Capital plans by year
lunenburgbudgetproject.org — written by the Lunenburg Budget Project, an independent tool for residents. Not affiliated with the Town of Lunenburg, the School Committee or the school district. The data this page is computed from: /data/topics/capital-years.json
Each year’s requests, rankings and funding, one year at a time.
Each fiscal year
Open FY2027 capital plan as its own page →
12 of 22 capital requests were funded, 56.0% of the dollars requested.
From ranked to funded
1Ranked by the Capital Planning Committee
22 requests · $3,267,208
FY2027 capital plan workbook, CPC rank and average
16 requests ranked here were not in it
2In the Town Manager’s preliminary program
6 requests · $1,532,127
Town Manager — preliminary FY2027 capital program, 1 February 2026
6 requests it left out were added
3In Article 13, which Town Meeting passed (known from the recording)
12 requests · $1,830,203
Annual Town Meeting warrant, May 2026, Article 13
What it means: The final plan was larger than the Town Manager’s first one; the first draft was not the ceiling.
12 of 22 requests were funded, 56.0% of the dollars; the first plan held 6.
What it means: The rest was not cancelled by this vote; the road-back grid on the hub shows which requests came back.
12
funded
22
ranked requests
56.0%
of the requested dollars funded
6
in the first plan
Every request, in rank order
- 1Flat Hill Rd Bridge Completion (Engineering and Construction)Public WorksPublic Works$350,000
- 2Patrol Cruiser (replacement)PolicePolice$68,627
- 3Engine 2 - 4x4 Brush Truck (replacement)FireFire$335,000
- 4Primary School Entry and Driveway Expansion (Design)SchoolsSchools$25,000
- 5Primary School Playground (Design)SchoolsSchools$30,000
- 6Supervisor Cruiser (replacement)PolicePolice$68,627
- 7Public Safety Building Roof RepairFacilitiesFacilities$494,500
- 8Public Safety Building Boiler UpgradesFacilitiesFacilities$115,000
- 9School Door Security Intercoms at Turkey Hill and Primary (replacement)SchoolsSchools$29,044
- 10Public Safety Controls UpgradeFacilitiesFacilities$35,000
- 11Front End Loader with Snow Plow (replacement, retain spare)Public WorksPublic Works$259,000
- 12Adult Activity Center Network UpgradeITIT$20,405
The highest-ranked request left unfunded
136 Wheel Dump/Spreader/Plow (replacement)Public WorksPublic Works$401,000- 14Primary School Window Safety FilmSchoolsSchools$29,005
- 15Mower (replacement)SchoolsSchools$49,800
- 16One Ton Dump / Plow Truck (replacement)Public WorksPublic Works$93,000
- 17Fabric Salt Shed & Anti-Icing Chemicals Equipment (Design & Permit)Public WorksPublic Works$200,000
- 18Fitzgerald Field Field ImprovementsFacilitiesFacilities$55,600
- 19Heat for THES Maintenance GarageSchoolsSchools$60,000
- 20Public Safety VCT Flooring ReplacementFacilitiesFacilities$38,600
- 21New West Townsend Rd. Drainage Improvements (Design)Public WorksPublic Works$125,000
- 22TC Passios Hazmat AbatementFacilitiesFacilities$385,000
What it means: Read down the list: where the solid bars stop is where the money ran out, and any solid bar below that point was funded out of order.
Every funded project ranked above every unfunded one in the committee’s order.
What it means: Here the funding line is one clean cut across the committee’s list.
12
funded
Requested, never ranked
- LMHS turf field: site survey, hillside hardscape and drainageSchools · amount not printeddropped before ranking
Why: Left out of the CPC FY2027 process before ranking. Stated: the CPC set it aside at the 29 Oct presentation; the CPC chair said on 19 Nov 2025 it could not be part of this year's process ("too complex and too slow") and expected a separate proposal and article; the same night the SC revised its FY27 plan without it, a speaker saying it would exceed the capital budget and need regular borrowing; on 18 Dec 2025 the chair wrote that an engineering and design proposal had just arrived and funding would have to be worked out. The superintendent later said the schools took it off. (document)
Ranked in: FY2025 rank 19 of 35 (not funded)
- Turkey Hill hot water tank replacementSchools · amount not printeddropped before ranking
Why: The quote came in below the capital threshold, so the schools hid its slide in the revised FY27 plan voted 19 Nov 2025. (meeting recording, captions)
Ranked in: never, FY2023 to FY2027
- Security camera central server replacement (district)Schools · amount not printeddropped before ranking
Why: none recorded (minutes and recordings searched)
Ranked in: never, FY2023 to FY2027
- LMHS window safety filmSchools · amount not printeddropped before ranking
Why: none recorded (minutes and recordings searched)
Ranked in: FY2025 rank 30 of 35 (not funded)
- Primary School generatorSchools · $292,998moved to FY2028
Why: Moved out of FY27 by the schools before ranking; presented to the CPC for a later year. (meeting recording, captions)
Ranked in: never, FY2023 to FY2027
- Turkey Hill classroom mini-splitsSchools · $500,000moved to FY2028
Why: Moved out of FY27 by the schools before ranking; presented to the CPC for a later year. (meeting recording, captions)
Ranked in: never, FY2023 to FY2027
- LMHS auditorium booth upgradesSchools · $49,984moved to FY2028
Why: Moved out of FY27 by the schools before ranking; presented to the CPC for a later year. (meeting recording, captions)
Ranked in: never, FY2023 to FY2027
- Primary School gas condensing boilers (plans)Schools · $30,000moved to FY2029
Why: Moved out of FY27 by the schools before ranking; presented to the CPC for a later year. (meeting recording, captions)
Ranked in: never, FY2023 to FY2027
- Public Safety Building garage oil-fired unit heatersFacilities · amount not printeddropped before ranking
Why: Dropped for lack of a price: the chair had set a deadline for a number, none came, and the heaters were removed from the list in scope. (meeting recording, captions)
Ranked in: never, FY2023 to FY2027
Folded into requests the committee did rank
- Primary School site improvements (driveway/parking and playground), as one projectSchools · amount not printedfolded into a ranked request
Why: Split into design stages by the schools before ranking. (meeting recording, captions)
Ranked in: FY2027 rank 4 of 22 (funded)
What it means: The ranked list is not every request; these never reached it.
9 requests made for FY2027 never reached the ranked list; 7 of 9 have a stated reason.
What it means: The list the committee ranked is what reached it, not every request a department made.
9
requested and never ranked
7 of 9
with a reason a document or recording states
Source [6]
Who asked, who got
What it means: A band that narrows was a smaller share of what was funded than of what was requested.
Public Works requested 43.7% of the dollars and received 33.3% of what was funded.
What it means: A share of dollars, not of projects: one large request moves it more than several small ones.
43.7%
Public Works’ share of the dollars requested
33.3%
Public Works’ share of the dollars funded
| Department | Cost | Capital Planning Committee | Members’ average rank | Funded | |
|---|---|---|---|---|---|
| Flat Hill Rd Bridge Completion (Engineering and Construction) | Public Works | $350,000 | 1 | 2 | yes |
| Patrol Cruiser (replacement) | Police | $68,627 | 2 | 3.2 | yes |
| Engine 2 - 4x4 Brush Truck (replacement) | Fire | $335,000 | 3 | 3.8 | yes |
| Primary School Entry and Driveway Expansion (Design) | Schools | $25,000 | 4 | 5.4 | yes |
| Primary School Playground (Design) | Schools | $30,000 | 5 | 6 | yes |
| Supervisor Cruiser (replacement) | Police | $68,627 | 6 | 6.8 | yes |
| Public Safety Building Roof Repair | Facilities | $494,500 | 7 | 6.8 | yes |
| Public Safety Building Boiler Upgrades | Facilities | $115,000 | 8 | 8 | yes |
| School Door Security Intercoms at Turkey Hill and Primary (replacement) | Schools | $29,044 | 9 | 9.2 | yes |
| Public Safety Controls Upgrade | Facilities | $35,000 | 10 | 11.6 | yes |
| Front End Loader with Snow Plow (replacement, retain spare) | Public Works | $259,000 | 11 | 12.6 | yes |
| Adult Activity Center Network Upgrade | IT | $20,405 | 12 | 14 | yes |
| 6 Wheel Dump/Spreader/Plow (replacement) | Public Works | $401,000 | 13 | 14 | no |
| Primary School Window Safety Film | Schools | $29,005 | 14 | 14.6 | no |
| Mower (replacement) | Schools | $49,800 | 15 | 15 | no |
| One Ton Dump / Plow Truck (replacement) | Public Works | $93,000 | 16 | 15.4 | no |
| Fabric Salt Shed & Anti-Icing Chemicals Equipment (Design & Permit) | Public Works | $200,000 | 17 | 16.4 | no |
| Fitzgerald Field Field Improvements | Facilities | $55,600 | 18 | 16.6 | no |
| Heat for THES Maintenance Garage | Schools | $60,000 | 19 | 16.6 | no |
| Public Safety VCT Flooring Replacement | Facilities | $38,600 | 20 | 17.4 | no |
| New West Townsend Rd. Drainage Improvements (Design) | Public Works | $125,000 | 21 | 17.8 | no |
| TC Passios Hazmat Abatement | Facilities | $385,000 | 22 | 17.8 | no |
| Funded of requested | Requested | Share of requests | Funded | Share of funded | Its own dollars funded | |
|---|---|---|---|---|---|---|
| Public Works | 2 of 6 | $1,428,000 | 43.7% | $609,000 | 33.3% | 42.6% |
| Facilities | 3 of 6 | $1,123,700 | 34.4% | $644,500 | 35.2% | 57.4% |
| Fire | 1 of 1 | $335,000 | 10.3% | $335,000 | 18.3% | 100.0% |
| Schools | 3 of 6 | $222,849 | 6.8% | $84,044 | 4.6% | 37.7% |
| Police | 2 of 2 | $137,254 | 4.2% | $137,254 | 7.5% | 100.0% |
| IT | 1 of 1 | $20,405 | 0.6% | $20,405 | 1.1% | 100.0% |
Shares of dollars. Requested means every request the committee’s list holds.
What the documents do not show
Each department’s own order of its requests. Closes: each department’s FY2027 priority list, requested by records request on 20 November 2026.
Every request each department filed for FY2027, including any never presented or minuted. Closes: each department’s complete request list, requested by records request on 20 November 2026.
The Town Clerk’s written record of the Article 13 vote. The vote is known from the meeting recording only.
Sources
- [1]FY2027 capital plan workbook, CPC rank and average
- [2]Capital Planning Committee — FY2027 priorities list, each member’s rank (sent by its Chair)
- [3]Town Manager — preliminary FY2027 capital program, 1 February 2026
- [4]Annual Town Meeting warrant, May 2026, Article 13
- [5]Lunenburg Budget Project — capital-rankings.csv, every row and its page or cell
- [6]Lunenburg Budget Project — capital-requests-unranked.csv, every request made and never ranked, with the page, line or second it was read from