Capital planning

FY2027 capital plan

12 of 22 capital requests were funded, 56.0% of the dollars requested.

From ranked to funded

  1. 1Ranked by the Capital Planning Committee

    22 requests · $3,267,208

    FY2027 capital plan workbook, CPC rank and average

    16 requests ranked here were not in it

  2. 2In the Town Manager’s preliminary program

    6 requests · $1,532,127

    Town Manager — preliminary FY2027 capital program, 1 February 2026

    6 requests it left out were added

  3. 3In Article 13, which Town Meeting passed (known from the recording)

    12 requests · $1,830,203

    Annual Town Meeting warrant, May 2026, Article 13

Each bar is that stage’s dollars against the ranked total. Stage names are the year’s own documents’.

What it means: The final plan was larger than the Town Manager’s first one; the first draft was not the ceiling.

Sources [1][3][4]

12 of 22 requests were funded, 56.0% of the dollars; the first plan held 6.

What it means: The rest was not cancelled by this vote; the road-back grid on the hub shows which requests came back.

12

funded

22

ranked requests

56.0%

of the requested dollars funded

6

in the first plan

Every request, in rank order

In the order of
FundedNot funded
  1. 1Flat Hill Rd Bridge Completion (Engineering and Construction)Public Works$350,000
  2. 2Patrol Cruiser (replacement)Police$68,627
  3. 3Engine 2 - 4x4 Brush Truck (replacement)Fire$335,000
  4. 4Primary School Entry and Driveway Expansion (Design)Schools$25,000
  5. 5Primary School Playground (Design)Schools$30,000
  6. 6Supervisor Cruiser (replacement)Police$68,627
  7. 7Public Safety Building Roof RepairFacilities$494,500
  8. 8Public Safety Building Boiler UpgradesFacilities$115,000
  9. 9School Door Security Intercoms at Turkey Hill and Primary (replacement)Schools$29,044
  10. 10Public Safety Controls UpgradeFacilities$35,000
  11. 11Front End Loader with Snow Plow (replacement, retain spare)Public Works$259,000
  12. 12Adult Activity Center Network UpgradeIT$20,405
  13. The highest-ranked request left unfunded

    136 Wheel Dump/Spreader/Plow (replacement)Public Works$401,000
  14. 14Primary School Window Safety FilmSchools$29,005
  15. 15Mower (replacement)Schools$49,800
  16. 16One Ton Dump / Plow Truck (replacement)Public Works$93,000
  17. 17Fabric Salt Shed & Anti-Icing Chemicals Equipment (Design & Permit)Public Works$200,000
  18. 18Fitzgerald Field Field ImprovementsFacilities$55,600
  19. 19Heat for THES Maintenance GarageSchools$60,000
  20. 20Public Safety VCT Flooring ReplacementFacilities$38,600
  21. 21New West Townsend Rd. Drainage Improvements (Design)Public Works$125,000
  22. 22TC Passios Hazmat AbatementFacilities$385,000
One bar a request, as long as its cost; solid bars were funded. Department is our grouping of the project numbers the documents print.

What it means: Read down the list: where the solid bars stop is where the money ran out, and any solid bar below that point was funded out of order.

Sources [1][2][3][4]

Every funded project ranked above every unfunded one in the committee’s order.

What it means: Here the funding line is one clean cut across the committee’s list.

12

funded

Requested, never ranked

  • LMHS turf field: site survey, hillside hardscape and drainageSchools · amount not printeddropped before ranking

    Why: Left out of the CPC FY2027 process before ranking. Stated: the CPC set it aside at the 29 Oct presentation; the CPC chair said on 19 Nov 2025 it could not be part of this year's process ("too complex and too slow") and expected a separate proposal and article; the same night the SC revised its FY27 plan without it, a speaker saying it would exceed the capital budget and need regular borrowing; on 18 Dec 2025 the chair wrote that an engineering and design proposal had just arrived and funding would have to be worked out. The superintendent later said the schools took it off. (document)

    Ranked in: FY2025 rank 19 of 35 (not funded)

  • Turkey Hill hot water tank replacementSchools · amount not printeddropped before ranking

    Why: The quote came in below the capital threshold, so the schools hid its slide in the revised FY27 plan voted 19 Nov 2025. (meeting recording, captions)

    Ranked in: never, FY2023 to FY2027

  • Security camera central server replacement (district)Schools · amount not printeddropped before ranking

    Why: none recorded (minutes and recordings searched)

    Ranked in: never, FY2023 to FY2027

  • LMHS window safety filmSchools · amount not printeddropped before ranking

    Why: none recorded (minutes and recordings searched)

    Ranked in: FY2025 rank 30 of 35 (not funded)

  • Primary School generatorSchools · $292,998moved to FY2028

    Why: Moved out of FY27 by the schools before ranking; presented to the CPC for a later year. (meeting recording, captions)

    Ranked in: never, FY2023 to FY2027

  • Turkey Hill classroom mini-splitsSchools · $500,000moved to FY2028

    Why: Moved out of FY27 by the schools before ranking; presented to the CPC for a later year. (meeting recording, captions)

    Ranked in: never, FY2023 to FY2027

  • LMHS auditorium booth upgradesSchools · $49,984moved to FY2028

    Why: Moved out of FY27 by the schools before ranking; presented to the CPC for a later year. (meeting recording, captions)

    Ranked in: never, FY2023 to FY2027

  • Primary School gas condensing boilers (plans)Schools · $30,000moved to FY2029

    Why: Moved out of FY27 by the schools before ranking; presented to the CPC for a later year. (meeting recording, captions)

    Ranked in: never, FY2023 to FY2027

  • Public Safety Building garage oil-fired unit heatersFacilities · amount not printeddropped before ranking

    Why: Dropped for lack of a price: the chair had set a deadline for a number, none came, and the heaters were removed from the list in scope. (meeting recording, captions)

    Ranked in: never, FY2023 to FY2027

Folded into requests the committee did rank

  • Primary School site improvements (driveway/parking and playground), as one projectSchools · amount not printedfolded into a ranked request

    Why: Split into design stages by the schools before ranking. (meeting recording, captions)

    Ranked in: FY2027 rank 4 of 22 (funded)

Requests found in the committee’s minutes, the department and Town Manager decks, the committee’s workbooks and the School Committee’s plans. The departments’ own complete lists are not held, so there may be more. A reason is shown only where a document or a speaker states one.

What it means: The ranked list is not every request; these never reached it.

9 requests made for FY2027 never reached the ranked list; 7 of 9 have a stated reason.

What it means: The list the committee ranked is what reached it, not every request a department made.

9

requested and never ranked

7 of 9

with a reason a document or recording states

Source [6]

Who asked, who got

RequestedFundedPublic Works: 43.7% of the requests, 33.3% of the fundedPublic Works 43.7%33.3% Public WorksFacilities: 34.4% of the requests, 35.2% of the fundedFacilities 34.4%35.2% FacilitiesFire: 10.3% of the requests, 18.3% of the fundedFire 10.3%18.3% FireSchools: 6.8% of the requests, 4.6% of the fundedSchools 6.8%4.6% SchoolsPolice: 4.2% of the requests, 7.5% of the fundedPolice 4.2%7.5% PoliceIT: 0.6% of the requests, 1.1% of the funded
Shares of dollars. Department is our grouping of the printed project numbers; it matches every department total the year’s documents print.

What it means: A band that narrows was a smaller share of what was funded than of what was requested.

Sources [4][5]

Public Works requested 43.7% of the dollars and received 33.3% of what was funded.

What it means: A share of dollars, not of projects: one large request moves it more than several small ones.

43.7%

Public Works’ share of the dollars requested

33.3%

Public Works’ share of the dollars funded

Every request and every rank
DepartmentCostCapital Planning CommitteeMembers’ average rankFunded
Flat Hill Rd Bridge Completion (Engineering and Construction)Public Works$350,00012yes
Patrol Cruiser (replacement)Police$68,62723.2yes
Engine 2 - 4x4 Brush Truck (replacement)Fire$335,00033.8yes
Primary School Entry and Driveway Expansion (Design)Schools$25,00045.4yes
Primary School Playground (Design)Schools$30,00056yes
Supervisor Cruiser (replacement)Police$68,62766.8yes
Public Safety Building Roof RepairFacilities$494,50076.8yes
Public Safety Building Boiler UpgradesFacilities$115,00088yes
School Door Security Intercoms at Turkey Hill and Primary (replacement)Schools$29,04499.2yes
Public Safety Controls UpgradeFacilities$35,0001011.6yes
Front End Loader with Snow Plow (replacement, retain spare)Public Works$259,0001112.6yes
Adult Activity Center Network UpgradeIT$20,4051214yes
6 Wheel Dump/Spreader/Plow (replacement)Public Works$401,0001314no
Primary School Window Safety FilmSchools$29,0051414.6no
Mower (replacement)Schools$49,8001515no
One Ton Dump / Plow Truck (replacement)Public Works$93,0001615.4no
Fabric Salt Shed & Anti-Icing Chemicals Equipment (Design & Permit)Public Works$200,0001716.4no
Fitzgerald Field Field ImprovementsFacilities$55,6001816.6no
Heat for THES Maintenance GarageSchools$60,0001916.6no
Public Safety VCT Flooring ReplacementFacilities$38,6002017.4no
New West Townsend Rd. Drainage Improvements (Design)Public Works$125,0002117.8no
TC Passios Hazmat AbatementFacilities$385,0002217.8no

Sources [1][2][3][4][5]

Each department’s share
Funded of requestedRequestedShare of requestsFundedShare of fundedIts own dollars funded
Public Works2 of 6$1,428,00043.7%$609,00033.3%42.6%
Facilities3 of 6$1,123,70034.4%$644,50035.2%57.4%
Fire1 of 1$335,00010.3%$335,00018.3%100.0%
Schools3 of 6$222,8496.8%$84,0444.6%37.7%
Police2 of 2$137,2544.2%$137,2547.5%100.0%
IT1 of 1$20,4050.6%$20,4051.1%100.0%

Shares of dollars. Requested means every request the committee’s list holds.

Sources [4][5]

What the documents do not show

Each department’s own order of its requests. Closes: each department’s FY2027 priority list, requested by records request on 20 November 2026.

Every request each department filed for FY2027, including any never presented or minuted. Closes: each department’s complete request list, requested by records request on 20 November 2026.

The Town Clerk’s written record of the Article 13 vote. The vote is known from the meeting recording only.

Sources [1][2][3][4]

Sources

  1. [1]FY2027 capital plan workbook, CPC rank and average
  2. [2]Capital Planning Committee — FY2027 priorities list, each member’s rank (sent by its Chair)
  3. [3]Town Manager — preliminary FY2027 capital program, 1 February 2026
  4. [4]Annual Town Meeting warrant, May 2026, Article 13
  5. [5]Lunenburg Budget Project — capital-rankings.csv, every row and its page or cell
  6. [6]Lunenburg Budget Project — capital-requests-unranked.csv, every request made and never ranked, with the page, line or second it was read from

What changed

Version 15 — updated September 20, 2026