devices o3 MUTCD Compliant os Manual of Uniform Traffic Control Devices c3 Unfunded Mandate FY16 $27,745 • FY17 $28,253 ===PAGE 14=== A Plant Health Care Consultant ARBORIST MA Certified Arborist # 1114 ISA Certified Arborist # 0716A American Society of Consulting Arborist TREE INVENTORIES - APPRAISALS - DIAGNOSIS - TREE RISK ASSESSMENTS November 23, 2015 Town of Lunenburg Attention: Jack Rodriquenz Department of Public Works Lunenburg, MA. 01462 Dear Mr. Rodriquenz, Enclosed is the Tree Risk Management Inventory on an Excel spread sheet as per your agreement. This inventory was started and completed in November 2015. All trees on the 95 plus miles of road in the Town of Lunenburg were visually inspected, including trees leaning or hanging over the roads that may potentially fail and fall into the right of way. One thousand one hundred eighty one (1,181) trees were recorded on the inventory data base. This data base is listed in column form and includes location using street name, pole numbers or house number (where we could find one). Tree species are identified using the common tree name, tree location private or town property, estimated diameter and estimated height. The trees are placed in the following risk categories; Extreme, High and Medium. Extreme is number one priority 1, High is number two priority 2, and Medium number three priority 3. You will see abbreviations where there was not enough space in the comment column: CD= Codominate stem (2 stems), MS= Multi-stems, (more them 2 stems), clumps = more than 2 separate trees in the close proximity. The diameter of the Codominant and multi-stemmed trees were added together which is indicated by the larger number in the estimated DBH column of the excel data. If you need additional information please contact me. Sincerely, Carl A. Cathcart Consulting Certified Arborist 149 Randall Road, Stow, MA 01775 • Phone (978) 764-6549 E-mail: carl.phe @Verizon.net • www.freeconsultant.com ===PAGE 15=== Location Street Summer st. 394 Summer St. 378 Summer St. 63 Grahm St. Grahm St Grahm St Grahm St 44 Grahm St 47 Grahm St. Grahm St 42 Grahm St 18 Graham St. 83 Whalom St. Whalom St. Whalom St. 140 Whalom St. Whalom St. Whalom St. 149 Whalom St. 152 Whalom St Whalom St. Whalom St. Whalom St. Whalom St. 297 Whalom St. 337 Whalom St 11 Buttonwood St. 40 John St 34 Hamlin St. 28 Hamlin St. 45 Otis St. 45 Burke St 45 Burke St. 41 Burke St. 785 West St Pleasant St. 727 West St. West St. West St. West St. West St. West St. 618 West St. 554 West St. 37 Wallis Park 25 Wallis Park 32 Kirby St. 38 Pierce Ave 38 Pierce Ave 40 Pierce Ave 40 Pierce Ave 40 Pierce Ave 48 Pierce Ave 48 Pierce Ave 62. Ramgren Rd 43 Ramgren Rd Youngs Rd Youngs Rd Youngs Rd 126 Youngs Rd Town of Lunenburg Tree Risk Assessment November 2015 Prepared by Carl A. Cathcart Consulting Arborist 149 Randall Road Stow MA, 01775 Priorit forityority 3 Tree # Common Priv. Prop Est. DBH Est. Height 51 1 Red maple X 15 50 10 2 Red oak 30 60 11 3 Red oak 50 60 Red oak 20 60 5 Red oak 60 Choke Cherry 45 Red oak 45 White ash 40 6 6 R & W oaks 50 5 10 Red oak 50 11 Red maple 50 12 4 R &W oaks 55 43 13 42 14 Red oak 50 Black Birch 41 15 Wt. Pine 40 16 American ash 39 17 American ash 39 18 American ash 39 19 Red oak 38 20 Sugar maple 38 21 Red oak 27 22 3 Elm 26 23 Lombardy Poplar 22 24 2 Horsechestnut 23 25 Red maple 14 26 Red maple 2 27 Sugar maple 28 Red maple 29 Red maple 30 White oak 31 White oak 32 Red maple 33 Red oak 2 & 3 34 2 Red oak 72 35 Little leaf linden 23 36 Choke cherry 66 37 Red oak 38 Red oak 64 39 White oak 63 40 Red oak 62 41 Red oak 62 42 Red oak 61 43 Red oak 55 44 3 Red Oak 5 45 Red oak 3 46 White oak 47 Red maple 48 Red maple 49 Red Oak 50 Red oak 51. White oak 4 52 Sugar maple 14 53 White Pine 14 54 White oak 6 55 Red oak 56 Red oak MS 167(1) 57 Red oak 2 58 Red oak 2 Red oak 5 60 2 Red oak 10 20 20 20 70 65 45 50 65 40 45 8 12 60 28/24 55 18 45 X 34 45 28 50 24 50 28 50 30 60 24 50 20 35 X 18 50 20 60 X 20 50 20 50 30 60 20 50 24 50 30 60 X 24 60 36 60 18 50 20 50 28 50 X 25 65 24 55 12 30 20 50 20 55 20 50 24 50 x 34 80 20 50 40 50 60 50 18 45 22 55 20 50 26 55 A Plant Health Care consultant Comments Deadwood prune Deadwood prune Deadwood prune Deadwood prune, east side road x Deadwood prune, east side road x Deadwood prune, west side of street x Deadwood prune, east side road Deadwood prune, west side of street Deadwood prune large DW over road Prune large DW over road Deadwood prune, east side road x Deadwood prune, east side road x Deadwood prune, east side road Remove, south side x Prune dead branches Remove, south side Prune branch leaning dead tree Remove x Deadwood prune, east side road Deadwood prune south side Deadwood prune corner tree west side Remove 3 dead, south side Deadwood prune north side x Deadwood prune north side Remove, north side Deadwood prune (4 Elizabeth St.) Remove, south side x Remove branch over road Remove, NE side x Deadwood prune Deadwood prune Remove, west side x Deadwood prune Deadwood prune, south side x x Deadwood prune decay trunk area Deadwood prune, south side Deadwood prune, south side Deadwood prune, south side Dead, remove x Deadwood prune, east side road Deadwood prune, east side road Deadwood prune, east side road Deadwood prune, east side road North side deadwood prune Prune branch over road Deadwood prune, west side of street Deadwood prune, west side of street Remove branch over road Prune branch over road, south side Deadwood prune Deadwood prune Remove Dead branch over road codominant stem Deadwood prune X Deadwood prune Deadwood prune Lg. deadwood over road, south side X Deadwood prune x Deadwood prune ===PAGE 16=== 2/25/2016 Compliance is Key o8 Lake Shirley Dam os Inspections & Emergency Plan @ Landfill os Inspections & Monitoring Compliant Storm Water ca Defined by Federal Rules as: os "Separate storm water system including ditches, curbs, gutters, storm drains, and similar means of collecting or conveying runoff that does not connect with a wastewater system (sewer)" or Unfunded Mandate c8 Compliant with 2003 permit c8 New round of permitting not released yet o8 Task Force FY16 $40,000 FY17 $50,000 ===PAGE 17=== LUNENBURG, MA EPA NPDES PHASE 2 STORMWATER - MS4 GENERAL PERMIT REVIEW - ENTIRE PERMIT Breakdown of Permit Requirements (Based on 2014 Draft Massachusetts MS4 General Permit) Item No. Requirement 1.7.2 Complete Notice of intent (NO) .... 1.9.1 Endangered Species Determination (complete review; certify in Notice of Intent) Deadline SECTION 1:- INTRODUCTION! 90 days from effective date 90 days from effective date 1.9.2 1.10 1.10.b 1.10.1 2.1.1.b 2:1:1.0 2.1.1.d 2.1.2 Historic Properties Determination (complete review; certily in Notice of Intent) 90 days from effective date Develop Written Stormwater Management Plan (SWMP) 1 year from effective date Update Best Management Practices (BMPs) Maintain copy of Stormwater Management Plan, make available to public 1 year from effective date Needs Specitic to Lunenburg Prepare and Submit Notice of Intent. evisit location of permitted stormwater discharges relative dangered species and ensure no adverse impact (Part of NO or develop BMPs to reduce impact. Revisit location of permitted stormwater discharges relative to historic properties and ensure no adverse Impact (Part of NOI) or develop BMPs to reduce impact. Develop written plan outlining activities and measures to be implemented to meet the conditions of the permit. The SWMF will be developed in Year 1 and then will need to be updated oi n ongoing basis throughout the permit term. Required content f the SWMP are auflined in Section 1.10.2 of the 2014 Draft M. MS4 General Permit. (contions of the nepent to spared as pat the ol process. Make SWMP available to the public at Town Hall and/or on Town website. FOr MS4 discharges to a water body with an approved TDLidentified in Part 2.2 1, comply with Part 2.2/1 and Appendix F of the Permit: 1 year from effective date SECTION 2 - NON-NUMERIC EFFLUENT LIMITATIONS 2.1 Water Quality Based Effluent Limitations: see Appendix F of the 2014:Draft Lünenburg does not currently have any water bodies with: MA MS4 General Permit approved TDLs that are regulated by the permit. For MS4 discharges to a water body that ie water qually limited and not subject to an approved TML or for municipalities located within Part 2.2:2a. b, comply with Part 2.2.2 and Appendix.H of the Permit Per Part 2.2.2, Lunenburg has been identified as a municipality that discharges to water bodies that are impaired due to phosphorus, or their tribufaries, and is therefore subject to the requirements of Appendix H. For Lake Shirley, the causes of the impairment are listed as. Excess Algal. Growth and Dissolved: isee Appendix H.of the 2014 Draft MA MS4 General Permit Oxygen, both of which have Total, Phosphorus, listed as the monitoring parameter. In addition to Total Phosphorus, another cause of the impairment for Lake Shirley is turbidity, where the monitoring paramenter is Total Suspected Solids. Therefore Lake Shirley is also impaired due to solids, and subject to the requirements of Appendix H. Part V. For all other discharges (not subject to the requirements of Part 2.1.1.b and Part 2.1.1.c of the Permit) contributing to a violation of applicable receiving water quality standards, eliminate condition causing or contributing to exceedance of water quality standards Written notification to MADEP & EPA as needed & documentation in the Town's SWMP regarding new or increased stormwater discharges If a discharge is identified that contributes to an exceedance of within 60 days of becoming aware of the situation applicable water quality standards, eliminate the conditions contributing to or causing the-exceedance within 60 days. as-needed Any new or increased stormwater discharges must satisfy MA antidegradation regulations. Estimated Cost to Comply $15,000 - $25,000 Costs included under 1.7.2; 1.10; H,I! and H.V: Cost included under IDDE under Item 2.3.4.2.a. Weston & Sampson Page 1 of 9 ===PAGE 18=== EPA NPDES PHASE 2 STORMWATER - MS4 GENERAL PERMIT REVIEW - ENTIRE PERMIT Breakdown of Permit Requirements (Based on 2014 Draft Massachusetts MS4 General Permit) Item No. Needs Specific to Lunenburg 2.2 22.1 Identify all outfalls/interconnections that discharge to waters with an approved TML or discharge to certain waters identified as "water quality limited water bodies" For MS4 discharges to a water body, with an approved TMDL, comply with Appendix F, Part A of the Permit H.i.1 a.l:2 Distribute clippings/fertilizer message to required audiences Distribute: pet waste mahagement message to Residential: Distribute leaf itter disposal message to Residential/Business/Commercial: 2.3,6.Ordinance to require: BMPs optimized for Phosphorus removal H.Il.1 ali.2 2.3.611.b to include consideration of BMPs that Infiltrate stormwater H.I.1 a.l.3 Grass-clippings procedures & blowing prohibited for: tor: property 2.3.7 Sweep streets/lots ≥2lyr spring & fall 2.2 - Discharges to Impaired Waters SWMP (1 yr) & annual MS4 Identify all outfalls or interconnections that discharge to water quality limited water bodies. see Appendix F of the 2014 Draft Lunenburg does not currently have any water bodies with MA MS4 General Permit approved TMDLs that are regulated by the permit. IMPAIRED - PHOSPHORUS (INCLUDES TRIBUTARIES) Annually in: March/April: Annually in. June/July. Develop and disseminate required public education information? Annually August October With 2.3:6; 2 years from effective Include in Town's Stormwater Management Bylaw a requirement date that new development and redevelopment stormwater BMPs be optimized for phosphorus removal: With 2.3.6.1.b; 4 years from: effective date With 2317,1 year from efective date: * Inventory and priority ranking of Town property and infrastructure that could be retrofitted with BMPs to Include consideration of BMPs that infiltrate: stormwater. Develop program to manage grass clippings and leaf litter on permittee owned property: Increase frequency of sweeping of public streets and municipal s 'Sweep at least twice/years: parking lots to a minimum of two times per year in drainage area tributary to Lake Shirley? :H.Ii.1.b Complete Phosphorus. Source Identification Report to include: (1) calculation of total MS4 area draining to the the impaired water or its tributaries; incorporating updated mapping of the MS4 and catchment delineations. produced pursuant to Part 2.3.46, (2) All screening and monitoring results pursuant to Part 2.3.4.7.d:; targeting the receiving water: segments); (3) Impervious area and DCIA for. the target catchment; (4) Identification, delineation and prioritization of potential catchments with high phosphorus loading; and (5) identification of potential retrofit opportunities or opportunities for the installation of structural BMPs during redevelopment, inclüding the removal of impervious area of permittee-owned properties. Develop Phosphorus Source Identification Report to Include the items listed in. Appendix H: H.l.1.c Complete Retroft Evaluation; including implementation plan & schedule 5 years from effective date; With Year 5 Annual Report H.Il.1.c Planinstall at least one structural BMP demonstration project 6 years from effective date aluate all permittee-owned properties identified as present trofit opportunities or areas for structural BMP installati under Part 2.3.6.d.ii. or identified in the Phosphorus Source Identification Report that are within the drainage area of the impaired water or its tributaries. Plan/install one structural BMP demonstration project. H.ll.1.0 Install remaining BMPs As per plan/schedule in Year.5 Annual Report Install remaining BMPs in accordance with the plan and schedule outlined. H.Il.1.c Track/report BMP installations & estimated Phosphorus removal HJI.2 Submit documentation that discharges do not contain Phosphorus Page 2 org Alternative: to. Requirements Hill. (above): When Approved by EPA/DEP treated by BMP, design storage volume of the BMP and estimated amount of phosphorus removed. ubmit documentation that discharges do not conta hosphorus through long-term monitorin Estimated Cost to Comply (1) (2) $2,500 - $3,500 per year over 5 year permit tem : (3) Cost included under 236.d.32 : Cost included under 2.3.7.a.i: Cost included under 2:3.7 alic & d. $7,500 to $10,000 $5,000 to $7,500 $25,000 to $75,000 (includes engineering design & construction) $50,000 to $150,000 pends on number of permitt vned properties for retro opportunity within the drainage area. Assume 2 additional locations. Budget 525,00 sign So er locationtor (2) Weston & Sampson ===PAGE 19=== EPA NPDES PHASE 2 STORMWATER - MS4 GENERAL PERMIT REVIEW - ENTIRE PERMIT Breakdown of Permit Requirements (Based on 2014 Draft Massachusetts MS4 General Permit) Item No. Requirement H.V.3 H.V:4.12 H.V,5) 2.3.2.a-d 2.3.2.e 2.3.2f 2.3.2g 2.3.3.a 2.3.3.a 233.b 2.3.3.6 23.4.2a 23.42a 23.44a If discharge is found to be to an Impaired Water, remove, condition or implement BMPs identified under Appendix H.V:4.1.16 and H.V.4.2; to reduce solids.) Deadline IMPAIRED - OIL/GREASE, SOLIDS OR MELALS (60 days from awareness (or plan/schedule)e Needs Specific to Lunenburg 2.3.6.Ordinance to require spill containment isolation for Commercial/Industrial properties With 2:3:6;2 years from ED Increased street sweeping & CB inspection/cleaning in targeted areas Annual Reports Eliminate condition causing or contributing to the impairment & document actions in SWMP include in Town's Stormwater Management Bylaw a requirement that for new development and redevelopment, stormwater management systems designed on commerical and industrial land use areas draining to the impaired water incorporate spill containment isolation. increase street sweeping and catch basin cleaning in high density areas with high pollutant load potential tributary to Lake Shirley The Town already sweeps street adjacent to water resources twice per year. Street sweeping and catch basin cleaning schedule to be determined by the permittee Catch basin sumpsito be no more than 50% 5 Submit documentation that discharges do not contain solids - Distribute at least 2 educational messages to each of 4 targeted audiences (residents, businesses/commercial/institutional, developers and industrial). Different messages to the same largeted audience shall be distributed at least one year apart. Identify method to evaluate effectiveness of message; implement Modify ineffective messages/methods Report on messages as per permit Alternative to Requirements H.V:1-4 (above). Sübmit documentation that discharges do not contain solids: When Approved by EPA/DEP through long-term monitoring. 2.3 - Requirements to Reduce Pollutants to the Maximum Extent Practicable (MEP) PUBLIC EDUCATION & OUTREACH Develop/distribute a minumum of 8 messages over the permit term. Educational messages can include brochures, begin year 1; continue throughout permit term newsletters, information posted to the Town's website, newspaper articles, public service announcements, displays in municipal buildings, etc. Determine method to evaluate message effectiveness; implement method. Modify message or distribution methods if applicable. Report progress in Annual MS4 Stormwater Report. Meet Public Notice requirements Make Stormwater Management Plan & Annual MS4 Storwater Report available to public not stated before next message distribution annual MS4 stormwater reports Cut PUBLIC INVOLVEMENT & PARTICIPATION continuous continuous sure that all public involvement activities comply with ste blic notice requiremer Public opportunity to participate in the review/implementation of the Stormwater Management Program annually lay be implemented through the use of Town website, Tow notline, clean-up teams, monitoring teams, or a stormwate advisory committee. Report progress in Annual MS4 Stormwater Report. Report on public participation opportunities ALICIT DISCHARGE DETECTION ELMINATON 60 days from detection or as liminate illicit discharges as they are identified or establish Eliminate illicit discharges expeditiously as possible chedule for elimination for discharges that cannot be remove within 60 days. Report dates of licit identification and schedules for removal annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. Eliminate SSO as expeditiously as possible and take interim Mitigate SSOs Expeditiously as possible mitigation measures to minimize the discharge of pollutants to and from the Town until elimination is completed. Page 3 org Estimated Cost to Comply Street sweeping cost included under 2.3.7 alic & d. Catch basin cleaning cost included under 2.3.7.a.ili.b. $10,000 - $20,000 for 5-year permit term ($2,000 to $4,000 per year) (Varies depending on whether materials are readily available or need to be developed from scratch.) (2) $2,500 - $5,000 for 5-year permit term ($500 to $1,000 per year) (assumes at least one activity annually over five years and that volunteer organizations will assist) (2) Budget $10,000 to $20,000 per year over 10 years as an allowance for removal of illicit connections. (2) Weston & Sampson ===PAGE 20=== A NPDES PHASE 2 STORMWATER - MS4 GENERAL PERMIT REVIEW - ENTIRE PERN eakdown of Permit Requirements (Based on 2014 Draft Massachusetts MS4 General Per Item No. Requirement 23.44.b 2.3.4.40 23.44d Complete Inventory of Sanitary Sewer Overflows (SSOs) Report SSOs Update SO inventory 2345 Develop outfall & interconnection inventory 2.3.4.5.b 2.3.4.5.b Report on outfall & interconnection inventory Physically label all MS4 outfalls with unique identifier 2.3.4.6 23.46.c 2.3.4.7 2.3.47.a 23.47.0 Map the MS4 features required & recommended in 2.3.4.6.a.i, li& iii Report on mapping progress Written IDDE program (include responsibility statement, written procedure for ouffal/interconnection sampling, written procedure for IDDE investigation) Adopt regulatory mechanism providing legal authority to prohibit/investigate/eliminate illicit discharges Complete initial ilicit discharge potential assessment and priority ranking based on existing information 23.4.7.cil Report on list of catchments and resulls of rankings Page 4 of 9 Deadline 120 days from effective date 24 hours of awareness annual MS4 sformwater reports 1 year from effective date Needs Specific to Lunenburg Identify all known locations where SOs have discharged within the previous five years. Provide verbal notice to EPA within 24 hours, and witen notice EPA and MADEP within 5 days. Report progress in Annual MS4 Stormwater Repor his requirement includes identifying each outfall an terconnection, recording its location and condition, an other actives. The vertay ned pians, the eins and identified under Item 2.3.4.5.c. The Town has approximately 450 falls and interconnections. Most of the Town's outfalls ha andition information has also be annual MS4 stormwater reports end of permit term Report progress in Annual MS4 Stormwater Report. All MS4 outfall pipes must be labeled in the field with a unique dentifier. The Town has approximately 400 outfalls. It appears hat a unique identifier has been added to all outfalls in GIS, anc this same identifier must be used to physically label all outfalls i the field. 2 years from effective date annual MS4 siormwater reports 1 year from effective date The Town has mapped their outfalls and receiving waters, br only limited mapping has been completed for the rest of th storm drain system. Anticipated mapping additions include: pipes; open channel conveyances; catch basins; drain anholes; interconnections with other MS4s; municipaily owne ormwater treatment structures; 450 catchment delineations and use impairments for water bodies on the 303(d) list. Unique ntifiers may also need to be added to all outfalls in GIS it. ady included or modification may be need eport progress in Annual MiS4 Stormwater Repor evelop a written IDDE Program to meet the conditions of ti permit. Should have been completed under 2003 permit. ction (Section 6.8) governing discharges to the municip storm drain system. 1 year from effective date issess and rank all outfall drainage areas ("catchments") for the potential to have illicit discharges and/or SOs. Develop matris to rank each outfall catchment area. Priority rank catchments based on where certain risk factors may he present as provide in the permit. The Town has approximately 400 outfalls, which annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. Estimated Cost to Comply Town Forces Town Forces (2) with dry weather screening (2) install.) $130,000 to $160,000 (2) $2,500 - $5,000 $10,000 - $15,000 (2) Weston & Sampson ===PAGE 21=== EPA NPDES PHASE 2 STORMWATER - MS4 GENERAL PERMIT REVIEW - ENTIRE PERMIT Breakdown of Permit Requirements (Based on 2014 Draft Massachusetts MS4 General Permit) Item No. Requirement 2.3.4.8.a Dry-weather outfall/interconnection screening & sampling (except Excluded & Problem Catchments) 2.3.4.8.b (eline saging, legment vestig, on procedure as per 2347 (Syalem Villerabily, it inspection, wet. 2.3.4.8.0 Complete IDE in all catchments, regardles of sampling resus. 2.34.8.ci Complete IDDE investigation in 80% of Problem Catchments 23.4.8.ci Complete IDDE investigation in 100% of Problem Catchments 2.3.4.8.C.il Complete IDDE investigation in all catchments where ouffal/interconnection screening information indicates sewer input based upon olfactory/visual evidence or sampling results 2.3.A.8.. Complete IDDE investigation in 40% of catchments 2.3.48.cii Complete IDDE investigation in 100% of catchments • 2.3.4.8.e 2.3.4.9 2.3.4.10 2.3.4.10 Conduct IDDE employee training Report on IDDE employee training 2.3.5 Implement & enforce Construction Site Stormwater Runoff Control (CSSRC) Program Page 5 of 9 Deadline 3 years from effective date Needs Specific to Lunenburg Inventory & complete dry weather screening & sampling of every MS4 outfall and interconnection. Dry weather sampling also need to be included at all outfalls tribufary to Lake Shirley to however, cost provided assumes lab analysis for ammonia, E.coll, surfactants, TSS and phosphorus, and test kits for temperature and chlorine. The Town has approximately 450 outfalls and interconnections. For budgeting purposes, it is assumed that all outfalls/interconnections would be visited once and 15% of all outfalls + interconnections will have dry weather Estimated Cost to Comply $50,000 to $75,000 ouffalls/interconnections) would need to be revisited and that 20% (5 outfalls/interconnections) would have dry weather flow. 3 months from written procedure; not more than 15 months from effective date Not specified (see 2-34.8.c.il) 3 years from effective date Assume that 30% of all outfalls/interconnections have at least one System Vulnerability Factor in its catchment, which triggers the requirement for wet-weather sampling. For this reason, the Budget Estimate assumes that 30% of the 450 outfalls/interconnections will require wet-weather sampling (135 5 years from effective date 5 years from effective date catchments. Catchments with no potential for ilicit discharges 5 years from effective date 1s 2347. Can entrance arise or lied under 10 years from effective date annual MS4 stormwater reports Report progress in Annual MS4 Stornwater Report. annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. Assume $40,000 to $50,000 in Year 2 for wet weather sampling. Budget $40,000 to $50,000 allowance per year in Years 2 to 10 for IDDE investigation and sampling. Budget $10,000 to $20,000 allowance per year in Years 2 to 10 for CCTV inspection and dye testing to investigate illicit connections. Budget allowance for removal of illicit connections included under 2.3.4.2.a. (2). (2) (4) (2) not stated paliant to storment metrom aporam to reductes per the 2003 Permit. Weston & Sampson ===PAGE 22=== PA NPDES PHASE 2 STORMWATER - MS4 GENERAL PERMIT REVIEW - ENTIRE PERMI reakdown of Permit Requirements (Based on 2014 Draft Massachusetts MS4 General Permi Item No. Requirement Deadline 2.3.5.c.i Adopt regulatory mechanism requiring use of sediment/erosion control at construction sites Should have been completed under 2003 permit. 2.3.5.c.ii 2.3.5.c.iii 2.3.5.cv Needs Specific to Lunenburg. The Town's Zoning Bylaws were amended at the December 5, 2007 Town Meeting to include Section 6.7, which regulates prevent impacts during disturbance and construction activities. The Town's Subdivision Regulations also require developers to repare and submit an Erosion Control Plan covering all phase f construction Leinet an oin for i net an and enterent ol meet permit requirements. Ensure that current requirements meet all the conditions of the permit, and revise as needed. (ailedy hute requirements in Town's CRC Program I not Estimated Cost to Comply. - (3) 2.3.5.c.v 2.3.6.a 2.3.6 he preite stil eat rate elepends for it resis and ein cant nears. in a on one seen to dura The angra shal read it the permite may to ten tore. 1 year from effective date Require developers to implement a sediment and erosion control program that includes BMPs appropriate for - the conditions at the construction site. not stated clude requirements for waste control, including but not limited to, discarded building materials, concrete truc rash out, chemicals, litter, and sanitary wastes, in the CSSRC ordinanc not stated Develop written site plan review procedures. Site plan review shall include a review by the permittee of the site design, the planned operations at the construction site, planned BMPs during the construction phase, and the planned BMPs to be used to manage runoff created after development. The review procedure shall incorporate procedures for the consideration of potential water quality impacts; procedures for pre-construction review; and 1 year from effective date procedures for receipt and consideration of information submitted by the public. Site plan review procedure shall include evaluation of opportunities for use of low impact design and green infrastructure. When the pportunity exists, the permittee shall encourage project proponents to incorporate these practices into the sit esign. The permittee shall track the number of site reviews, inspections, and enforcement action: / POST CONSTRUCTION STORMWATER MANAGEMENT Implement & enforce SW management for New Development/Redevelopment not stated Adopt regulatory mechanism that regulates runoff from new development/redevelopment should have been complied (3) (3) Lena an hat he lymes al ran rele procedures are in wien (3) Continue to moment an ere a roger to are post. redevelopment projects per the 2003 Permit. tormwater management for all development and redevelopmer rojects that disturb one (1) acre or mon Weston & Sampson Page 6of9 ===PAGE 23=== Item No. 2.3.6.a.i Requirement Amend existing regulatory mechanism to contain provisions at least as stringent as those outlined under Part 2.3.6.a.li which include: (a) designing stormwater management systems to retain the first inch of runoff from all impervious surfaces or provide pollutant removal equal to or greater than the level of pollutant removal provided through the use of bioinfiltration on the first inch of runoff from all impervious surfaces; (b) requiring the use of reatment BMPs instead of infiltration BMPs on sites with documented soil contamination and on industrial sites; (c) incorporating designs that allow for the shutdown and containment of BMPs designed to include infiltration near environmentally sensitive areas; (d) require BMPs to be constructed in accordance with The Massachusetts Stormwater Handbook Volume 2 Chapter 2; (e) require the development of a long-term operation and maintenance plan to inspect and repair installed BMPs; and (f) avoid disturbance of areas susceptible to erosion and sediment loss. Deadline Needs Specific to Lunenburg Estimated Cost to Comply 2 years of effective date new development/redevelopment projects where more than one acre is disturbed. Further enhancement may be needed to the existing O&M plan requirements to meet the conditions of the permit. he Town's existing Stormwater Management Bylaw current quires the submission of O&M Plans for the long-ter (3) 2.3.6.a.ili Develop procedures for Post Construction Stormwater Management to ensure submission of as-built plans within a year from completed construction, and long-term O&M of BMPs; include in written SWMP. 2.3.6. ail Report on measures to comply with 2.3.6.a.li in annual M4 stormwater report 23.6.b 2.3.6.0 2.3.6.d. & il 2.3.6.d.i 2.3.6.d.iv 2.3.7.a.i & i 2.3.7.a.ll Develop a report assessing street/parking design related to creation of impervious cover Develop a report assessing local regulations to allow the listed green practices Estimate baseline impervious area and annual increase/decrease in acres of impervious area inventory & priority ranking for permittee-owned BMP retrofits Report progress on implementation of BMP retrofits Develop written operation & maintenance procedures for municipal activities. Complete inventory of listed municipal facilities Page 7 oF9 1 year from effective date from completed construction. annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. Develop report assessing current street design and parking lot Report progress annually: complete 3 years from effective date guidelines and other local requirements impacting the creation o mpervious cover. Determine whether design standards can be modified to support low impact design. If modifications can be made, outline recommendations and proposed schedule for modifying applicable standards. Report progress annually; complete 4 years from effective velop a report assessing existing local regulation. termine the feasibility of making green infrastructure practi (green roofs, infiltration practices, water harvesting devices) allowable when appropriate site conditions exist. Develop method to track changes in impervious area as annual MS4 stormwater reports development/redevelopment occurs. Starting impervious area estimates available from EPA. Estimates to be included in Annual MS4 Stormwater Report each year. Complete an inventory and priority ranking of Town property and infrastructure that could be retrofitted with BMPs to reduce 4 years from effective date requency, volume and pollutant loads associated wit tormwater discharges annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. GOOD HOUSEKEEPING & POLLUTION PREVENTION FOR PERMITEE OWNED OPERATIONS Develop writen operation & maintenance procedures for parks 1 year from effective date and open space, buildings and facilities where pollutants are exposed to stormwater runoff, as well as vehicles and equipment. 1 year from effective date; review/update annually Develop inventory of all municipal facilties; Review inventory annually and update as necessary. (3) (2) $5,000 - $10,000 $5,000 - $10,000 (2) $10,000 - $20,000 (2) $7,500 - $10,000 Town Forces Weston & Sampson ===PAGE 24=== A NPDES PHASE 2 STORMWATER - MS4 GENERAL PERMIT REVIEW - ENTIRE PERA eakdown of Permit Requirements (Based on 2014 Draft Massachusetts MS4 General Perm Item No. Requirement 23.7.ajib Provide training on use, storage, & disposal of petroleum products to applicable staff 2.3.7.alli.a Written program detailing activities/procedures the MS will implement to ensure infrastructure is maintained in timely manner 2.3.7.alii.b ¡Develop & implement a plan to optimize catch basin cleaning & include in written SWMP 23.7.a.iii.b Implement routine inspection/cleaning/maintenance of catch basins to ensure sumps <50% full; report on activities as specified; investigate excessive sediment; log/report CB cleaning 2.3.7.alili.c & d. Sweep streets/parking lots 1x/year in spring; report on efforts 2.3.7.a.iid 2.3.7.alii.e 2.3.7.aitf 2.3.7.aiv 2.3.7.a.v Ensure proper storage of CB cleanings & street sweeping to prevent runoff Establish procedures for winter road maintenance stablish/implement procedures to inspect/maintain storm drains & structural BMPs; and for annual inspectio f treatment structure Report on all Good Housekeeping/Pollution Prevention requirements Keep written record of ali Good Housekeeping/Pollution Prevention activities 23.7.b Develop/implement written Stormwater Pollution Prevention Plans for required facilties as per permit Page 8 or 9 Deadline not stated 1 year from effective date 1 year from effective date continuous; annual MS4 stormwater reports Needs Specific to Lunenburg. rovide training on use, storage, & disposal of petroleur Estimated Cost to Comply (4) roducts to applicable municipal staf evelop written plan/schedule for activities such as stree weeping, catch basin cleaning, maintenance of structur BMPs, cleaning of storm drains, and assessment/upgrade of Cost included under 2.3.7.a.i. drainage system infrastructure. Develop and implement a plan to optimize inspection, cleaning and maintenance of catch basins to ensure that permit $5,000 to $7,500 conditions are met Clean catch basins as needed to ensure that no sump is more than 50% full at any given time. The Town has between 700 and The Town cleans their catch basins 900 catch basins town-wide and currently cleans all catch basins using Town staff and equipment. It is at least once every two years. Catch basins adjacent to water assumed that no additional esources are cleaned twice per year in the spring and the fall expenditures for catch basin cleaning Assume that the Town's currently cleaning schedule will mee wil be neutral spenasthe Town The Town currently sweeps all public streets and municipal parking lots annually. Roadways adjacent to water resources are swept twice per year. The Town will need to continue to annually; annual MS4 stormwater sweep streets in the drainage area tributary to Lake Shirley at reports least twice per year in the spring and the fall to meet the permit conditions outlined under Appendix H. Part I1.1.a.i.3. All nunicipal parking lots within the Lake Shirley drainage area wi Iso need to be swept twice per year in the spring and the fal The Town currently completes street sweeping using Town staff and equipment. It is assumed that no additional expenditures for street sweeping will be needed above what the Town currently spends. NA Examine storage of CB cleanings & street sweepings not stated Look at storage and usage of salt and sand; evaluate opportunities for use of alternative deicers. not stated He alter mean procedures on premain strom drains. minimum. annual MSA stormwater reports Report progress in Annual MS4 Stormwater Report. Keep written record of all maintenance activities, inspections and continuous training completed. Develop and implement SWPPPs for all municipal waste handling facilities. The Town already has an existing SWPPP developed for the DPW Facity on Chase Road. This SWPPP 2 years from effective date should be reviewed to ensure that it meets all permit requirements. The Town has a capped landfill on Youngs Cost included under 2.3.7.a.i. Cost included under 2.3.7.a.i. Cost to develop procedures includer ander 2.3.7.a.i.; implementation inspection to tocompleted by the (2) - $2,500 to $5,000 (Budget included for any updates that the permit requirements.) for this facility. Weston & Sampson ===PAGE 25=== Item No. Requirement Deadline Needs Specific to Lunenburg 2.3.7.b.i & iti Perform SWPPP required actions/inspections/training frequencies as per permit Perform quarterly inspections at facilities and conduct annual employee training. 2.3.7.b.t Report on Stormwater Pollution Prevention Plan inspections annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. 2.3.7.b.iv Maintain written records for 2.3.7 continuous Keep written record of all maintenance activities, inspections anc raining completed 102125 SECTION 3-ADDITIONAL: REQUIREMENTS FOR DISCHARGES TO SURFACE DRINKING WATER SUPPLIES AND THEIR TRIBUTARIES 320 Make MS4 discharges to surface drinking water supply sources & their tributaries a priority in the SWMP continuous; report annually Mate ou dos st have any store are discharges to stace. buate treate spit contr or s lechanges to ubic unace ricking water suply sources & their continuous; report annually Estimated Cost to Comply. (4) 3.0.a 3.0.b 3.0.c 4.1.a 4.1.b 4.1.b 4.2 4.3 : 4.4 Evaluate BMP effectiveness & change if needed under provisions of permit Report BMP modifications MS4 must keep records for ≥5yrs; make availabie to public Document results of MS4 outfall screening/sampling & any other monitoring/studies... Submit Annual MS4 Stormwater Report not stated annual MSA stormwaler reports modify BMPs accordingly as needed. Continuous Mando anua as Somade Repo and make available to the public. annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. annualy 0 days from effective. Prepare Annual MS4 Stormwater Report. Planning Level Estimate for Permit Compliance lanning Level Estimate for Permit Compliance (w/ 20% contingency (2) (2) (2) $7,500 - $10,000/yr (It is anticipated that first year annual costs will be higher than subsequent years.) $1,042,500 to $1,632,500 $1,251,000 to $1,959,000 Eat Requirements specific to discharges to impaired waters without an approved TMDL (Appendix H) (1) Cost included as part of completing Notice of Intent and developing written Stormwater Management Plan. (2) Cost included as part of preparing Annual MS4 Stormwater Report. (3) Budget $10,000 to S15,000 to revieve all regulatory mechanisms and make recommendations on how to modity the regulations for compliance. (4) Budget $10,000 to $15,000 the first year to conduct all employee training required under the permit, and budget $5,000 to $7,500 in Years 2 through 5 of the permit. (S) Costs for IDDE investigation and correction of illicit connections were generated for the 10-year timeframe allotted. Weston & Sampson Page 9 of 9 ===PAGE 26=== LUNENBURG, MA A NPDES PHASE 2 STORMWATER - MS4 GENERAL PERMIT REVIEW - YEAR eakdown of Permit Requirements (Based on 2014 Draft Massachusetts MS4 General Perm Item No. 172 Requirement 1.8.1 Complete Notice of Intent (NOT) Endangered Species Determination (complete review; certify in Notice of Intent) SECTION 1 - INTRODUCTION. 90 days from effective date 1.92 Historic Properties Determination (complete review; certify in Notice of Intent) Needs Specific to Lunenburg Prepare and Submit Notice of Intent: Revisit location of permitted stormwater discharges relative to endangered species and ensure no adverse impact (Part of NOI resol ropeles and insure no over sea rate 1.10 Develop Written Stormwater Management Plan (SWMP) 1 year from effective date 1.10.D Update Best Management Practices (BMPs) 1.10.1 Maintain copy of Stormwater Management Plan, make available to public 21:6 For M$4 discharges to a water body with an approved TML Identified in Part 221 comply with Part 22,1 and Appendix F of the Permit 1 year from effective date Contions the now permit empered as at one o process. 1 year from effective date Make SWMP available to the public at Town Hali andfor on Town website. SECTION 2 - NON-NUMERIC EFFLUENT LIMITATIONS 2.1 Water Quality Based Effluent Limitations see Appendix F.of the 2014 Draft MA MS4 General Permit approved TMDEs that are regulated by the permit. 21.1:0 For MS4 discharges to a water body that 1s water, quality limited and not subject to an approved TMOL or.for municipalities located within Par: 2.2 2arb comply with Part 2.22 and Appendix Hofthe Permit a Per: Part 2,2.2, Lunenburg has been identified as a municipality that discharges to water bodies that are impaired due to phosphorus, or thel tributaries, and is therefore subject to the requiremerits of Appendix:H.2For Lake Shirley, the causes of the see Appendix Hof the 2014 Draft impairment are listed as Excess Algal Growth and Dissolved: -MA MS4 General Permit Oxygen, both of which have Total Phosphorus listed as the monitoring parameter. In addition to Total Phosphorus, another cause of the impairment for Lake Shirley is: turbidity, where the: monitoring paramenter Is Total Suspected Solids. Therefore, Lake Shirley is also impaired due to sollds, and subject to the requiremerits of Appendix Hi Part Vi 2.1.1.d For all other discharges (not subject to the requirements of Part 2.1.1.b and Part 2.1.1.c of the Permit) contributing to a violation of applicable receiving water quality standards, eliminate condition causing or contributing to exceedance of water quality standards If a discharge is identified that contributes to an exceedance of within 60 days of becoming aware applicable water quality standards, eliminate the conditions of the situation contributing to or causing the exceedance within 60 days. 2.1.2 Written notification to MADEP & EPA as needed & documentation in the Town's SWMP regarding new or increased stormwater discharges 2.2 221 Identify all outfalls/interconnections that discharge to waters with an approved TMDL or discharge to certain waters identifled as "water quality limited water bodies" For MS4 discharges to a water body with an approved TML, Comply with Appendix E Part A of the Permit as-needed Any new or increased stormwater discharges must satisfy MA antidegradation regulations. 2.2-Discharges to Impaired Waters" SWMP (1 y) & annual MS4 Identify all outfalls or interconnections that discharge to water stormwater reports quality limited water bodies. see Appendix For the 2014 Draft Lanenburg does not have currently any water bodies with. MA MS4 General Permit approved TMDLs that are regulated by the permit Estimated Cost to Comply $15,000 - $25,000 Costs included under 17.2, 1.10,H.I and H.V.M Cost included under IDDE under Item 2.3.4.2.a. (1) (2) Weston & Sampson Page 1 of 7 ===PAGE 27=== Item No. Requirement H..1.al.1e M:Il.1:3.1 H.II:1:a.1.3 HV3 HV411 H.V.4.1.2 H.V.S. 2.32.a-0 23.2e 23.25 2.3.2g 216:3 2.3.3.a 2.3.3.a 2.3.3.b 23.3.C Page 2of7 Distribute clippings/feitilizer message to required audiences Distribute pet waste management message to Residential: Distribute leaf litten disposal message to Residential/Business/Commercial: 236 Ordinance to require BMPs optimized for Phosphorus removal 2:3.7 Grass clippings procedures & blowing prohibited for MS4 property, 2.3.7 Sweep streets/lots ≥2lyr spring & fall Deadline Needs Specific to Lunenburg IMPAIRED - PHOSPHORUS (INCLUDES TRIBUTARIES) Annually in March/April Annually in June/July Develop and disseminate required public education information. Annually August-October: With 236, 2 years from effective Include in Town's Stormwater Management Bylaw a requirement that new development and redevelopment stormwater BMPs be date t optimized. for phosphorus removal With 2.3:7: 1 year from effective: Develop program to manage grass clippings and leaf litter on permittee ownied property. Increase frequency of sweeping of public streets and municipal Sweep at least twice/year parking lots to a minimumiof two times per yearn drainage area tributary to Lake Shirley. i discharge is foundito be to an Impaired Water remove condition or Implement BMPs identifed unde Appendix H.V.41.1. and HIV.4:2. to reduce solids. OIL/GREASE, SOLIDS OR METALS 60:days-from, awareness (ors plan/schedule 23.6. Ordinance to require spilt containment isolation for Commercial/industrial properties With 2:3.6/2 years from ED Increased street sweeping & CB inspection/cleaning in targeted areas Annual Reports Eliminate condition causing or contributing to the impaliment. & document actlons in SWMP Include: in Town's Stormwater. Management Bylaw a requirement that for new development and redevelopment, stormwater management systems designed on commerical and industrial! land use areas draining to the impaired water incorporate spill containment. isolation. Increase street sweeping and catch basin cleaning in high density areas with high pollutant load potential tributary to Lake Shirley. The Town already sweeps street adjacent to water resources twice per year, Street sweeping and catch basin cleaning schedüle to be determined by the permittee Catch basin sumps to be no more than 50% full. submit documentation that discharges do not contain solids pushese one a sinters as or not angel audience reside to the sam agated. audience shall be distributed at least one year apart. Identify method to evaluate effectiveness of message; implement Modify ineffective messages/methods Meet Public Notice requirements Make Stormwater Management Plan & Annual MS4 Stormwater Report available to public Public opportunity to participate in the review/implementation of the Stormwater Management Program Report on public participation opportunities Alternative to Recütrements H:V.1-4 (above) Submit documentation that discharges do not contain solids When Approved by EPA/DEP through long-term monitoring. 2,3 - Requirements to Reduce: Pollutants to the Maximum Extent Practicable (MEP) PUBLIC EDUCATION & OUTREACH Deveiop/distribute a minumum of 8 messages over the permit term. Educational messages can include brochures, begin year 1; continue throughout permit term newsletters, information posted to the Town's website, newspaper articles, public service announcements, displays in municipal buildings, etc. not stated Determine method to evaluate message effectiveness; implement method. before next message distribution Modify message or distribution methods if applicable. annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. A PUBLIC INVOLVEMENT& PARTICIPATION continuous Ensure that all public involvement activities comply with state public notice requirements. continuous ake SWMP and annual MS4 stormwater reports available blic at Town Hall and/or on the Town's websi lay be implemented through the use of Town website, Tow annually otline, clean-up teams, monitoring teams, or a stormwate advisory committee. annually. Report progress in Annual MS4 Stormwater Report. Estimated Cost to Comply 1$2,500 - 53,590 per year over 5 year permit term Cost included under 23,7.a.l2 Cost included under 2.3.7 ailic & d. Street sweeping cost included under 2.3.7 a.ili.c & d. Catch basin cleaning cost included under 2,3.7.a.iii,b: $10,000 - $20,000 for 5-year permit term ($2,000 to $4,000 per year) (Varies depending on whether materials are readily available or need to be developed from scratch.) (2) $2,500 - $5,000 for 5-year permit term ($500 to $1,000 per year) (assumes at least one activity annually over five years and that volunteer organizations will assist) 2) Weston & Sampson ===PAGE 28=== Item No. 2.3.4.2.a 23.42a 23.44a 2.3.44.6 2.3.4.4.C 2.3.4.4.0 2.3.4.5 Requirement ¡Eliminate illicit discharges Report dales of ilicit identification and schedules for removal Mitigate SSOs Complete Inventory of Sanitary Sewer Overflows (SSOs) Report SSOS Update SO inventory Develop outfall & interconnection inventory 2.3.4.5.b 23.4.5.b Report on outfall & interconnection inventory Physically label all MS4 outfalls with unique identifier Deadline ILLICIT DISCHARGE DETECTION & ELIMINATON: Needs Specific to Lunenburg Eliminate illicit discharges as they are identified or establish a 60 days from detection or as expeditiously as possible schedule for elimination for discharges that cannot be removed within 60 days. annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. Eliminate SSO as expeditiously as possible and take interim Expeditiously as possible mitigation measures to minimize the discharge of pollutants to and from the Town until elimination is completed. Identify all known locations where SOs have discharged within 120 days from effective date 24 hours of awareness Provide verbal notice to EPA within 24 hours, and written notice to EPA and MADEP within 5 days. annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. This requirement includes identifying each outfall and interconnection, recording its location and condition, and providing a framework for tracking inspections, screenings and other activities. The inventory needs to include the information 1 year from effective date identified under item 2.3.4.5.c. The Town has approximately 450 outfalls and interconnections. Most of the Town's outfalls have been located in the field. Condition information has also en recorded for most of these outfalls as part of dry weath reening previously completed by the Tow annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. All MS4 outfall pipes must be labeled in the field with a unique identifier. The Town has approximately 400 outfalls. It appears end of permit term at a unique identifier has been added to ail outtalls in GIs, an his same identifer must be used to physically label all outfalls the field. The Town has mapped their outfalls and receiving waters, but only limited mapping has been completed for the rest of the storm drain system. Anticipated mapping additions include: ipes; open channel conveyances; catch basins; drai manholes; interconnections with other MS4s; municipally owne stormwater treatment structures; 450 catchment delineations; 2.346 2.3.4.6.0 2.3.47 23.47.a Map the MS4 features required & recommended in 2.3.4.6.ail, Il & iT Report on mapping progress (Witten IDE program (include responsibility statement, writen procedure for outfallinterconnection sampling, written procedure for IDDE investigation) Adopt regulatory mechanism providing legal authority to prohibitinvestigate/eliminate illicit discharges 2 years from effective date annual MS4 stormwater reports 1 year from effective date rould have been complete der 2003 perm he Town amended their existing Zoning Bylaws at the December 5, 2007 Town Meeting to incorporate a new bylav ation (Section 6.8) governing discharges to the munic m drain syste Page 3 of 7 Estimated Cost to Comply Budget $10,000 to $20,000 per year over 10 years as an allowance for removal of illicit connections. (2). Town Forces Town Forces (2) Assume inventory for the remaining outfalls and any information required as part of the inventory, but not collected to date for other outfalls, would be completed in conjunction with dry weather screening. (2) $20,000 to $40,000 ($4,000 to $8,000 per year) (Assume $50 to $100 per sign per outfali to purchase and install.) $130,000 to $160,000 (2) $2,500 - $5,000 Weston & Sampson. ===PAGE 29=== Item No. 2.3.4.7.0 23.47. cli 2.3.4.8.a 23.48.6 2.3.49 2.3.4.10 234.10 2.3.5 23.5.ci Page 4 of7 Requirement Compete initial illicit discharge potential assessment and priority ranking based on existing information Report on list of catchments and results of rankings Deadline Needs Specific to Lunenburg Assess and rank all outfall drainage areas ("catchments") for the potential to have illit discharges and/or SOs. Develop matrix to rank each outfall catchment area. Priority rank catchments 1 year from effective date based on where certain risk factors may be present as provided in the permit The Town has approximately 400 outfalls, which equates to 400 catchments for ranking. Assume an aciditional 50 interconnection for a total of 450 catchments for ranking annual MS4 sformwater reports. Rentory compete ry washes renter e amping or every MS4 outfall and interconnection. Dry weather sampling arameters shall include, at a minimum, ammonia, chlorine . coll, surfactants and temperature. Phosphorus and TSS wil Estimated Cost to Comply. $10,000 - $15,000 (2) $50,000 to $75,000 Dry-weather outfal/interconnection screening & sampling (except Excluded & Problem Catchments) 3 years from effective date flow in need of sampling (70 outfalls/interconnections). Outfalls/interconnections with evidence of contamination, but without active dry weather flow would need to be revisited. Assume that approx. 5% of all outfalls + interconnections (25 utfalls/interconnections) would need to be revisited and that 20% (5 outfalls/interconnections) would have dry weather flow. The Town completed dry weather screening of 401 outfalis under the 2003 Permit, and 32 outfalls had dry weather flow, but no. dr weather samoles were collected. Evaluate & report IDDE program progress Define indicators of IDDE program success Conduct IDDE employee training annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. Continue to train employees about the IDDE Program including at least annually now to recognize ilicit discharges and SSOs. a CONSTRUCTION. SITE STORMWATER RUNOFF CONTROL ORMWATER RUNOFF: CONTR Resort progres in Anna M54 Somaler Report. Continue to implement and enforce a program to reduce Implement & enforce Construction Site Stormwater Runoff Control (CSSRC) Program not stated pollutants in stormwater runoff from construction activities per the 2003 Permit. 1e Town's Zoning Bylaws were amended at the December 07 Town Meeting to include Section 6.7, which regulat stormwater management for any construction activity that results (2) (2) (4) (2) Adopt regulatory mechanism requiring use of sediment/erosion control at construction sites Should have been completed under 2003 permit. - prepare and submit an Erosion Control Plan covering all phases of construction. Weston & Sampson ===PAGE 30=== Item No. 2.3.5.c.ii 2.3.5.c.ili 2.3.5.c.v 23.5.C.V 2.3.6.a 2.3.6 Requirement... Develop written procedures for site inspections and enforcement of sediment and erosion control measures. The procedures shall clearly define who is responsible for site inspections as well as who has authority to implement enforcement procedures. The program shali provide that the permittee may, to the extent authorized by law, impose sanctions to ensure compliance with the local program. Require developers to implement a sediment and erosion control program that includes BMPs appropriate for the conditions at the construction site. Include requirements for waste control, including but not limited to, discarded building materials, concrete truck wash out, chemicals, litter, and sanitary wastes, in the CSSRC ordinance. Deadline 1 year from effective date not stated not stated Develop written site plan review procedures. Site plan review shall include a review by the permittee of the site design, the planned operations at the construction site, planned BMPs during the construction phase, and the planned BMPs to be used to manage runoff created after development. The review procedure shall incorporate procedures for the consideration of potential water quality impacts; procedures for pre-construction review; and 1 year from effective date procedures for receipt and consideration of information submitted by the public. Site plan review procedure shall include evaluation of opportunities for use of low impact design and green infrastructure. When the opportunity exists, the permittee shall encourage project proponents to incorporate these practices into the site design. The permittee shall track the number of site reviews, inspections, and enforcement actions. POST: CONSTRUCTION STORMWATER MANAGEMENT Implement & enforce SW management for New Development/Redevelopment not stated Should have been completed under 2003 permit. Needs Specific to Lunenburg meet permit requirements. Ensure that current requirements meet all the conditions of the permit, and revise as needed. Include current requirements in Town's CSSRC Program if not already included. Ensure that the Town's site plan review procedures are in written form and that they meet current permit requirements. Estimated Cost to Comply (3) (3) (3) (3) Continue to implement and enforce a program to address post- construction stormwater runoff from.new development and redevelopment projects per the 2003 Permit. he Town's Zoning Bylaws were amended at the December 007 Town Meeting to include Section 6.7, which regulate projects that dists one t) ate or harmont and redevelopment. 2.3.6.a.ii Adopt regulatory mechanism that regulates runoff from new development/redevelopment Amend existing regulatory mechanism to contain provisions at least as stringent as those outlined under Part 2.3.6.a.il which include: (a) designing stormwater management systems to retain the first inch of runoff from al impervious surfaces or provide pollutant removal equal to or greater than the level of pollutent removal provided through the use of bioinfiltration on the first inch of runoff from all impervious surfaces; (b) requiring the use of treatment BMPs instead of infiltration BMPs on sites with documented soil contamination and on industrial sites; (c) Incorporating designs that allow for the shutdown and containment of BMPs designed to include infiltration near environmentally sensitive areas; (d) require BMPs to be constructed in accordance with The Massachusetts Stormwater Handbook Volume 2 Chapter 2; (e) require the development of a long-lerm operation and maintenance plan to inspect and repair installed BMPs; and (f) avoid disturbance of areas susceptible to erosion and sediment loss. 2 years from effective date 2.3.6.a.iit Develop procedures for Post Construction Stormwater Management to ensure submission of as-built plans within a year from completed construction, and long-term O&M of BMPs; include in written SWMP. [Report on measures to comply with 2.3.6.a.ill in annual MS4 starmwater report 1 year from effective date annual MS4 stormwater reports The Town will need to amend their existing regulations to incorporate the provisions listed. Of those items listed, the Town does currently require the development of an O&M Plan for all new development/redevelopment projects where more than one acre is disturbed. Further enhancement may be needed to the existing O&M plan requirements to meet the conditions of the permit. e Town's existing Stormwater Management Bylaw curren quires the submission of O&M Plans for the long-ter peration and maintenance of BMPs. The Town may need tr urther amend their O&M Plan requirements to meet the conditions of the permit. The Town must also have procedures in from completed constructision of as buit plans within a year Report progress in Annual MS4 Stormwater Report. (3) 23.01 Page 5 of 7 (3) (2) Weston & Sampson ===PAGE 31=== Item No. 2.3.6.d.i & li 2.3.7.a. & ii 2.3.7.a.il 2.3.7.a.ii.b 2.3.7.a.iila Requirement Deadline Needs Specific to Lunenburg Develop method to track changes in impervious area as development/redevelopment occurs. Starting impervious area Estimate baseline impervious area and annual increase/decrease in acres of impervious area annual MS4 stormwater reports estimates available from EPA. Estimates to be included in Annual MS4 Stormwater Report each year. /GOOD HOUSEKEEPING & POLLUTION PREVENTION FOR PERMITEE OWNED OPERATIONS Develop written operation & maintenance procedures for parks Develop written operation & maintenance procedures for municipal activities. 1 year from effective date and open space, buildings and facilities where poilutants are exposed to stormwater runoff, as well as vehicles and equipment. Complete inventory of listed municipal facilities Provide training on use, storage, & disposal of petroleum products to applicable staff 1 year from effective date review/update annually not stated Develop inventory of all municipal facilties; Review inventory annually and update as necessary. Provide training on use, storage, & disposal of petroleum products to applicable municipal staff. Develop written plan/schedule for activities such as street Written program detailing activities/procedures the MS4 will implement to ensure infrastructure is maintained in timely manner 1 year from effective date sweeping, catch basin cleaning, maintenance of structura drainage system if frast caine, and assessmentruparade of Estimated Cost to Comply (2) $7,500 - $10,000 Town Forces (4) Cost included under 2.3.7.a.i. 2.37.aliib Develop & implement a plan to optimize catch basin cleaning & include in written SWMP 1 year from effective date $5,000 to $7,500 conditions are met. 2.3.7.alilb Implement routine inspection/cleaning/maintenance of catch basins to ensure sumps <50% full; report on activities as specified; investigate excessive sediment; log/report CB cleaning continuous; annual MS4 stormwater reports 900 catch basins town-wide and currently cleans all catch basins at least once every two years. Catch basins adjacent to water resources are cleaned twice per year in the spring and the fall. Assume that the Town's currently cleaning schedule will meet the permit requirements. The Town cleans their catch basins using Town staff and equipment, It is assumed that no additional expenditures for catch basin cleaning i will be needed above what the Town currently spends. 2.3.7.ail.c & d. Sweep streets/parking lots 1xiyear in spring; report on efforts The Town currently sweeps all public streets and municipal parking lots annually. Roadways adjacent to water resources are swept twice per year. The Town will need to continue to annually; annual MS4 stormwater sweep streets in the drainage area tribulary to Lake Shirley at least twice per year in the spring and the fall to meet the permit conditions oullined under Appendix H. Part Il.1.a.i.3. All The Town currentiy completes stree sweeping using Town staff anc equipment. It is assumed that no additional expenditures for street sweeping will be needed above what the Town currently spends. 2.3.7.a.ii.d Ensure proper storage of CB cleanings & street sweeping to prevent runoff NA 2.3.7.a.li.e Establish procedures for winter road maintenance not stated Examine storage of CB cleanings & street sweepings Look at storage and usage of salt and sand; evaluate opportunities for use of alternative deicers. Cost included under 2.3.7.a.i. 2.3.7.aliif Cost included under 2.3.7.a.i. Cost to develop procedures includer under 2.3.7.a.i.; implementation & inspection to To completed by the 2.3.7.av Establish/implement procedures to inspect/maintain storm drains & structural BMPs; and for annual inspection of treatment structures Report on all Good Housekeeping/Pollution Prevention requirements Keep written record of all Good Housekeeping/Pollution Prevention activities not stated! minimum. annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report continuous Keep written record of all maintenance activities, inspections and training completed. Weston & Sampson Page 6 of 7 ===PAGE 32=== Item No. 2.3.7.b.ii & ii 23.7.b. 41.a 4.1.b 4.1.5 4.2 43 4.4 Requirement Deadline Needs Specific to. Lunenburg Perform SWPPP required actions/inspections/training frequencies as per permit Perform quarterly inspections at facilities and conduct annual employee training. Report on Stormwater Pollution Prevention Plan inspections annual MA stormwater reports.| Report progres in Annual MS4 Stormwater Report. Maintain written records for 2.3.7 continuous Keep written record of all maintenance activities, inspections and training completed. So evaluate complace win no pant elde documentin evaluator Witen M RAM EVALUATION, RECORD IN 2 REPay avala. Annually evaluate Town's compliance with permit conditions. Evaluate BMP effectiveness in achieving permit objectives & Evaluate BMP effectiveness & change if needed under provisions of permit not stated modify BMPs accordingly as needed. Report BMP modifications annual MS4 stormwater reports Include in Annual MS4 Stormwater Report. MS4 must keep records for ≥byrs; make available to public Continuous Maintain annual MS4 stormwater reports and make available to the public. Document results of MS4 ouiali screening/sampling & any other monitoring/studies annual Mi4 stormwater reports Report progres in Annual MS4 Stormwater Report. Submit Annual MS4 Stormwater Report annually 90 days from effective date Prepare Annual MS4 Stormwater Report. Planning Level Estimate for Permit Compliance: Planning Level Estimate for Permit Compliance (w/ 20% contingency):| Estimated Cost to Comply (4) 12) 12). (2) 122 7,500 - $10,000/yr (It is anticipate nat first year annual costs will b higher than subsequent years.) 5266,500 to $349,000 3319,800 to $41B,800 * Requirements specific to discharges to impaired waters without an approved MDL (Appendix H) ) Cost included as part of completing Nofice of Intent and developing written Stormwater Management Plar ) Cost included as part of preparing Annual MS4 Stormwater Report (3) Budget $10,000 to $15,000 to review all regulatory mechanisms and make recommendations on howto modify the regulations for compliance. (4) Budget $10,000 to $15,000 the first year to conduct all employee training required under the permit, and budget $5,000 to $7,500 in Years 2 through 5 of the permit. (5) Costs for IDDE investigation and correction ef illicit connections were generated for the 10-year timeframe allotted. Weston & Sampson Page 7 of 7 ===PAGE 33=== LUNENBURG, MA EPA NPDES PHASE 2 STORMWATER - MS4 GENERAL PERMIT REVIEW - YEAR 2 Breakdown of Permit Requirements (Based on 2014 Draft Massachusetts MS4 General Permit) Item No. Requirement 152.1.1.6 2:1.1:c: 2.1.1.d 2.1.2 2.2 :2.2.1 H.I:1.a12 H.V.3M :H.V.4.i.2: Page 1 of 4 For M54 discharges to a water body with an approved MDL Identied in Part 221, comply with Pat 22.11 and Appendix F of the Permit Deadline SECTION 2 - NON-NUMERIC. EFFLUENT LIMITATIONS 2.1% Water Quality Based Effluent Limitations see Appendix F of the 2014 Draft MA MS4 General Permit Needs Specific to Lunenburg Lünenburg does not currently have any water bodies with approved TMDLs that are regulated by the permit. or MS4 discharges to a water bocy that is water quality limited and not subject to an approved TMDL or for municipalities located within Pait 2.2 2a D, comply with Part 2,22 and Appendix H of the Permit Per Part 2:2:2, Lunenburg has been identified as a municipality that discharges to water bodies that are impaired due to phosphorus, or their tributaries and is therefore subject to the requirements of Appendix H. For Lake Shirley, the causes of the see Appendix H of the 2014 Draft: impalment are listed as Excess Algal Growth and Dissolved? Oxygen, both of which have Total Phosphorus listed as the MA MS4 General Permit: monitoring parameter. In addition-to Total Phosphorus, another cause of the impairment for Lake Shirley is turbidity, where, the monitoring paramenter is Total Suspected Solids. Therefore: Lake Shirley is also impeired due to solids, and subject to the recurements of Appendix H. Part Va For all other discharges (not subject to the requirements of Part 2.1.1.b and Part 2.1.1.c of the Permit) contributing to a violation of applicable receiving water quality standards, eliminate condition causing or contributing to exceedance of water quality standards If a discharge is identified that contributes to an exceedance of within 60 days of becoming aware applicable water quality standards, eliminate the conditions of the situation contributing to or causing the exceedance within 60 days. Written notification to MADEP & EPA as needed & documentation in the Town's SWMP regarding new or increased stormwater discharges Identify all outfalls/interconnections that discharge to waters with an approved TMDL or discharge to certain waters identified as "water quality limited water bodies" For MS4 discharges to a water body with an approved TMbL comply with Appendx F, Part A of the Permit: Distribute clippingsffertilizer message to required audiences: Distribute pet waste management message to Residential Distribute leaf:litter disposal message to Residential/Business/Commercial 23.6.16 to indude consideration of BMPs that Inflate stormwater as-needed 2.2 - Discharges to Impaired Waters SWMP (1 yr) & annual MS4 stormwater reports see Appendix F of the 2014 Draft MA MS4 General Permit S IMPAIRED: PHOSPHORUS (INCLUDES TRIBUTARIES) Annually in March/April: Annuaily in Juine/July. -Annually August-October With 2.3.6.1.b,4 years trom effective. date: Any new or increased stormwater discharges must satisfy MA antidegradation regulations. Identify all outfalls or interconnections that discharge to water quality limited water bodies. Linenburg does not currently have any water bodies with approved TMDLs that are regulated by the permit Develop and disseminate requred public education information. 2.37 Sweep streets/hots 22lyr spring & fall Sweep at least twice/year. Inventory and prionty ranking: of. own property and intrastructure that could be retrofitted with BMPs to Include consideration of BMPs that infitrate stormwater: crease frequency of sweeping of public streets and municipal parking lots to a minimum of two times per year in drainage, area tributary to! Lake Shirley s discharge is found to betto an Impaired water: remove condition or implement BMPS identified under Apperdix H.V:4.l.1 and H.V.4.i.2: to reduce solids. IMPAIRED OIL/GREASE, SOLIDS OR METALS: 60 days from awareness (or: pian/schedule) Increased street sweeping & CB inspection/cleaning in targeted areas -Annual Reports Eliminate condition causing or contributing to the impairment & document actions in SWMPE increase street sweeping and catch basin cleaning in high, density areas with high pollutant load potential tributary to Lake Shirley: The Town already sweeps street adjacent to water resources twice per year. Street sweeping and catch basin cleaning schedule to be determined by the permittee Catch basin sumps to be no more than 50% full Estimated Cost to Comply Costs included ünder 1.7.2; 1:10; H.I: and H.V. Cost included under IDDE under Item 2.3.4.2.a. (1) (2) $2:500. $3 500 per year over 5 year permit term! *Cost included ünder 2.3.6.d.3. iCost included, under: 2.3.7.a.illic& d. Street sweeping cost included under 2:3.7.a.lii.c & d. Catch basin cleaning cost included under 2.3.7.a liby Weston & Sampson ===PAGE 34=== Item No. 2.3.2.a-d 2.3.2.0 23.2.0 2.3.2.g 2.3.3.a 2.3.3.a 2.3.3.b 2.3.3.c 2.3.42.a 23.4.2a 2.3.4.4.a 2.3.4.4.b 2.3.4.4.0 23.44.d 23.4.56 2.3.4.6.0 Page 2 of 4 Requirement Deadline Needs Specific to Lunenburg / 23- Requirements to Reduce Pollutants to the Maximum Extent Practicable (MEP) ..... PUBLIC EDUCATION & OUTREACH Develop/distribute a minumum of 8 messages over the permit Distribute at least 2 educational messages to each of 4 targeted audiences (residents, term. Educational messages can include brochures, begin year 1; continue throughout businesses/commercial/institutional, developers and industrial). Different messages to the same targeted newsletters, information posted to the Town's website, permit term audience shall be distributed at least one year apart. newspaper articles, public service announcements, displays in unicipal buildings, eto Identify method to evaluate effectiveness of message; implement Modify ineffective messages/methods Report on messages as per permit not stated etermine method to evaluate message effectiveness implement method. before next message distribution Modify message or distribution methods if applicable. anual M54 stormwater repor Report progress in Annual MS4 Stormwater Report. PUBLIC. INVOLVEMENT & PARTICIPATION Meet Public Notice requirements continuous Make Stormwater Management Plan & Annual MS4 Stormwater Report available to public continuous Public opportunity to participate in the review/implementation of the Stormwater Management Program annually Ensure that all public involvement activities comply with state public notice requirements. Make SWMP and annual MS4 stormwater reports available to public at Town Hall and/or on the Town's website. ays are learns miting or to or ate, Tom advisory committee. Report on public participation opportunities annually no SO AS BRILLICIT DISCHARGE DETECTION & ELÍMINATON I Report progress in Annual MS4 Stormwater Report. Eliminate illicit discharges Report dates of illicit identification and schedules for removal Mitigate SSOs Complete Inventory of Sanitary Sewer Overflows (SSOs) Report SSOS Update SSO inventory Eliminate ilicit discharges as they are identified or establish a days from detection or a ‹peditiously as possib schedule for elimination for discharges that cannot be removed within 60 days. annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. Eliminate SSO as expeditiously as possible and take interim Expeditiously as possible nitigation measures to minimize the discharge of pollutants t and from the Town until elimination is completed. 120 days from effective cate Identify all known focations where 55Os have discharged within Provide verbal notice to EPA within 24 hours, and witten notice 24 hours of awareness Ito EPA and MADEP within 5 days. annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. Physically label all MS4 outfalls with unique identifier end of permit term Report on mapping progress annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Repoit. Estimated Cost to Comply $10,000 - $20,000 for 5-year permit term ($2,000 to $4,000 per year) (Varies depending on whether natenals are readily available or neer o be developed from scratch. $2,500 - $5,000 for 5-year permit term ($500 to $1,000 per year) (assumes at least one activity annually over five years and that volunteer organizations will assist) Budget $10,000 to $20,000 per year over 10 years as an allowance for removal of illicit connections. (2) Town Forces Town Forces 12) Weston & Sampson ===PAGE 35=== Item No. 2.3.4.8.b 23.48.c 2.3.4.8.Ci 2.3.48.c.i 2.3.4.8.c.i 23.4.8.C.iii 2.3.4.8.c.ill 2.3.4.8.e 2.3.4.9 2.3.4,10 2.3.4.10 2.3.6.d. & i 23.7.ali.b Requirement Implement IDDE catchment investigation procedure as per 2.3.4.7.e (System Vulnerability, MH inspection, wet- weather sampling, segment isolation, etc.) Complete IDDE in all catchments, regardless of sampling results Complete IDDE investigation in 80% of Problem Catchments Complete IDDE investigation in 100% of Problem Catchments Complete IDDE investigation in all catchments where outfall/interconnection screening information indicates sewer input based upon olfactory/visual evidence or sampling results Complete IDDE investigation in 40% of catchments Complete IDDE investigation in 100% of catchments Evaluate & report IDDE program progress Define indicators of IDDE program success Deadline 3 months from written procedure; not more than 15 months from effective date Not specified (see 2.3.4.8.c.iii) 3 years from effective date 5 years from effective date 5 years from effective date 5 years from effective date 10 years from effective date annual MS4 stormwater reports annual MS4 stormwater reports Needs Specific to Lunenburg Estimated Cost to Comply ssume that 30% of all outfalls/interconnections have at leas one System Vulnerability Factor in its catchment, which triggers the requirement for wet-weather sampling. For this reason, the Budget Estimate assumes that 30% of the 450 outfalis/interconnections will require wet-weather sampling (135 outfalls/interconnections). For budgeting purposes, it is assumed that an lilicit Discharge Detection and Elimination Investigation Program will need to be implemented in 85% of catchments. Catchments with no potential for illicit discharges (based on the catchment ranking exercise completed under Task 2.3.4.7.c.) can be excluded from the IDDE Program. Assume $40,000 to $50,000 in Year 2 for wet weather sampling. Budget $40,000 to $50,000 allowance per year in Years 2 to 10 for IDDE investigation and sampling. Budget $10,000 to. $20,000 allowance per year in Years 2 to 10 for CCTV inspection and dye testing to investigate illicit connections. Budget allowance for removal of illicit connections included under 2.3.4.2.a. Conduct IDDE employee training Report on IDDE employee training at least annually annual MS4 stormwater reports POST-CONSTRUCTION STORMWATER MANAGEMENT Report progress in Annual MS4 Stormwater Report. Report progress in Annual MS4 Stormwater Report. Continue to train employees about the IDDE Program including now to recognize illicit discharges and SSOs Report progress in Annual MS4 Stormwater Report. (2) (2) (4) 12) Develop method to track changes in impervious area as Estimate baseline impervious area and annual increase/decrease in acres of impervious area annual MS4 stormwater reports development/redevelopment occurs. Starting impervious area estimates available from EPA. Estimates to be included in (2) Annual MS4 Stormwater Report each year. A GOOD HOUSEKEEPING & POLLUTION PREVENTION FOR PERMITER-OWNED OPERATIONS. Provide training on use, storage, & disposal of petroleum products to applicable staff not stated Provide training on use, storage, & disposal of petroleun (4) products to applicable municipal staft Clean catch basins as needed to ensure that no sump is more than 50% full at any given time. The Town has between 700 and The Town cleans their catch basins using Town staff and equipment. It is Implement routine inspection/cleaning/maintenance of catch basins to ensure sumps <50% full; report on activities as specified; investigate excessive sediment; log/report CB cleaning continuous; annual MS- stormwater reports 900 catch basins town-wide and currently cleans all catch basins assumed that no additional at least once every two years. Catch basins adjacent to water expenditures for catch basin cleaning resources are cleaned twice per year in the spring and the fall. will be needed above what the Town Assume that the Town's currently cleaning schedule will meet the permit requirements. currently spends. The Town currenty sweeps all public streets and municip arking lots annually. Roadways adjacent to water resource 23.7.aiii.c & d. Sweep streets/parking lots 1x/year in spring; report on efforts annually; annual MS4 stormwater reports The Town currently completes street sweeping using Town staff and equipment. It is assumed that no east twice per year in the spring and the fall to meet the perm conditions outlined under Appendix H. Part Il. 1.a.j.3. Al nunicipal parking lots within the Lake Shirley drainage area wi Iso need to be swept twice per year in the spring and the fa 23.7.a.v 237.a.v Establish/implement procedures to inspect/maintain storm drains & structural BMPs; and for annual inspection of treatment structures Report on all Good Housekeeping/Pollution Prevention requirements: Keep written record of all Good Housekeeping/Pollution Prevention activities not stated minimum. annual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. continuous Keep written record of all mainterance activities, inspections and training completed. Cost to develop procedures includec under 2.3.7.a.i.; implementation 8 inspection to be completed by the Weston & Sampson Page 3 of 4 ===PAGE 36=== Item No. 23.7.b 2.3.7.b.il & iii 2.3.7.b. 23.7.biv 4.1.a 4.1.b 4.1.5 4.2 43 4.4 Requirement Deadline eeds Specific to Lunenbu evelop and implement sWPps Tor all municipal was handling facilities. The Town already has an existing SWPPP developed for the DPW Facity on Chase Road. This SWPPP Develop/implement written Stormwater Pollution Prevention Plans for required facilties as per permit 2 years from effective date should be reviewed to ensure that it meets all permit requirements. The Town has a capped landfill on Youngs venue where yard waste is collected 12 weekends per yea nd composted. It is not anticipated that a SWPPP will b peedied for this facilit Perform SWPPP required actions/inspections/training frequencies as per permit Perform quarterly inspections at facilities and conduct annual employee training. Report on Stormwater Polution Prevention Plan inspections arual MS4 stormwater reports Report progress in Annual MS4 Stormwater Report. Maintain written records for 2.3.7 continuous Keep written record of all maintenance activities, inspections and training completed. sara compano won me pem holid amontin A SECTION PROGRAM VALUATION, RECROKE IN REal value roams compane wiper anon. Evaluate BMP effectiveness & change if needed under provisions of permit not stated Evaluate BMP effectiveness in achieving pernit objectives & modify BMPs accordingly as needed. Report BMP modifications annual MS4 stormwater reports include in Annual MS4 Stormwater Report. MS4 must keep records for a5yrs; make available to public Continuous Maintain annual MS4 stormwater reports and make available to the public. Document results of MS4 outfall screening/sampling & any other monitoring/studies annual MSA stormwater reports Report progress in Annual MS4 Stormwater Report. Submit Annual MS4 Stormwater Report annually 90 days from effective date Prepare Annual MS4 Stormwater Report. Planning Level Estimate or Permite spinace v/ emmi Compen: E Estimated Cost to Comply sude indude to any updates tha nay be needed to the Town's existin SWPPP for the DPW Facility to meet the permit requirements.) (4) (2) (2) (2) (2) (2) higher than subsequent years.) $124,000 to $179,000 5148,800 to $214,800 as Requirements specific to discharges to impaired waters without an approved TMDL (Appendix H) (1) Cost included as part of completing Notice of Intent and developing written Stormwater Management Plan. (2) Cost included as part of preparing Annual MS4 Stormwater Report. (3) Budget $10,000 to $15,000 to review all regulatory mechanisms and make recommendations on howto modify the regulations for complance. (4) Budget $10,000 to $15,000 the irst year to conduct all employee training tequired under the permit, and budget $5,000 to $7,500 in Years 2 through 5 of the permit. (5) Costs for IDDE investigatien and correction of illicit connections were generated for the 10-ycar timeframe allotted. Page 4 of 4 Weston & Sampson ===PAGE 37=== 2/25/2016 Pavement Management Plan • Newly revised plan - electronic database ca Backlog of work remains at 9 million+ ca Existing funding sources • Revised financial model o8 Accelerated (Performance) Patching Plan FY16 $250,000 • FY17 $250,000 The Challenge 03- Potential Additional Road Paving Storm Water Requirements Timing & Sequence = $ ===PAGE 38=== Pot Hole Log Date Location 11/18/2015 West st,Eletric to Pratt ,Pleasant st, White woods , Chase rd, w.Townsend rd, Gilchrist st, Kirby st, youngs rd, White st 11/20/2015 389 Page st 11/30/2015 hollis rd 11/30/2015 259-287 -365 Hollis rd 12/3/2015 Round road 12/15/2015 Robbs hill rd 12/28/2015 interc of south rd and sandy cove rd along cove rd 12/30/2015 Pine st 7 2a 1/4/2016 Graham @ summer,Resevior rd, Houghton Mills, Page st 1/4/2016 Island rd, Willams, pennisula dr, Sandy Cove rd, cove rd, Resident Name Lunenburg D.P.W Patricia Blanchard Mary Ann Wiesman Mary Ann Weisman Joe Norton Naci Bell Taina Fernadez Scott mc Parland Lunenburg D.P.W Lunenburg D.P.W Monday, February 22, 2016 Resident Contact Pothole Issue and Response V 30 @ west st, 11 @ Electric and Pratt, 5@ Pleasant st ,3 @ White Woods, 16 @ Chase rd, 4 2 Gilchrist st 12 W.Townsend rd, 1@ Kirby St,1@youngs rd, 1@ White st TOTAL OF 56 POT HOLES FILLED (978) 785-6033 V Keatings did overlay in spring, Road complete no pot 978-582-4075 tmke@ Lunenburgonline.com 978 - 582-0755 978-582-5512 61 Cove rd 857-919-6174 holes Pot holes @ 259,287,365 repaired 12/1/15 Pot holes, caller says someone fell in pot hole, we repaired 12/1/15 REPAIRED 5 POT HOLES Pot holes Completed Whole rd Ruth & Parmeteir rd, Complete 12/17/15 HOT MIX Did to big overlays on robbs Hill rd to patch pot holes , Complete 12/15/15 HOT MIX repaired pot holes, 1/4/15 HOT MIX pot hole on pins st, repaired 1/4/15 HOT MIX Graham@ Summer 2, Reseviour 1@ 301 2@ 181 2@ 92 1 @ 62, Houghton Mills, 2, 1@ 104 page st TOTAL OF •11. POT HOLES FILLED Island rd 1@5, 1@39, 22 58, Willams dr, 1@ 25, pennisula dr 1@ 72, 2@85,2@121 Sandy cove rd 1@ 60 4@113, cove rd 4 TOTAL OF 13 POT HOLES FILLED Page 1 of 3 ===PAGE 39=== Date 1/4/2016 1/6/2016 Location Pine st, Canterberry, Hemlock , South Row Island rd, Sandy Coverd Resident Name Lunenburg D.P.W WIDE TOWN L.D.P.W Resident Contact L.D.P.W 1/12/2016 1/15/2016 1/21/2016 1/25/2016 2/2/2016 2/9/2016 WIDE WIDE Monday, February 22, 2016 TOWN WIDE TOWN WIDE TOWN WIDE TOWN TOWN TOWN WIDE L.D.P.W L.D.P.W L.D.P.W L.D.P.W L. D.P.W L.D.P.W L.D.P.W L.D.P.W LID.P.W Pothole Issue and Response 4@ 62 & 32 Pine st, 1@ 142 Canterberry rd, 1@105 Hemlock rd 2@44 South row rd,3 @ 601 @ 65, 1@12 sandy Cove,2@ 772@85, 1 @1-101,1@ 106, 1@112 ,22 126, 2@ 140 1@ 166 6@ 145 TOTAL OF 29 POT HOLES FILLED V CENTRE PIZZA 2 ,ELECTRIC AV1, MASS AV CENTER OF TOWN 1, CHASE RD 11, WHITE ST 2, MAPLE PKW9, PRATT ST3, HOLMANST/NORTH CEMETERY2,270AK AV 1, 27 CLIFFVEIW 2, 133/145 SOUTH ROW2 199/211 SOUTH ROW 4 239 SOUTH ROW 3 COVE RD 3, 24 WEST. ST1, 89 WEST ST 6, 202 WEST ST 1,92 AUTUM DR 1, 62 AUTUM DR 1, 289 RESEVOIR RD 7,230 SOUTH ROW1, PAGE ST 1,393 ARBOR ST TOTAL OF 64 POT HOLES FILLED HOLLIS RD 7, NATICK ST 10, 2A 1, BURCH ISLAND2, HOLLIS RD 3, POND ST 2, PROSPECT 3, LEO/SHIRLEY RD 3, TOTAL OF 31 POT HOLES FILLED RESEVIOR 15, LOONGWOOD 2, LEOMINSTER RD 4, PAGE ST 5, SUMMER ST 16, WHALOM RD 2, TOTAL OF 44 POT HOLES FILLED CHASE RD 2, SUMMER ST 18, BEACHVIEW 1, SANDY COVE RD 3, COVE TER 5, ARBOR ST 4 BURRAGE ST 9, TOTAL OF 42 POT HOLES FILLED • SOUTH ROW 2, COVE RD 2, SANDY COVE RD 4, PENNINSULA DR 1, SUMMER ST 2, RT 13 ELECTRIC AV 19 TOTAL OF 30 POT HOLES FILLED SUNNY HILL RD 3, TOWNSEND HARBOR RD 1, 885 FLATHILL RD 2, 34 ROUND RD 2, TOTAL OF & POT HOLES FILLED 18 PROSPECT 1, PROSPECT ROTARY 1, 4 PROSPECT 1 TOTAL OF 3 POT HOLES FILLED Page 2 of 3 ===PAGE 40=== Date 2/18/2016 Location TOWN WIDE Resident Name L.D.P.W Resident Contact L.D.P.W Pothole Issue and Response CROSS ST1 , SOUTH ROW 7, 156 SOUTH ROW 3, 112 ISLAND RD 1, 25 WILLAMS 2, PENNINSULA DR 2, LEOMINSTER RD 2 26 LAKESIDE AV 6, 63 GRAHAM ST 1 , 191 SUMMER ST 3, 15 ELM ST 1, CHSAE RD 5 , NORTHEND SUBSRU 5, 228 WHITE ST 2, PLESANT ST 2 , 178 HOLLIS RD 1 TOTAL OF 44 POT HOLES FILLED Monday, February 22, 2016 Page 3 of 3 ===PAGE 41=== TOWN OF LUNENBURG Adam R. Burney Land Use Director Tel: (978) 582-4147 Fax: (978) 582-4353 960 Massachusetts Avenue Lumenburg, MA 01462 INCORPORA Date To: February 25, 2016 Kerry Speidel, Town Manager Town of Tamenlug From: Adam R. Burney, Land Use Director RE: Conservation Commission Budget Amendments It was brought to my attention that the Conscrvation Commission would like to amend their budget request to include the following items: Fund Line Description Amount 11712 521003 ridge Repair & Mt $600.00 11712 531009 ducational Material $1,000.00 11712 581014* Kiosk* $600.00 Please note that Line 531014 Kiosks is not currently in the budget but the request didn't fit in any existing Line. If you have any questions of require further information please do not hesitate to contact me. ======================================================================================== DOCUMENT : 2016-03-03-agenda-2232.txt BOARD : finance-committee DATE : 2016-03-03 KIND : agenda OUR COPY : https://lunenburgbudgetproject.org/docs/minutes/text/finance-committee/2016-03-03-agenda-2232.txt TOWN PDF : https://www.lunenburgma.gov/AgendaCenter/ViewFile/Agenda/_03032016-2232 ======================================================================================== ===PAGE 1=== NOTI CE of FINANCE COMMITTEE MEETING on March 3, 2016 7:00 PM Town Hall IN ACCORDANCE WITH THE REQUIREMENTS O F THE OPEN MEETING LAW, PLEASE BE ADVISED THAT THIS MEETING IS BEING RECORDED AND BROADCAST OVER LUNENBURG PUBLIC ACCESS. AGENDA 1. Open meeting 2. Communications • Public Comment • New Communications 3. Department Budget Reviews – Library, Lunenburg P ublic Schools 4. Town Manager Reports 5. Review Minutes 6. Committee/Department Updates Capital Planning – John; DPW and Parks – John; Pub lic Access Committee – John Library – Terri; Public Safety – Terri; Sewer Commi ssion –Jay; Green Community Committee – Jay; School Committee – Karin; Monty Te ch – Karin; Council on Aging – Karin; School Building Committee – Mark; Building R euse –Mark 7. Ongoing Business • Pavement Management Plan • Contract commitments (e.g., sick leave buy back) • Sales of surplus property – Status 8. Next Meetings • Mar 10, 2016, 7:00 p.m. – Town Hall – Regularly Sc heduled Meeting o Council on Aging, Monty Tech • Mar 17, 2016, 7:00 p.m. – Town Hall – Special Meet ing o PACC, Sewer, Other 9. Adjournment ======================================================================================== DOCUMENT : 2016-03-03-minutes-2232.txt BOARD : finance-committee DATE : 2016-03-03 KIND : minutes OUR COPY : https://lunenburgbudgetproject.org/docs/minutes/text/finance-committee/2016-03-03-minutes-2232.txt TOWN PDF : https://www.lunenburgma.gov/AgendaCenter/ViewFile/Minutes/_03032016-2232 ======================================================================================== ===OCR macOS Vision=== ===PAGE 1=== Finance Committee: Mark Erickson, Chairman Terri Burchfield, Vice-Chairman John Henshaw, Secretary Karin Menard Jay Simeone Town Lutenbure 17 Main Street, P.O. Box 135 Lunenburg, MA 01462-0135 978.582.4139 FAX 978.582.4148 Minutes March 3, 2016 Location: Present: Absent: Also Present: Town Hall Mark Erickson, Terri Burchfield, Jay Simeone, John Henshaw Karin Menard Kerry Lafleur, Town Manager, Karen Brochu, Town Financial Manager/Director of Municipal Finance 1. Mark E. called the Finance Committee meeting to order at 7:00 pm. He announced that this meeting is being recorded and broadcast on the Lunenburg Public Access Cable Channel. The video recording is posted on YouTube at https://www.youtube.com/user/LunenburgAccess 2. Comments: a. Public: None b. New Communications: • Mark circulated the latest issue of The Beacon. • Mark said the committee has two openings. Interested citizens may fill out a talent bank form to apply. Note: These minutes are an overview of the presentations. For specific details, copies of Library Director Moore's and Superintendent Calmes' presentations are on the Town Web site. 3. Library FY17 Budget Presentation by Martha Moore, Library Director. Library Fiscal 2017 Budget Presentation by Martha Moore. Director For more specifics, you may access the presentation on the Finance Committee Page Overview: The Town Manager's recommended FY17 budget of $370,739 is $4,724 less than the library's request, but represents an increase over FY16 recap of $6,890 or 1.9%. • The budget satisfies all the requirements for the library to qualify for the two state aid grants. • Note: The portion of state aid to libraries that goes to defraying some of the cost of the CWMARS network has been cut. The library has to make up the difference. • In response to a question from Terri on whether there were savings in heating costs due to the new boiler, Martha said that a combination of the uncommonly warn winter and the fact that the library was not open to the public when the repairs were done in the winter of 2015, comparisons are not conclusive yet. Effects on Current Service Levels: • The difference between the budget requested by the library the recommendation by the Town Manager would mean fewer funds available for electronic materials and material for the Children's and Young Adults' sections of the library. • Usage of e-books, e-videos, and e-audio has increased by over 55% over a similar period of the prior year. Because these materials are expensive do to licensing fees because multiple users access the content, this increases the circulation budget, and some of the increase will go to fund this. Mn-FY16-160218.xIsx (local and remote drives) ===PAGE 2=== School Department Fiscal 2017 Budget Presentation by School Superintendent Loxi Calmes Below is a summary of the presentation. For details you can access the presentation on the Lunenburg Public Schools Site. Note: Potential Chapter 70 revenues range from $5,957,007 under the current formula to $6,248,530 in Governor Baker's budget. Available funding is not settled, nor is this budget. Overview: • The School Committee's FY17 budget proposal is $18,470,655, $312,595 more than the Town Manager's recommendation of $18,158.060—which recommendation is itself • The Town Manager's recommended budget for the schools represents an increase of $642,968 above FY16 recap, or 3.7%. • The budget includes $237,059 for additional personnel. • Further a combination of increased costs for health insurance and a costlier bus contract will add nearly $300,000 in expenditures. Effects on Service Levels and Future Plans and Issues: • Because total available funding is in flux the effects this budget would have on service levels and future plans cannot be determined. 4. Town Manager's Report: None. 5. Review of Minutes of February 18: Terri moved to approve the minutes; Jay seconded the motion. The committee approved the motion by a vote of 4-0. 6. Budget Goals and Opportunities: There was no discussion at this meeting. 7. Committee and Department Updates: Committee/Department DPW, Capital Planning-John H. Public Access Cable-John H. Update No report. Library-Terri B. Public Safety-Terri B. The PACC will meet on Monday, March 7. No report. Terri and John met with Chief Marino to explore some of the factors driving increased service demands on the department. Schools, Monty Tech, COA-Karin Sewer Commission, Green Task Force-Jay S. School Bldg. Comm., Building Re- use--Mark E. No report. No report. No report. 8. Next meeting: Thursday, March 10th. presentations on Council on Aging and Monty Tech FY17 budgets. 9. Adjournment: Terri made a motion to adjourn and Jay seconded the motion. The committee approved the motion 4-0 at 8:51. Respectfully submitted by John Henshaw March 9, 2016 Mn-FY16-160218.xlsx xisx (local and remote drives) 2 of? ===PAGE 3=== ENBURG FY 17 Recommended Budget Presentation to Finance Committee, March 3, 2016 We prepare students for lifelong learning and responsible community membership. Lunenburg Public Schools ===PAGE 4=== Personnel Non-Personnel Total FY17 School Committee Recommended School Budget January 20, 2016 FY15 Actuals $11,360,642 5 5,393,514 $16,754,156 FY16 Current $11,946,700 $ 5,568,867 $17,515,092 FY17 Recommended $18,470,655 ===PAGE 5=== Lunenburg School Committee Superintendent Instructional Program Principals (4) Special Services Director Athletic Director Business Manager Assistant Principals (2) District-Wide Special Services Faculty & Staff Data Manager School Assigned Faculty & Staff Food Service Managers 3) Operations Facilities Director Technology Director Head Custodians (4) School Technology Coordinator - Maintenance (2) Network Director Technician ===PAGE 6=== FY17 Projected Revenues & Recommended Expenditures as of 3/3/2016 Projected Revenues - Local $12,051,053 - Chapter 70 $5,957,007 (Town Manager) $6,248,530 ( Governor's Budget) - 40S $119,000 - Federal Grants $747,810 - Circuit Breaker $501,272 (@70%) - State Grants - $36,740 - Revolving $111,617 - Tuition/Fees $255,000 • Expenditures General Operation Budget $18,470,655 = 5.46% increase - Personnel $12,693,332 (assumes 3 retirements- 1 full & 2 partial) - Non-Personnel $5, 777,323 - Target $18,158,060 - Over Target $312,806 ( but in reality is now $475,624) ===PAGE 7=== Over-Target • Grade 3 Teacher $45K • Part-Time PE Teacher $27K • Technology Teacher $45K • MS/HS Office Clerk $23K • Technology Support $61K • Custodian $36K • Transportation Increase 40K • Health Insurance 96K • Unanticipated Placements $100K ===PAGE 8=== FY17 Personnel Drivers FY17 Recommended • Grade 3 Teacher • Technology Teacher Part-Time PE Teacher (recently added) MS/HS Office Clerk • School Technology Coordinator • Custodian $237,059 ===PAGE 9=== FY17 Non-Personnel Drivers Health Insurance Transportation Tuitions 253,721 40,000 56,300 ===PAGE 10=== Potential expenditures for $119,000 from 40S if appropriated • The following total more than the potential to be appropriated so whatever the final 40S amount may be reductions will be necessary. - Instructional Texts & Materials/Curriculum Adoption = $63,350 - Furniture = $26,200 - Library Books = $42,600 - Uniforms = $8,000 - Equipment = $9,850 ===PAGE 11=== School/Grade LUNENBURG PRIMARY SCHOOL: Pre-School Kindergarten Grade 1 Grade 2 Grade 3 Total--Primary School TURKEY HILL MIDDLE SCHOOL: Grade 4 Grade 5 Grade 6 Grade 7 Total--Turkey Hill Middle School 10/1/14 43 112 122 121 128 526 115 134 118 115 482 ENROLLMENT Out of Dist./Rel ated Services 3 0 0 0 2 5 Out of Dist. 0 1 1 2 10/1/15 531 38 100 116 133 120 507 138 118 140 119 484 515 Related Services 3 0 0 0 3 Out of Dist. 1 0 1 2 510 517 03/01/16 40 105 114 134 123 516 139 117 141 122 519 Related Services 3 0 0 0 3 Out of Dist. 1 1 519 520 ===PAGE 12=== LUNENBURG HIGH SCHOOL: Grade 8 Grade 9 Grade 10 Grade 11 Grade 12 Ungraded Total-Lunenburg High School TOTAL ALL SCHOOLS* 10/1/14 Out of Dist. 127 109 111 98 108 2 555 2 4 3 7 1 4 21 1563 28 *TOTALS INCLUDE CHOICE AND SHIRLEY STUDENTS 576 1591 10/1/15 115 118 111 108 94 5 : 551 1573 Out of Dist. 1 2 3 5 7 4 22 27 1/6/16 115 116 106 111 93 4 545 Out of Dist. 1 4 3 7 2 178 573 1600 1580 22 563 1602 ===PAGE 13=== Special Programs - Enrollment 1-Oct FY12 FY13 FY14 FY15 FY16 LEP 10 18 27 17 23 Special Services 282 280 259 263 276 Title 1 54 46 71 60 53 Low Income 145 226 243 241 335 ===PAGE 14=== Lunenburg Public Schools Custodial & Maintenance Staff Director of Facilities Senior Maintenance Lunenburg Primary School Senior Custodian Turkey Hill Middle School Senior Custodian MS HS Senior Custodian Evening Custodian Evening Custodian Evening Senior Custodian PT Evening Custodian (PT) PT Evening Custodian (PT) Evening Custodian (4) Maintenance Person (2) Day Utility Custodian Director of Facilities Senior Maintenance Maintenance Person Senior Custodian Evening Senior Custodian Day Utility Custodian Evening Custodian PT Evening Custodian Total FTE Recommended vs Current Staffing 1 1 2 3 1 1 6 0.88 15.88 0 4 1 5 0.88 13.88 ===PAGE 15=== LUNENBURG LIBRARY ANNUAL PRESENTATION & FY17 BUDGET REQUEST ===PAGE 16=== • Hired two new staff members [Children's & YA Librarian] • Celebrated the 10th anniversary of our wonderful building • Created a Wii Console & Gaming Center • Upgraded our Wi-Fi Network • Added 3 new E-Readers, a Telescope, and a volleyball kit to borrow • Begun a new Educational Outreach Program a Installed a new burner and LED exterior lights LPL ACCOMPLISHMENTS ===PAGE 17=== • People Traffic +10,191 +18% • Lunenburg Patron count 7,457 +4% • Circulation 87,781 +9% • Interlibrary loan 13,218 +22% • E content circulation 7,800 +55% • Programs 402 +27% USAGE STATISTICS ===PAGE 18=== FY 15 FY16 FY17 State Requirement $361,192 $363,325 $364,696 own Budget (MAR-Revolving) $353,192 $355,325 $356,696 brary Materials Requirement $57,791 $58,182. $58,182 $58,351 Av. Increase 0.4% 0.4% 0.3% STATE MANDATED MINIMUMS ===PAGE 19=== • LPL Requested FY17 Budget Total • Town Manager Recommendation • Difference $ 375,463 $ 370,739 $ 4,724 1% [less than] • LPL Request as % of Total Town Budget 1% [less than] • LPL's request as a per capita expense = $ 37.23 FY17 BUDGET ===PAGE 20=== • Newspapers & Journals (Fines, Revolving Fund) Copiers, Paper, Ink/Toner, Maintenance (Friends) Program Expenses (Friends) Museum Passes (Friends) Carpet cleaning, window cleaning (Friends) Library Supplies (Friends) • Website Hosting CWMARS Library System & Membership (State Aid ) E-books, special reference databases (State Aid) Reference Databases (State) ($50,000 value per library) • Approximately $50,000 spent outside of the budget EXPENSES NOT COVERED IN BUDGET ===PAGE 21=== o Increased cost of library materials • Purchasing e-books, e-video, e-audio - MUCH more expensive • Increased program activities = increased costs • Decrease in State Aid = Increase in CWMARS fees RATIONALE BEHIND INCREASES ===PAGE 22=== • More E-Content (books, videos, audio) • More programs • More community collaborations a Enhanced technologies LOOKING AHEAD ======================================================================================== DOCUMENT : 2016-03-10-agenda-2233.txt BOARD : finance-committee DATE : 2016-03-10 KIND : agenda OUR COPY : https://lunenburgbudgetproject.org/docs/minutes/text/finance-committee/2016-03-10-agenda-2233.txt TOWN PDF : https://www.lunenburgma.gov/AgendaCenter/ViewFile/Agenda/_03102016-2233 ======================================================================================== ===PAGE 1=== NOTI CE of FINANCE COMMITTEE MEETING on March 10, 2016 7:00 PM Town Hall IN ACCORDANCE WITH THE REQUIREMENTS O F THE OPEN MEETING LAW, PLEASE BE ADVISED THAT THIS MEETING IS BEING RECORDED AND BROADCAST OVER LUNENBURG PUBLIC ACCESS. AGENDA 1. Open meeting 2. Communications • Public Comment • New Communications 3. Department Budget Reviews – Council on Aging, Mo nty Tech 4. Town Manager Reports 5. Review Minutes 6. Committee/Department Updates Capital Planning – John; DPW and Parks – John; Pub lic Access Committee – John Library – Terri; Public Safety – Terri; Sewer Commi ssion –Jay; Green Community Committee – Jay; School Committee – Karin; Monty Te ch – Karin; Council on Aging – Karin; School Building Committee – Mark; Building R euse –Mark 7. Ongoing Business • Pavement Management Plan • Contract commitments (e.g., sick leave buy back) • Sales of surplus property – Status 8. Next Meetings • Mar 17, 2016, 7:00 p.m. – Town Hall – Special Meet ing o PACC, Sewer, Other • Mar 24, 2016, 7:00 p.m. – Town Hall – Regularly Sc heduled Meeting o Public Hearing FY17 Budget 9. Adjournment