FY2023 capital plan
lunenburgbudgetproject.org — written by the Lunenburg Budget Project, an independent tool for residents. Not affiliated with the Town of Lunenburg, the School Committee or the school district. The data this page is computed from: /data/topics/capital-fy2023.json
23 of 30 capital requests were funded, 53.5% of the dollars requested.
From ranked to funded
1Ranked by the Capital Planning Committee
30 requests · $4,043,049
Town Manager — FY2023 Capital Investment Plan presentation, 18 January 2022
10 requests ranked here were not in it
2In the Town Manager’s plan as presented
20 requests · $1,740,049
Town Manager — FY2023 Capital Investment Plan presentation, 18 January 2022
3 requests it left out were added
3Funded at Town Meeting
23 requests · $2,162,849
Town of Lunenburg — FY2022 annual town report (Article 6, May 2022)
What it means: The final plan was larger than the Town Manager’s first one; the first draft was not the ceiling.
23 of 30 requests were funded, 53.5% of the dollars; the first plan held 20.
What it means: The rest was not cancelled by this vote; the road-back grid on the hub shows which requests came back.
23
funded
30
ranked requests
53.5%
of the requested dollars funded
20
in the first plan
Every request, in rank order
- 1PSB, Eng. Design for Drainage & Pavement RepairsFacilitiesFacilities$25,000
- 210-Wheel, plow & sand Repl. 1994 MackPublic WorksPublic Works$250,000
- 3Senior Center, HVAC UpgradeFacilitiesFacilities$25,000
- 4Page Street ConstructionPublic WorksPublic Works$150,000
- 5Master PlanGeneral governmentGeneral government$110,000
- 6Two Way Radio SystemPublic WorksPublic Works$35,000
- 7K-9PolicePolice$24,250
- 8Police Vehicle, 1 Marked Addition to FleetPolicePolice$62,000
- 9Town Hall Repairs- Vertex Year 2, Items 7-11 & 13FacilitiesFacilities$96,000
- 10Flat Hill Road Drainage Design/Bid DocsPublic WorksPublic Works$45,000
- 11Marshall Park SurveyPublic WorksPublic Works$25,000
- 12Records Retention ProjectGeneral governmentGeneral government$62,500
- 13Utility Tractor/Rotary Mower ComboPublic WorksPublic Works$170,000
- 14One Ton Dump Truck with PlowSchoolsSchools$58,833
- 15Senior Center, Vertex Items #4, 7 (1998 Roof Replacement)FacilitiesFacilities$35,661
- 16One Ton Dump with Plow (Replaces Ford Dump 350)Public WorksPublic Works$58,000
- 17Brooks House-Vertex Items #3, #4 FoundationFacilitiesFacilities$24,000
- 18MowerSchoolsSchools$45,000
- 19Police Vehicle, 1 Marked F150, Addition to FleetPolicePolice$67,805
- 20Old Primary-Vertex Haz. Matls AbatementFacilitiesFacilities$371,000
- 21Senior Center, Install GeneratorFacilitiesFacilities$90,000
The highest-ranked request left unfunded
22Ritter Repairs- Vertex Year 0-1FacilitiesFacilities$182,000- 23Senior Center, ADA Patio (Design & Construction)FacilitiesFacilities$100,000
- 24Brooks House-Vertex Items #5-12 EnvelopeFacilitiesFacilities$132,000
- 25Brooks House- Vertex Year 0-1FacilitiesFacilities$111,000
- 26AC for Classrooms at Primary SchoolSchoolsSchools$232,800
- 27Senior Center, New Parking LotFacilitiesFacilities$150,000
- 28PSB, Construct Records RoomFacilitiesFacilities$230,000
- 29PSB, Develop Unused Space, FireFacilitiesFacilities$132,000
- 30TC Passios Repairs- Vertex Year 0-1FacilitiesFacilities$943,200
What it means: Read down the list: where the solid bars stop is where the money ran out, and any solid bar below that point was funded out of order.
2 funded projects sat below rank 22, the highest-ranked request left unfunded.
What it means: Funding did not stop at one line in the committee’s order; the outcome document records the vote, not the reason.
2
funded below the first unfunded rank (ours)
our estimate
Requested, never ranked
- Town Beach Building RepairsTown Facilities · amount not printeddropped before ranking
Why: removed before ranking for want of a cost estimate -- but the deck does not name the project (document; that it is this request is our match)
Ranked in: never, FY2023 to FY2027
- Town Hall, remove, replace, repair electrical, phone & cable wiringTown Facilities · $50,000dropped before ranking
Why: none recorded (minutes and recordings searched)
Ranked in: never, FY2023 to FY2027
- PSB, HVAC and Window AssessmentTown Facilities · amount not printedwithdrawn
Why: DPW Director recommended taking it off; drainage work would relieve moisture; Town Manager wants a professional window assessment, possibly Green Communities funded (document)
Ranked in: never, FY2023 to FY2027
- Police replacement cruiser (4th police item)Police · amount not printedmoved to a later year
Why: pushed out of FY2023; why is not recorded (document)
Ranked in: never, FY2023 to FY2027
- Replace Engine 2 chassisFire · $115,000moved to FY2024
Why: Fire Chief not satisfied with the estimates received; chassis cost hard to pin down (document)
Ranked in: never, FY2023 to FY2027
Folded into requests the committee did rank
- Flat Hill Road Drainage ConstructionHighway (DPW infrastructure) · amount not printedfolded into a ranked request
Why: none recorded (minutes and recordings searched)
Ranked in: FY2023 rank 10 of 30 (funded)
What it means: The ranked list is not every request; these never reached it.
5 requests made for FY2023 never reached the ranked list; 4 of 5 have a stated reason.
What it means: The list the committee ranked is what reached it, not every request a department made.
5
requested and never ranked
4 of 5
with a reason a document or recording states
Source [4]
Two orders of one list
What it means: Where the lines cross, the two printed orders disagree about what comes first.
Source [1]
The Town Manager’s rank differed from the committee’s on 10 of 30 requests, by up to 3 places.
What it means: Two printed orders exist for this year; neither alone says what comes first.
10 of 30
requests the two ranks place differently
3
the largest move between the two
Who asked, who got
What it means: A band that narrows was a smaller share of what was funded than of what was requested.
Facilities requested 65.5% of the dollars and received 35.4% of what was funded.
What it means: A share of dollars, not of projects: one large request moves it more than several small ones.
65.5%
Facilities’ share of the dollars requested
35.4%
Facilities’ share of the dollars funded
| Department | Cost | Capital Planning Committee | Town Manager | Collins Center score | Funded | |
|---|---|---|---|---|---|---|
| PSB, Eng. Design for Drainage & Pavement Repairs | Facilities | $25,000 | 1 | 3 | 36 | yes |
| 10-Wheel, plow & sand Repl. 1994 Mack | Public Works | $250,000 | 2 | 2 | 47 | yes |
| Senior Center, HVAC Upgrade | Facilities | $25,000 | 3 | 4 | 52 | yes |
| Page Street Construction | Public Works | $150,000 | 4 | 1 | 81 | yes |
| Master Plan | General government | $110,000 | 5 | 5 | 70 | yes |
| Two Way Radio System | Public Works | $35,000 | 6 | 6 | 41 | yes |
| K-9 | Police | $24,250 | 7 | 7 | 69 | yes |
| Police Vehicle, 1 Marked Addition to Fleet | Police | $62,000 | 8 | 8 | 54 | yes |
| Town Hall Repairs- Vertex Year 2, Items 7-11 & 13 | Facilities | $96,000 | 9 | 9 | 66 | yes |
| Flat Hill Road Drainage Design/Bid Docs | Public Works | $45,000 | 10 | 10 | 60 | yes |
| Marshall Park Survey | Public Works | $25,000 | 11 | 14 | 30 | yes |
| Records Retention Project | General government | $62,500 | 12 | 12 | 67 | yes |
| Utility Tractor/Rotary Mower Combo | Public Works | $170,000 | 13 | 13 | 46 | yes |
| One Ton Dump Truck with Plow | Schools | $58,833 | 14 | 11 | 61 | yes |
| Senior Center, Vertex Items #4, 7 (1998 Roof Replacement) | Facilities | $35,661 | 15 | 15 | 61 | yes |
| One Ton Dump with Plow (Replaces Ford Dump 350) | Public Works | $58,000 | 16 | 16 | 37 | yes |
| Brooks House-Vertex Items #3, #4 Foundation | Facilities | $24,000 | 17 | 18 | 47 | yes |
| Mower | Schools | $45,000 | 18 | 17 | 42 | yes |
| Police Vehicle, 1 Marked F150, Addition to Fleet | Police | $67,805 | 19 | 19 | 54 | yes |
| Old Primary-Vertex Haz. Matls Abatement | Facilities | $371,000 | 20 | 20 | 53 | yes |
| Senior Center, Install Generator | Facilities | $90,000 | 21 | 21 | — | yes |
| Ritter Repairs- Vertex Year 0-1 | Facilities | $182,000 | 22 | 22 | — | no |
| Senior Center, ADA Patio (Design & Construction) | Facilities | $100,000 | 23 | 23 | — | yes |
| Brooks House-Vertex Items #5-12 Envelope | Facilities | $132,000 | 24 | 25 | — | no |
| Brooks House- Vertex Year 0-1 | Facilities | $111,000 | 25 | 26 | — | no |
| AC for Classrooms at Primary School | Schools | $232,800 | 26 | 24 | — | yes |
| Senior Center, New Parking Lot | Facilities | $150,000 | 27 | 27 | — | no |
| PSB, Construct Records Room | Facilities | $230,000 | 28 | 28 | — | no |
| PSB, Develop Unused Space, Fire | Facilities | $132,000 | 29 | 29 | — | no |
| TC Passios Repairs- Vertex Year 0-1 | Facilities | $943,200 | 30 | 30 | — | no |
| Funded of requested | Requested | Share of requests | Funded | Share of funded | Its own dollars funded | |
|---|---|---|---|---|---|---|
| Facilities | 8 of 15 | $2,646,861 | 65.5% | $766,661 | 35.4% | 29.0% |
| Public Works | 7 of 7 | $733,000 | 18.1% | $733,000 | 33.9% | 100.0% |
| Schools | 3 of 3 | $336,633 | 8.3% | $336,633 | 15.6% | 100.0% |
| General government | 2 of 2 | $172,500 | 4.3% | $172,500 | 8.0% | 100.0% |
| Police | 3 of 3 | $154,055 | 3.8% | $154,055 | 7.1% | 100.0% |
Shares of dollars. Requested means every request the committee’s list holds.
What the documents do not show
Each department’s own order of its requests. Closes: each department’s FY2023 priority list, requested by records request on 20 November 2026.
Every request each department filed for FY2023, including any never presented or minuted. Closes: each department’s complete request list, requested by records request on 20 November 2026.
Sources
- [1]Town Manager — FY2023 Capital Investment Plan presentation, 18 January 2022
- [2]Town of Lunenburg — FY2022 annual town report (Article 6, May 2022)
- [3]Lunenburg Budget Project — capital-rankings.csv, every row and its page or cell
- [4]Lunenburg Budget Project — capital-requests-unranked.csv, every request made and never ranked, with the page, line or second it was read from