Buildings and grounds

Upkeep leftover by account

Building upkeep left $195,934 in FY2026 on 14 accounts; each card shows what was paid, skipped and released.

Where the leftover sits

The $195,934 left on building upkeep in FY2026, by the account it was left on.

1 · The facts

  • $195,934

    left unspent, FY2026

  • 14

    accounts holding it

  • $75,660

    on contracted building services

  • $89,856

    less paid there than in FY2025

  • $63,258

    budget rise beyond spending, other accounts

  • $81,553

    ordered and released unpaid

  • 11

    usual payees under half of usual

    our estimate

2 · What it shows

  1. 1

    $75,660 of it is contracted building services, where $89,856 less was paid than in FY2025.

  2. 2

    On the other 13 accounts, budgets rose $63,258 more than spending did.

  3. 3

    Across the line, $81,553 was ordered and released unpaid, and 11 usual payees were skipped.

Where the $195,934 was left, account by account

Open a card to see what was paid, what is usually paid and was not, which orders were released unpaid, and who was new. Invoice text as MUNIS prints it, cut short.

Contracted building services0100-3-300-4220-01-1-74-2-535006$75,660left

Spending fell against FY2025.

  • Budget $288,291
  • Paid $203,783
  • On order $8,848
  • Budget vs FY2025 +$13,402
  • Paid vs FY2025 -$89,856

Usually paid, not this year

Invoices readUsual a yearFY2026
Valley Communication911 COMPLIANCE$26,081$0
Control TechnologiesCONTROL, REPAIRS F$27,201$9,158
Johnson ControlsSPRINKLER AND FIRE$11,578$1,217
J & J Commercial SerPRIMARY SCHOOL FLO$9,476$1,525
Signet Electronic SySERVICE TO SECURIT$7,592$0
Protective ServicesMONITOR BURGLAR SY$3,851$331

Paid in every year FY2023 to FY2025; under half of that average in FY2026.

Ordered, then released unpaid

OrderedVendorThe jobReleased
250013412024-11-18Daikin AppliedLMHS - SLA Roof Top Units$13,000
250023132025-06-09Daikin AppliedAIR CONDITIONING UNIT FIX$11,000
260027062026-06-22Red Line Wall SystemTERMITE DAMAGE THES$8,750
260001782025-07-14Di-Rock Electric CoELECTRICAL WORK AT THES FOR TC$7,785
250005612024-08-13Johnson ControlsLMHS - Sprinkler, Extinquisher$6,921
250005632024-08-13Johnson ControlsPrimary School - Sprinkler, Ex$4,535
260019822026-04-02Johnson Controls UsLMHS FIRE ALARM REPAIR$3,737
260025242026-06-03Johnson Controls UsREPLACE SMOKE DETECTORS AND PU$3,150
260019482026-03-30Johnson Controls UsPRIMARY SCHOOL FIRE ALARM REPA$2,020
250009862024-09-25Ockers CompanyNEW CABLING PROJECT FOR 911 CO$1,600
260016462026-02-09Control TechnologiesBUILDING OVERHEATING PRIMARY S$1,361
260027042026-06-22Renaud Hvac & ControLHS HRU 4 AND HRU 5$1,197
260012062025-11-04Johnson Controls UsSMOKE DETECTORS$900
260008992025-09-23Delta BeckwithLMHS PLAC REM & FLOORING THES$866
250005622024-08-13Johnson ControlsTHES - Extinquisher Agreement$571

Purchase orders closed or cut in FY2026 without payment; some were carried in from FY2025.

Largest payments, FY2026

Invoices readFY2025FY2026
Renaud Hvac & ControTHES VALVE NO HOT$0$38,243
Delta BeckwithPrimary School Saf$42,181$35,330
Combustion Service CBOILERS REPAIRS/SE$11,356$24,597
Daikin AppliedROOF TOP PREVENTAT$26,210$18,684
Di-Rock Electric CoELECTRICAL MAINTEN$220$17,109
Johnson Controls UsPRIMARY SCHOOL YEA$0$11,512

New in FY2026

Invoices readFY2026
Renaud Hvac & ControTHES VALVE NO HOT$38,243
Johnson Controls UsPRIMARY SCHOOL YEA$11,512
Airex CorporationFILTERS FOR ALL SC$9,428
Benjamin HoenshellREPAIR OF LIGHTS$4,988
Custom Computer SpecGENETEC RENEWAL FO$4,139
Aecom Technical ServTHES COMMERCIAL TU$3,862

Paid in FY2026 and in none of the three years before.

“The entire building needs to be re-cabled to have a drop line in every single classroom for the connection. The additional cost of $60,000 was not in the original budget.”
Finance Committee minutes, 13 February 2025, on the cabling paid by Reserve Fund transfer

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Emergency expenditures0100-3-300-4220-99-1-74-2-545004$21,000left

Budget rose faster than spending.

  • Budget $30,000
  • Paid $9,000
  • On order $0
  • Budget vs FY2025 +$20,000
  • Paid vs FY2025 +$1,500

Largest payments, FY2026

Invoices readFY2025FY2026
American Service ComADDITIONAL WIRING$0$9,000

New in FY2026

Invoices readFY2026
American Service ComADDITIONAL WIRING$9,000

Paid in FY2026 and in none of the three years before.

“What would constitute an emergency expenditure? A water heater in one of the schools breaking, A server failure that cannot be repaired”
LPS answers to the Finance Committee, FY2027 budget

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Building maintenance supplies0100-3-300-4220-99-1-74-2-541002$19,549left

Budget rose faster than spending.

  • Budget $80,229
  • Paid $51,534
  • On order $9,147
  • Budget vs FY2025 +$15,100
  • Paid vs FY2025 -$4,846

Usually paid, not this year

Invoices readUsual a yearFY2026
Daikin AppliedCUS#605478 MISC HV$3,297$0

Paid in every year FY2023 to FY2025; under half of that average in FY2026.

Ordered, then released unpaid

OrderedVendorThe jobReleased
260018772026-03-23Grainger W W IncVACUUMS$580
260019462026-03-30Wesco Distribution,POWERSONIC QUOTE S6402887$529
260015772026-01-27Dugmore & Duncan IncBLANK KEYS FOR KEY MACHINE$348
260027942026-06-30Wesco Distribution,POWERSONIC$300
260026712026-06-18Webb F W CompanySUPPLIES$251
260025842026-06-10Aubuchon HardwareSUPPLIES$140
250004972024-08-08Aubuchon HardwareDistrict Aubuchon Supplies$122
250023092025-06-09Amazon.ComFACILITY PUCHASES FOR THES MOV$107
260024572026-06-03Maki Building CenterSUPPLIES$83
260016902026-02-11O'Connell Inc, RpMOTOR AND COUPLING$76
260008162025-09-10Maki Building CenterHORNET SPRAY$28

Purchase orders closed or cut in FY2026 without payment; some were carried in from FY2025.

Largest payments, FY2026

Invoices readFY2025FY2026
Airex CorporationBLDG AIR FILTER FO$0$8,426
Wesco DistributionPOWERSONIC BARRERI$0$6,060
Gymnasium Floors IncLMHS - Recoat Gym$5,121$5,196
Grainger W W IncDTY MTR SPLT/MOTOR$363$5,080
Webb F W CompanyDistrict FW Webb S$2,526$4,384
Aramsco IncFLOOR FINISH$0$3,351

New in FY2026

Invoices readFY2026
Wesco DistributionPOWERSONIC BARRERI$6,060
Aramsco IncFLOOR FINISH$3,351
Air Control ProductsTUBING$1,782
Benjamin HoenshellBUCKET TRUCK/OPERA$600
Renaud Hvac & ControMOTOR AND COUPLING$543
New England Door SolTHRESHOLD$502

Paid in FY2026 and in none of the three years before.

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Fire safety and furniture repair0100-3-300-4230-99-1-74-2-525009$18,647left

Budgeted above what it spends, in FY2025 and FY2026.

  • Budget $24,005
  • Paid $5,358
  • On order $0
  • Budget vs FY2025 +$9,368
  • Paid vs FY2025 -$5,848

Usually paid, not this year

Invoices readUsual a yearFY2026
Johnson ControlsREPLACE EXTINGUIS$5,054$0

Paid in every year FY2023 to FY2025; under half of that average in FY2026.

Ordered, then released unpaid

OrderedVendorThe jobReleased
260025782026-06-10Protective ServicesMONITORING FY 25-26$220

Purchase orders closed or cut in FY2026 without payment.

Largest payments, FY2026

Invoices readFY2025FY2026
Protective ServicesINSPECTIONS AND MO$3,742$3,990
Virco IncTWIN WHEEL SWIVERL$0$1,368

New in FY2026

Invoices readFY2026
Virco IncTWIN WHEEL SWIVERL$1,368

Paid in FY2026 and in none of the three years before.

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Networking services0100-3-300-4400-99-1-52-2-535006$18,565left

Budget rose faster than spending.

  • Budget $72,158
  • Paid $53,518
  • On order $75
  • Budget vs FY2025 +$37,993
  • Paid vs FY2025 +$25,516

Ordered, then released unpaid

OrderedVendorThe jobReleased
260004792025-07-30Comcast BusinessINTERNET 2025-2026$1,039
260007782025-09-03T-Mobile Usa IncHOT SPOTS 25-26$723

Purchase orders closed or cut in FY2026 without payment.

Largest payments, FY2026

Invoices readFY2025FY2026
Comcast BusinessINTERNET 2025-2026$26,237$25,754
Cdw GovernmentCROWDSTRIKE SOFTWA$0$15,098
Custom Computer SpecS5 INFINITE CLOUD$0$11,725
T-Mobile Usa IncEMERGENCY HOT SPOT$1,766$942

New in FY2026

Invoices readFY2026
Cdw GovernmentCROWDSTRIKE SOFTWA$15,098
Custom Computer SpecS5 INFINITE CLOUD$11,725

Paid in FY2026 and in none of the three years before.

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Custodial supplies0100-3-300-4110-99-1-74-2-541001$16,594left

Budgeted above what it spends, in FY2025 and FY2026.

  • Budget $75,000
  • Paid $58,406
  • On order $0
  • Budget vs FY2025 -$13,885
  • Paid vs FY2025 -$1,001

Ordered, then released unpaid

OrderedVendorThe jobReleased
260025802026-06-10Rovic Inc.SUPPLIES$660

Purchase orders closed or cut in FY2026 without payment.

Largest payments, FY2026

Invoices readFY2025FY2026
Rovic IncCUSTODIAL SUPPLIES$58,659$58,406

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Grounds supplies0100-3-300-4210-99-1-74-2-545003$11,382left

Budget rose faster than spending.

  • Budget $49,937
  • Paid $38,555
  • On order $0
  • Budget vs FY2025 +$29,242
  • Paid vs FY2025 +$17,860

Usually paid, not this year

Invoices readUsual a yearFY2026
Pioneer Mfg CoLU1706 PAINT & GRA$3,195$1,427

Paid in every year FY2023 to FY2025; under half of that average in FY2026.

Ordered, then released unpaid

OrderedVendorThe jobReleased
260011222025-10-22Fairbanks Power EquiBLANKET PO$1,500
260013132025-12-03Amazon.ComPLUG PROTECTORS/TIES FOR FACIL$14

Purchase orders closed or cut in FY2026 without payment.

Largest payments, FY2026

Invoices readFY2025FY2026
Jacobs Richard MATHLETIC FIELD MAI$19,400$19,067
Webb F W CompanyTHERM CONTROLS$0$5,530
Sweet'S Property SolLAWN MOWING$0$2,983
Suburban Glass & MirSERVICE CALL TO AD$0$2,968
Mass Landscape SupplICE MELT$0$2,499
Schofield Power EquiLAWNMOWER - SPLIT$0$1,650

New in FY2026

Invoices readFY2026
Webb F W CompanyTHERM CONTROLS$5,530
Sweet'S Property SolLAWN MOWING$2,983
Suburban Glass & MirSERVICE CALL TO AD$2,968
Mass Landscape SupplICE MELT$2,499
Schofield Power EquiLAWNMOWER - SPLIT$1,650
Siteone Landscape SuATHLETIC FIELD MAR$1,319

Paid in FY2026 and in none of the three years before.

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Contracted Services0100-3-300-4210-01-1-74-2-535006$3,992left

Budgeted above what it spends, in FY2025 and FY2026.

  • Budget $38,328
  • Paid $34,336
  • On order $0
  • Budget vs FY2025 +$11,428
  • Paid vs FY2025 +$18,472

Ordered, then released unpaid

OrderedVendorThe jobReleased
260023112026-05-12Peter MartinPRIMARY SCHOOL AND LMHS EGRESS$2,300
260023542026-05-18Timber Pros LlcTREATMENT OF TERMITES THES$1,850
260027052026-06-22Gregs Irrigation IncFIELD IRRIGATION$740

Purchase orders closed or cut in FY2026 without payment.

Largest payments, FY2026

Invoices readFY2025FY2026
Jacobs Richard MLANDSCAPING CARE P$0$9,533
Masterlibrary.Com LlFACILITIES RESERVA$3,050$4,500
Pioneer Mfg CoPAINT FOR FIELD$0$4,407
J & J Commercial SerPRIMARY DISHWASHER$0$4,356
Morse Bros LlcPRIMARY SCHOOL LEA$0$4,205
Montachusett Pest CoDistrict Pest Cont$500$3,595

New in FY2026

Invoices readFY2026
Pioneer Mfg CoPAINT FOR FIELD$4,407
Morse Bros LlcPRIMARY SCHOOL LEA$4,205
Gregs Irrigation IncIRRIGATION SYSTEM$740

Paid in FY2026 and in none of the three years before.

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Veh Mtc Repairs/Maintenance0100-3-300-4230-99-1-76-2-524100$3,676left

Budgeted above what it spends, in FY2025 and FY2026.

  • Budget $19,000
  • Paid $15,324
  • On order $0
  • Budget vs FY2025 +$3,135
  • Paid vs FY2025 +$2,045

Ordered, then released unpaid

OrderedVendorThe jobReleased
260010552025-10-16Mte Equipment SolutiPARTS FOR KUBOTA$1,394
260011702025-10-30Amazon.ComTIRES FOR JOHN DEERE$250
260016312026-02-09Madigan J.C. IncHARNESS PLOW LIGHT$172

Purchase orders closed or cut in FY2026 without payment.

Largest payments, FY2026

Invoices readFY2025FY2026
Seeley AutomotiveMisc. Automobile a$3,631$3,350
Mte Equipment SolutiOIL$0$2,537
Raps Auto Parts SuppDistrict NAPA Supp$670$2,234
Madigan J.C. IncPLOW PARTS FOR WIN$0$1,338
Rivers Bros.,IncVEHICLE REPAIRS/IN$65$275

New in FY2026

Invoices readFY2026
Mte Equipment SolutiOIL$2,537

Paid in FY2026 and in none of the three years before.

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Computer Mtc/Repair System0100-3-300-4230-99-1-52-2-525008$3,536left

Budgeted above what it spent in FY2026.

  • Budget $4,500
  • Paid $964
  • On order $0
  • Budget vs FY2025 +$4,500
  • Paid vs FY2025 +$964

Largest payments, FY2026

Invoices readFY2025FY2026
Ockers CompanyTOUCHSCREEN REPAIR$0$964

New in FY2026

Invoices readFY2026
Ockers CompanyTOUCHSCREEN REPAIR$964

Paid in FY2026 and in none of the three years before.

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Repair Of Equip/Maintenance0100-3-300-4230-99-1-74-2-525011$2,431left

Budgeted above what it spends, in FY2025 and FY2026.

  • Budget $5,000
  • Paid $2,569
  • On order $0
  • Budget vs FY2025 +$500
  • Paid vs FY2025 +$277

Largest payments, FY2026

Invoices readFY2025FY2026
Raps Auto Parts SuppHYDRAULIC OIL$85$990
United AgJOHN DEERE SUPPLIE$1,757$930
Schofield Power EquiMISC repairs and p$151$649

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Repair Of Music Equipment0100-3-300-4230-05-5-63-2-525001$623left

Budgeted above what it spends, in FY2025 and FY2026.

  • Budget $1,800
  • Paid $1,177
  • On order $0
  • Budget vs FY2025 +$50
  • Paid vs FY2025 -$541

Ordered, then released unpaid

OrderedVendorThe jobReleased
260010882025-10-20David French Music C[redacted] FRENCH INSTRUMENT REPAIR$323
260011032025-10-20David M WolfPERCUSSION REPAIR$300

Purchase orders closed or cut in FY2026 without payment.

Largest payments, FY2026

Invoices readFY2025FY2026
David French Music CMUSIC INSTRUMENT R$1,718$1,177

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Repair Physical Ed Equipment0100-3-300-4230-06-6-62-2-525010$169left

Budgeted above what it spent in FY2026.

  • Budget $1,150
  • Paid $981
  • On order $0
  • Budget vs FY2025 +$1,150
  • Paid vs FY2025 +$981

Largest payments, FY2026

Invoices readFY2025FY2026
Gopher SportREPLACEMENT OF BRO$0$981

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Repair Of Music Equipment0100-3-300-4230-06-6-63-2-525001$110left

Budgeted above what it spends, in FY2025 and FY2026.

  • Budget $1,000
  • Paid $890
  • On order $0
  • Budget vs FY2025 -$2,500
  • Paid vs FY2025 -$2,556

Usually paid, not this year

Invoices readUsual a yearFY2026
David French Music CINSTRUMENT REPAIRS$1,589$740
Blanchard Piano ServPIANO TUNINGS$617$0

Paid in every year FY2023 to FY2025; under half of that average in FY2026.

Ordered, then released unpaid

OrderedVendorThe jobReleased
260004962025-07-30David French Music CINSTRUMENT REPAIRS$60
260005182025-07-30Wolf David MalcomINSTRUMENT REPAIRS$50

Purchase orders closed or cut in FY2026 without payment.

Largest payments, FY2026

Invoices readFY2025FY2026
David French Music CINSTRUMENT REPAIRS$1,596$740
Wolf David MalcomINSTRUMENT REPAIRS$0$150

New in FY2026

Invoices readFY2026
Wolf David MalcomINSTRUMENT REPAIRS$150

Paid in FY2026 and in none of the three years before.

What this does not show: whether a skipped purchase or a released order was done some other way, and the basis for this line’s budget. Would settle it: the facilities work orders for FY2026, and the district’s basis for the line.

Sources

What changed