FY2024 capital plan
lunenburgbudgetproject.org — written by the Lunenburg Budget Project, an independent tool for residents. Not affiliated with the Town of Lunenburg, the School Committee or the school district. The data this page is computed from: /data/topics/capital-fy2024.json
12 of 29 capital requests were funded, 68.9% of the dollars requested.
From ranked to funded
1Ranked by the Capital Planning Committee
29 requests · $2,941,010
Town Manager — FY2024 capital plan presentation
23 requests ranked here were not in it
2In the Town Manager’s plan as presented
6 requests · $1,360,500
Town Manager — FY2024 capital plan presentation
6 requests it left out were added
3Funded at Town Meeting
12 requests · $2,025,010
Town of Lunenburg — FY2023 annual town report (Article 6, May 2023)
What it means: The final plan was larger than the Town Manager’s first one; the first draft was not the ceiling.
12 of 29 requests were funded, 68.9% of the dollars; the first plan held 6.
What it means: The rest was not cancelled by this vote; the road-back grid on the hub shows which requests came back.
12
funded
29
ranked requests
68.9%
of the requested dollars funded
6
in the first plan
Every request, in rank order
- 1Replacement Rescue 1FireFire$506,000
- 2THES Exterior Door Upgrades/ReplacementsSchoolsSchools$160,000
- 3THES Security UpgradesSchoolsSchools$131,000
- 4Primary Security UpgradesSchoolsSchools$83,500
- 56 Wheel Dump/Spreader/Plow Truck 2Public WorksPublic Works$240,000
- 66 Wheel Dump/Spreader/Plow TruckPublic WorksPublic Works$240,000
- 7THES Upgrade Fire Alarm SystemSchoolsSchools$287,000
- 8Public Safety Radio system- Update/Replace Obsolete Hardware Phase 1FireFire$242,510
- 9New 1/2 Ton 4WD Crewcab PickupPublic WorksPublic Works$55,000
The highest-ranked request left unfunded
10TC Passios Ansul Inspection, Charge, Operational Maintenance Vertex Item #25FacilitiesFacilities$25,000- 11Northfield Culvert (Kellys Pond) Survey/Design/PermitPublic WorksPublic Works$25,000
- 12Public Safety Building, Downspout RepairsFacilitiesFacilities$25,000
- 13Parks McNally ParkFacilitiesFacilities$50,000
- 14TC Passios Side Walk Repair Vertex Item #4FacilitiesFacilities$25,000
- 15School Pickup Truck with Plow and SanderSchoolsSchools$68,000
- 16Cemetery, Turf RestorationPublic WorksPublic Works$50,000
- 17Parks, Whalom Lake/Marshall Pond TreatmentFacilitiesFacilities$30,000
- 18LMHS, THES, Primary- Installation of 3M Window Safety FilmSchoolsSchools$130,000
- 19Cemetery, Headstone RestorationPublic WorksPublic Works$38,000
- 20TC Passios, Abatement Testing Vertex Item#21FacilitiesFacilities$50,000
- 21MS/HS Turf Field Feasibility StudySchoolsSchools$50,000
- 22Ritter Building, Floor Covering Replacement Vertex Item #14FacilitiesFacilities$65,000
- 23Ritter Building, Painting, Vertex Year 2 Items #15-16FacilitiesFacilities$65,000
- 24TC Passios Plumbing Upgrade Vertex Item #24FacilitiesFacilities$20,000
- 25Brooks House, Roof/Gutter Repairs Vertex 10-12FacilitiesFacilities$20,000
- 26Brooks House, Exterior Doors Vertex Repairs Item #7FacilitiesFacilities$20,000
- 27Senior Center, Parking LotFacilitiesFacilities$150,000
- 28Brooks House, Porch / Fire Escape Engineering and Repair Vertex Item #8-9FacilitiesFacilities$40,000
- 29Brooks House, Window Repairs Vertex Items #5-6FacilitiesFacilities$50,000
What it means: Read down the list: where the solid bars stop is where the money ran out, and any solid bar below that point was funded out of order.
3 funded projects sat below rank 10, the highest-ranked request left unfunded.
What it means: Funding did not stop at one line in the committee’s order; the outcome document records the vote, not the reason.
3
funded below the first unfunded rank (ours)
our estimate
Requested, never ranked
- Marshall Park EngineeringFacilities, Parks & Recreation · $200,000left unrated
Why: facilities said the request would be withdrawn if the Special Town Meeting article for Marshall Park engineering passed; the STM voted it (Article 4, 15 Nov 2022) (meeting recording, captions)
Ranked in: never, FY2023 to FY2027
- Flat Hill Road Drainage ConstructionPublic Works (infrastructure) · $240,000left unrated
Why: CPC chair said there was not enough information to support it (no plan for where the water goes); a motion not to rate it was floated and held off (meeting recording, captions)
Ranked in: never, FY2023 to FY2027
- Replace Engine 2 chassisFire · $126,500moved to FY2025
Why: moved out a year due to higher priority items (document)
Ranked in: never, FY2023 to FY2027
Folded into requests the committee did rank
- 6 Wheel Dump/Spreader/Plow TruckPublic Works (equipment) · $240,000folded into a ranked request
Why: none recorded (minutes and recordings searched)
Ranked in: FY2024 rank 6 of 29 (funded)
- Cemetery - Hedge Restoration, Turf Restoration, Headstone Restoration and Layout plots in new sectionPublic Works (infrastructure) · $81,600folded into a ranked request
Why: CPC asked the DPW Director to unbundle the items under $20,000 from the project (meeting recording, captions)
Ranked in: FY2024 rank 16 of 29 (not funded); FY2024 rank 19 of 29 (not funded)
What it means: The ranked list is not every request; these never reached it.
3 requests made for FY2024 never reached the ranked list; 3 of 3 have a stated reason.
What it means: The list the committee ranked is what reached it, not every request a department made.
3
requested and never ranked
3 of 3
with a reason a document or recording states
Source [6]
Two orders of one list
What it means: Where the lines cross, the two printed orders disagree about what comes first.
Source [1]
The Town Manager’s rank differed from the committee’s on 18 of 29 requests, by up to 9 places.
What it means: Two printed orders exist for this year; neither alone says what comes first.
18 of 29
requests the two ranks place differently
9
the largest move between the two
Who asked, who got
What it means: A band that narrows was a smaller share of what was funded than of what was requested.
Facilities requested 21.6% of the dollars and received 2.7% of what was funded.
What it means: A share of dollars, not of projects: one large request moves it more than several small ones.
21.6%
Facilities’ share of the dollars requested
2.7%
Facilities’ share of the dollars funded
| Department | Cost | Capital Planning Committee | Town Manager | Members’ average rank | Collins Center score | Funded | |
|---|---|---|---|---|---|---|---|
| Replacement Rescue 1 | Fire | $506,000 | 1 | 1 | 2.2 | 34 | yes |
| THES Exterior Door Upgrades/Replacements | Schools | $160,000 | 2 | 2 | 3.8 | 31 | yes |
| THES Security Upgrades | Schools | $131,000 | 3 | 3 | 4.4 | 34 | yes |
| Primary Security Upgrades | Schools | $83,500 | 4 | 4 | 5 | 33 | yes |
| 6 Wheel Dump/Spreader/Plow Truck 2 | Public Works | $240,000 | 5 | 6 | 5.6 | 29 | yes |
| 6 Wheel Dump/Spreader/Plow Truck | Public Works | $240,000 | 6 | 5 | 5.8 | 32 | yes |
| THES Upgrade Fire Alarm System | Schools | $287,000 | 7 | 7 | 8.6 | 38 | yes |
| Public Safety Radio system- Update/Replace Obsolete Hardware Phase 1 | Fire | $242,510 | 8 | 8 | 8.8 | 47 | yes |
| New 1/2 Ton 4WD Crewcab Pickup | Public Works | $55,000 | 9 | 10 | 11 | 33 | yes |
| TC Passios Ansul Inspection, Charge, Operational Maintenance Vertex Item #25 | Facilities | $25,000 | 10 | 11 | 11.8 | 30 | no |
| Northfield Culvert (Kellys Pond) Survey/Design/Permit | Public Works | $25,000 | 11 | 9 | 12.6 | 49 | yes |
| Public Safety Building, Downspout Repairs | Facilities | $25,000 | 12 | 14 | 13.2 | 17 | no |
| Parks McNally Park | Facilities | $50,000 | 13 | 16 | 14.8 | 20 | no |
| TC Passios Side Walk Repair Vertex Item #4 | Facilities | $25,000 | 14 | 12 | 15.4 | 25 | yes |
| School Pickup Truck with Plow and Sander | Schools | $68,000 | 15 | 19 | 15.6 | 37 | no |
| Cemetery, Turf Restoration | Public Works | $50,000 | 16 | 25 | 15.8 | 15 | no |
| Parks, Whalom Lake/Marshall Pond Treatment | Facilities | $30,000 | 17 | 13 | 16.4 | 27 | yes |
| LMHS, THES, Primary- Installation of 3M Window Safety Film | Schools | $130,000 | 18 | 20 | 17 | 22 | no |
| Cemetery, Headstone Restoration | Public Works | $38,000 | 19 | 15 | 17.4 | 19 | no |
| TC Passios, Abatement Testing Vertex Item#21 | Facilities | $50,000 | 20 | 17 | 18.6 | 47 | no |
| MS/HS Turf Field Feasibility Study | Schools | $50,000 | 21 | 18 | 18.6 | 22 | no |
| Ritter Building, Floor Covering Replacement Vertex Item #14 | Facilities | $65,000 | 22 | 22 | 19.2 | 24 | no |
| Ritter Building, Painting, Vertex Year 2 Items #15-16 | Facilities | $65,000 | 23 | 23 | 19.4 | 12 | no |
| TC Passios Plumbing Upgrade Vertex Item #24 | Facilities | $20,000 | 24 | 24 | 22.4 | 10 | no |
| Brooks House, Roof/Gutter Repairs Vertex 10-12 | Facilities | $20,000 | 25 | 26 | 25 | 24 | no |
| Brooks House, Exterior Doors Vertex Repairs Item #7 | Facilities | $20,000 | 26 | 27 | 26 | 16 | no |
| Senior Center, Parking Lot | Facilities | $150,000 | 27 | 21 | 26.4 | 28 | no |
| Brooks House, Porch / Fire Escape Engineering and Repair Vertex Item #8-9 | Facilities | $40,000 | 28 | 28 | 26.8 | 29 | no |
| Brooks House, Window Repairs Vertex Items #5-6 | Facilities | $50,000 | 29 | 29 | 27.4 | 29 | no |
| Funded of requested | Requested | Share of requests | Funded | Share of funded | Its own dollars funded | |
|---|---|---|---|---|---|---|
| Schools | 4 of 7 | $909,500 | 30.9% | $661,500 | 32.7% | 72.7% |
| Fire | 2 of 2 | $748,510 | 25.5% | $748,510 | 37.0% | 100.0% |
| Public Works | 4 of 6 | $648,000 | 22.0% | $560,000 | 27.7% | 86.4% |
| Facilities | 2 of 14 | $635,000 | 21.6% | $55,000 | 2.7% | 8.7% |
Shares of dollars. Requested means every request the committee’s list holds.
What the documents do not show
Each department’s own order of its requests. Closes: each department’s FY2024 priority list, requested by records request on 20 November 2026.
Every request each department filed for FY2024, including any never presented or minuted. Closes: each department’s complete request list, requested by records request on 20 November 2026.
Sources
- [1]Town Manager — FY2024 capital plan presentation
- [2]Capital Planning Committee — FY2024 composite project ranking
- [3]Capital Planning Committee — FY2024 composite rankings, Rev. B (sent by its Chair, 20 November 2026)
- [4]Town of Lunenburg — FY2023 annual town report (Article 6, May 2023)
- [5]Lunenburg Budget Project — capital-rankings.csv, every row and its page or cell
- [6]Lunenburg Budget Project — capital-requests-unranked.csv, every request made and never ranked, with the page, line or second it was read from